Fire Sprinkler & Fire Alarm System Permit — City of Globe, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://www.globeaz.gov/o/cog/page/fire-plan-review-and-permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fire Sprinkler & Fire Alarm System Permit in City of Globe, Arizona
The City of Globe has its own municipal Fire Department (19 career firefighters plus reserves, led by Fire Chief Gary Robinson and Fire Marshal Tom Murtha) rather than relying on a rural fire district, and administers fire protection system permitting directly. Fire sprinkler and fire alarm systems (together with fire pumps, standpipes, hydrant flow tests, fire line/civil work, and kitchen hood systems) are reviewed by the Fire Marshal through the same CitizenServe portal used for Building permits, under the 2021 International Fire Code as locally amended by Ordinance No. 889. The City of Globe Fee Schedule Resolution No. 1904, Exhibit A has NO dedicated 'fire sprinkler' or 'fire alarm' line item — confirmed by a direct full-text search of the adopted fee schedule PDF, which contains no such entry. Fire protection system work is instead billed under the same general Permit Valuation Fee sliding scale used for other Stand-Alone permits, plus the general hourly Plan Review and Inspection fees; a single combined slug is used here because Globe does not treat sprinkler and alarm systems as separately billed permit products.
Verified 2026-07-23 · Source
When you need this permit
- Fire protection system plans (fire sprinkler, fire alarm, fire pump, standpipe, hydrant flow test, fire line/civil, and kitchen hood systems) must be professionally designed/engineered and submitted via the CitizenServe portal for review by the Fire Marshal
- Digital/electronic plan submittals for Fire Protection Systems must be legible and drawn at a scale of 1/8 inch = 1 foot, sufficient to show conformance with the City's adopted code and amendments
- Construction documents must be of sufficient clarity to indicate the location, nature, and extent of the proposed work and demonstrate compliance with the City's adopted fire code, relevant laws, ordinances, rules, and regulations
- No City of Globe fee schedule line item exists specifically for a 'fire sprinkler permit' or 'fire alarm permit' — confirmed absent via direct full-text search of the adopted Resolution 1904 Exhibit A fee schedule; the work is billed instead via the general Permit Valuation Fee sliding scale (the same table used for other Stand-Alone permits) plus hourly Plan Review Fees and Inspection Fees
- Inspections must be requested through the CitizenServe Online Portal at least one day in advance of the desired inspection date
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Fire Protection System Rough-In / Underground Inspection
Inspection of underground piping, rough-in sprinkler/alarm wiring and devices prior to concealment, conducted by the Fire Marshal or designee
- 2
Fire Protection System Final Inspection
Final acceptance test/inspection of the completed fire sprinkler or fire alarm system prior to occupancy, requested through the CitizenServe portal at least one day in advance
See the full City of Globe inspection guide — scheduling & re-inspection fees →
Tips
- The City of Globe's Plan Submittal and Review page publishes a real 15-working-day residential / 30-working-day commercial plan review timeframe that explicitly includes fire sprinkler and fire alarm systems. Source: City of Globe Plan Submittal and Review page (globeaz.gov/o/cog/page/plan-submittal-and-review). Most fire sprinkler/alarm work is on commercial buildings, so budget for the 30-working-day commercial track.
- Unlike Solar Photovoltaic Systems or Swimming Pools, which have their own dedicated fee categories, fire sprinkler and fire alarm systems have no dedicated line item in the City's fee schedule — expect your fee to be calculated off the general valuation-based Permit Valuation Fee table plus hourly plan review/inspection charges.
- Contact the Fire Marshal (Tom Murtha, (928) 701-3877) directly with questions about fire protection system permitting or submittal requirements — the Fire Department reviews these plans separately from the Building Safety Department's general plan reviewers, even though both queues publish the same 15/30-working-day timeframe.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Globe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of Globe
Fire Sprinkler & Fire Alarm System Permit in other cities
Compare fire sprinkler & fire alarm system permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your City of Globe project checklist
Describe your project once and get every permit, document, and fee it triggers in City of Globe — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →