EV Charger / EVSE Installation Permit in Benson, Arizona
Benson has no separate EV charger/EVSE permit category or fee line. Installing a new dedicated 120V or 240V circuit for an EV charger is billed as a standard Electrical Permit under the same valuation-based Building Division fee schedule used for all other electrical work, governed by the 2023 NEC as adopted by Ordinance 645.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for a new dedicated 120V or 240V circuit installed for an EV charging station; a permit is generally NOT required if a UL-listed cord-and-plug charger is plugged into an existing 120V receptacle with no new wiring (consistent with neighboring Cochise/Pima County practice; not independently confirmed in a Benson-specific document)
- Governed by the 2023 NEC as adopted by the City of Benson (2014 NEC for applications submitted before May 13, 2026)
- No dedicated EV/EVSE fee line exists on the City Code's Chapter 16 fee schedule; billed under the same valuation-based Building Permit Fee table as all other electrical/trade work
- Apply via the online iWorQ Building Permit Application portal with a signed A.R.S. Title 32 form
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Intermediates (Rough-In) / Final
Same two-stage sequence as any standalone electrical permit: wiring/panel connections before walls closed, then final device/connection verification per the 2023 NEC
See the full Benson inspection guide — scheduling & re-inspection fees →
Tips
- Benson does not publish a distinct EV charger/EVSE permit category or fee — apply for a standard electrical permit through the iWorQ portal and describe the EV charging circuit scope.
- A permit is likely not required only where an existing 120V receptacle is used with a UL-listed cord-and-plug charger and no new circuit is installed — this is standard practice in neighboring Cochise/Pima County jurisdictions, but was not found explicitly stated in a City of Benson document, so confirm with the Building Department (520-720-6328) before assuming it applies.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Benson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Benson
EV Charger / EVSE Installation Permit in other cities
Compare ev charger / evse installation permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Benson project checklist
Describe your project once and get every permit, document, and fee it triggers in Benson — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →