Fire Protection Systems Permit — Fire Alarm / Fire Sprinkler / Kitchen Hood Suppression / Above-Ground Storage Tank — Camp Verde, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://www.campverde.az.gov/departments/community_development/permits.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Fire Protection Systems Permit — Fire Alarm / Fire Sprinkler / Kitchen Hood Suppression / Above-Ground Storage Tank in Camp Verde, Arizona
Covers installation of fire alarm systems, fire sprinkler systems (NFPA 13/13R commercial and NFPA 13D one-and-two-family residential), commercial kitchen hood/Ansul suppression systems, and above-ground fire protection water storage tanks in the Town of Camp Verde. Submitted as a single Town 'Fire Protection Systems Permit Application' alongside the applicable system-specific application from Copper Canyon Fire & Medical District (CCFMD) — the independent special fire district that serves Camp Verde and directly reviews/fees these systems. Camp Verde does not have its own municipal fire department; it relies on CCFMD.
Verified 2026-07-23 · Source
When you need this permit
- Town of Camp Verde 'Fire Protection Systems Permit Application' checklist required for water tanks, hood exhaust systems, fire alarms, and fire sprinklers, submitted together with the applicable CCFMD-specific application (Fire Alarm, Sprinkler System, Hood, or Tank Application)
- Copper Canyon Fire & Medical District (CCFMD), 26B Salt Mine Road, Camp Verde, AZ 86322, (928) 567-9401 — an independent fire district (established 2016 per its own letterhead) — is the fire authority serving Camp Verde and independently reviews and fees fire alarm/sprinkler/suppression/tank systems; NOTE: some of the Town's own boilerplate checklist text still refers to a 'Camp Verde Fire District' or 'CVFD', an inconsistent/stale label — the current application forms, fee schedule, and letterhead are all explicitly branded Copper Canyon Fire & Medical District
- Commercial applicants must receive Development Standards Requirements approval from Planning & Zoning before submitting for construction
- Plans not meeting the exception requirements of A.R.S. §32-144 must be designed and sealed by an Arizona-licensed Architect/Engineer
- Fire Alarm and Fire Sprinkler plans specifically must be designed/sealed by an Arizona Registered Design Professional and reference the CCFMD application available on the Town's website
- Per A.R.S. §9-807, the Town cannot mandate (or prohibit) fire sprinklers in a single-family detached residence or a residential building with 2 or fewer dwelling units, except under code/ordinance adopted before December 31, 2009
- A deposit is collected at submittal per the current adopted fee schedule; a separate permit is required for each deferred submittal item
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Fire alarm wiring/devices or sprinkler piping before covering, per CCFMD requirements
- 2
Final / CCFMD Acceptance Test
System tested and verified operational; the base CCFMD fee for most system categories includes up to 2 inspections
See the full Camp Verde inspection guide — scheduling & re-inspection fees →
Tips
- Copper Canyon Fire & Medical District (CCFMD) — not a 'Camp Verde Fire District' — is the actual, independent special fire district serving Camp Verde; the CCFMD-branded application forms and fee schedule (www.ccfmd.az.org) are the governing documents, even though some older boilerplate text on the Town's own checklists still uses the 'CVFD'/'Camp Verde Fire District' label.
- Both a Town-collected, valuation-based Building Permit Fee AND a separate flat/tiered CCFMD fee apply to most fire alarm, sprinkler, and suppression installations — budget for both, similar to how Zoning Clearance and Building Permit fees stack on other Camp Verde permit types.
- CCFMD's fee schedule fee lines (e.g., $483 fire alarm, $600 NFPA 13/13R commercial sprinkler) each include 1 plan review, 1 re-submittal, and 2 inspections unless otherwise noted; an Expedited Plan Review is available for $572 per submittal.
- Per A.R.S. §9-807, Camp Verde cannot require (or prohibit) fire sprinklers in a single-family detached residence or a residential building of 2 units or fewer.
- For a fire system installed as part of new commercial construction or a tenant improvement (rather than a standalone retrofit), the CCFMD plan-review fee is 40% of the Town's plan review fee and is one of the components of the overall commercial project deposit.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Camp Verde
Fire Protection Systems Permit — Fire Alarm / Fire Sprinkler / Kitchen Hood Suppression / Above-Ground Storage Tank in other cities
Look up this fee in a different city →
Now live
Build your Camp Verde project checklist
Describe your project once and get every permit, document, and fee it triggers in Camp Verde — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →