Benson building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Benson, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
120 W. 6th Street, Benson, AZ 85602 (City Hall / general administration: 101 E. 6th Street, Benson, AZ 85602)
Phone
520-720-6328
Office hours
City Hall general office hours: Monday, Tuesday, Thursday, Friday 8:00 AM - 5:00 PM MST; Wednesday 1:00 PM - 5:00 PM MST (Source: City of Benson Contact Us page). Building permit applications are submitted online via the City's iWorQ citizen portal (bensonbuilding.portal.iworq.net); all plan documents, calculations, drawings, and spec sheets must be uploaded in PDF format (image files such as JPEG/TIFF/GIF are not accepted). Plan reviews are performed on a first-come, first-served basis; emergency repairs such as utility or structural failures may take precedence. To request an inspection, email permits@bensonaz.gov at least 24 hours in advance with name, contact number, requested date, permit number, project address, and inspection type.

Published scheduling rules

  • Benson has its own municipal Fire Department (not a separate Cochise County rural fire district) — direct fire-plan-review and inspection requests, including the annual business walk-through, to fireinspections@bensonaz.gov. (Fire Sprinkler System & Fire Alarm System Permit)
  • Fire inspection requests, including the annual business walk-through, are directed to the Fire Department at fireinspections@bensonaz.gov (per the live Building Department page) (Fire Sprinkler System & Fire Alarm System Permit)

Inspection sequence

Applies to: Residential Building Permit (New Single-Family / Duplex / Multi-Family Construction)

  1. 1

    Setbacks

    Verifies structure location against approved site plan; performed at sub-floor plumbing or footing inspection stage

  2. 2

    Underground Utilities

    Prior to backfill/compaction and prior to placement of concrete

  3. 3

    Foundation (Footing/Rebar pre-pour, Interior Footings, Pre-slab pre-pour, Soil Compaction, Stem)

    Multiple sub-inspections before concrete pour; minimum 95% soil compaction required for building pad

  4. 4

    Framing

    Includes floor deck, rough frame, and lateral bracing/shear wall inspections

  5. 5

    Lath

    After vapor barrier, foam, and wire installed

  6. 6

    Gas / Electrical (if applicable)

    Rough gas piping and electrical inspections where applicable

  7. 7

    Intermediates / Insulation / Sheetrock

    Nailing inspection prior to taping or texture; gas test inspection may occur at this stage or later

  8. 8

    Final

    All phases of construction complete, just prior to occupancy

Applies to: Manufactured Home / Factory-Built Building Installation Permit

  1. 1

    Setbacks

    Verifies placement against approved site plan and zoning setbacks

  2. 2

    Underground Utilities

    Where applicable to the installation

  3. 3

    Electrical / Gas (if applicable)

    Utility connection inspections where applicable

  4. 4

    Tie Down / Supports

    Verifies anchoring and support pier installation per ADOH installation standards

  5. 5

    Final

    Completed installation verified against approved plans and State Insignia of Approval affixed

Applies to: Residential Addition / Remodel / Accessory Structure Permit

  1. 1

    Setbacks

    Verifies addition/accessory structure location against approved site plan

  2. 2

    Foundation

    Required before concrete pour for additions and pre-built accessory structure foundations

  3. 3

    Framing (stick-built) / Anchoring-Tie Downs (pre-built)

    Framing Floor Deck and Framing Rough for stick-built structures; anchoring/tie-downs for pre-built accessory structures

  4. 4

    Intermediates / Sheetrock

    Electrical and plumbing rough-ins where applicable, prior to closing walls

  5. 5

    Final

    Completed work verified against approved plans (Final - All Trades for pre-built accessory structures)

Applies to: Plumbing Permit

  1. 1

    Underground Utilities

    Prior to backfill and compaction, before placement of concrete

  2. 2

    Gas Piping / 200# Test

    Gas line pressure test where applicable (Fire/Plumbing category on the Required Inspections List)

  3. 3

    Intermediates

    Rough plumbing inspection after pipes installed, before walls closed

  4. 4

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Sign Permit (Commercial / Business Signage)

  1. 1

    Setbacks

    Verifies sign placement complies with the approved site plan and zoning-district location requirements

  2. 2

    Electrical (if applicable)

    For illuminated signs with electrical connections

  3. 3

    Final

    Completed sign verified against approved permit (size, height, placement, illumination)

Applies to: Electrical Permit

  1. 1

    Intermediates (Rough-In)

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed and connections verified per the 2023 NEC (or 2014 NEC for pre-May-13-2026 applications)

Applies to: Fire Sprinkler System & Fire Alarm System Permit

  1. 1

    Fire Alarm

    Verifies fire alarm/detection system installation per the 2024 IFC (or 2015 IFC for pre-May-13-2026 applications); listed as its own item on the City's Required Inspections List, Fire category

  2. 2

    Fire Suppression

    Verifies automatic fire sprinkler system installation, including hydrant/riser connections; listed as its own item on the City's Required Inspections List, Fire category

Applies to: Re-Roofing Permit

  1. 1

    Roof Deck

    Verifies sheathing and deck condition before roofing material is applied

  2. 2

    Final

    Completed roofing material and flashing verified

Re-inspection fees

Commercial Building Permit
Re-inspection Fee · Locally-amended Building Code Section 109.7: at the Building Official's discretion, a re-inspection fee may be assessed for each inspection where called-for work is incomplete or… Show full citationRe-inspection Fee · Locally-amended Building Code Section 109.7: at the Building Official's discretion, a re-inspection fee may be assessed for each inspection where called-for work is incomplete or corrections are not made; a 24-hour waiting period applies after payment before the next inspection may be requested.
Per the fee schedule in City Code Chapter 16; no separate commercial-specific dollar figure published

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Benson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Benson building permits

Get alerts for Benson

We'll email you when Benson's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.