EV Charger / EVSE Permit — Camp Verde, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://www.campverde.az.gov/departments/community_development/permits.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Camp Verde, Arizona
Installation of an electric vehicle charger (EVSE) at a Camp Verde property is electrical work, most likely processed under the Town's Residential Over-the-Counter (OTC) Electrical permit — the same fast-track category explicitly used for 'electrical service upgrades' — since no distinct EV-charger/EVSE line item exists in the Town of Camp Verde FY26 Fee Schedule.
Verified 2026-07-20 · Source
When you need this permit
- Available as a minor residential electrical project (e.g., electrical service upgrade) under the OTC Electrical permit, per the Town's over-the-counter permit category
- Governed by the 2023 NEC as adopted by the Town of Camp Verde (Ordinance 2026-A512, effective 02-26-2026)
- Apply via the GovWell One-Stop Permitting Portal
- No EV-charger-specific application form, checklist, or fee category was found published separately from the general OTC Electrical / standard Electrical Permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Circuit wiring before covering, where applicable
- 2
Final
EVSE connection operational and verified per adopted code
See the full Camp Verde inspection guide — scheduling & re-inspection fees →
Tips
- Camp Verde does not publish a distinct EV-charger/EVSE permit — a residential installation most likely qualifies for the fast-track OTC Electrical permit ($90 flat, 0-3 business days), the same category the Town uses for general electrical service upgrades.
- A larger-scale or commercial EVSE installation (e.g., multiple Level 2 or DC fast chargers) would likely exceed the OTC scope and require a standard Commercial Building Permit instead — confirm scope with Development Services before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Camp Verde
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Camp Verde project checklist
Describe your project once and get every permit, document, and fee it triggers in Camp Verde — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →