EV Charger / EVSE Permit in Camp Verde, Arizona
Installation of an electric vehicle charger (EVSE) at a Camp Verde property is electrical work, most likely processed under the Town's Residential Over-the-Counter (OTC) Electrical permit — the same fast-track category explicitly used for 'electrical service upgrades' — since no distinct EV-charger/EVSE line item exists in the Town of Camp Verde FY2026-27 Consolidated Fee Schedule (Resolution 2026-1217, effective 7/1/2026) either. Note that the Copper Canyon Fire & Medical District schedule, which the Town's Development Permits page says governs all fire-related fees, does now carry an 'EV Charging Stations (plan review and 1 inspection) — $180.00' line; whether it is triggered by a simple residential charger is not stated by either body, which is why this permit type is marked partial.
Reviewed 2026-08-16 · Source
When you need this permit
- Available as a minor residential electrical project (e.g., electrical service upgrade) under the OTC Electrical permit, per the Town's over-the-counter permit category
- Governed by the 2023 NEC as adopted by the Town of Camp Verde (Ordinance 2026-A512, effective 02-26-2026)
- Apply via the GovWell One-Stop Permitting Portal
- No EV-charger-specific application form, checklist, or fee category was found published separately from the general OTC Electrical / standard Electrical Permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Over the Counter Permits → Electrical — $90' (row 428), no FY2026-27 change recorded. Show full citationHide
UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Residential Over the Counter Permits → Electrical — $90' (row 428), no FY2026-27 change recorded. The adopted FY2026-27 schedule still contains no distinct EV-charger/EVSE line item of its own, and now also offers a Commercial Over the Counter Electrical permit at the same $90.NEW INFORMATION, not a change to a figure we previously published. Show full citationHide
NEW INFORMATION, not a change to a figure we previously published. The Town's Development Permits page states plainly that 'Any fire-related fees are subject to the Copper Canyon Fire & Medical District Fee Schedule', and the district's current schedule carries a line in its PHOTOVOLTAIC AND BESS table reading 'EV Charging Stations (plan review and 1 inspection) — $180.00', read from a 200-dpi render of page 2 on 2026-08-16. The line does not distinguish residential from commercial installations and neither the Town nor the district publishes any statement about whether a single residential EVSE triggers a fire-district plan review at all. It is recorded here because a $180 charge on top of a $90 permit materially changes the cost of this permit if it applies, and omitting it would understate the total; it is NOT recorded as an established charge for residential work. Confirm with the Building Division and CCFMD before budgeting.Review timeline
Inspection process
- 1
Rough-In
Circuit wiring before covering, where applicable
- 2
Final
EVSE connection operational and verified per adopted code
See the full Camp Verde inspection guide — scheduling & re-inspection fees →
Tips
- Camp Verde does not publish a distinct EV-charger/EVSE permit — a residential installation most likely qualifies for the fast-track OTC Electrical permit ($90 flat, 0-3 business days), the same category the Town uses for general electrical service upgrades. Re-confirmed against the adopted FY2026-27 schedule on 2026-08-16: the $90 is unchanged and there is still no EV line in the Town schedule.
- A larger-scale or commercial EVSE installation (e.g., multiple Level 2 or DC fast chargers) would likely exceed the OTC scope and require a standard Commercial Building Permit instead — confirm scope with Development Services before applying.
- Budget for a possible fire-district charge on top of the Town's $90. The Town's Development Permits page states that all fire-related fees are governed by the Copper Canyon Fire & Medical District schedule, and that schedule now lists 'EV Charging Stations (plan review and 1 inspection) — $180.00'. Neither body publishes whether that line is triggered by a single residential charger, so ask before you assume the permit costs $90.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-16.
Fee schedules
Applications & forms
Online permit portal
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Camp Verde's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Camp Verde yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Camp Verde lands. Privacy.
Other permits in Camp Verde
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Camp Verde project checklist
Describe your project once and get every permit, document, and fee it triggers in Camp Verde — in one checklist. Free, for any city and any number of projects.
Get started →