Skip to main content
PermitBase

Plumbing Permit in Benson, Arizona

Required for plumbing installation, alteration, or repair work in Benson, governed by the 2024 International Plumbing Code (IPC) as adopted by Ordinance 645 (2015 IPC for applications filed before May 13, 2026).

Verified 2026-07-06 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping
  • Governed by the 2024 IPC as adopted by the City of Benson (2015 IPC for applications submitted before May 13, 2026)
  • Gas piping work is separately inspected under the Fire/Plumbing inspection categories (Gas Piping, 200# Test) per the Required Inspections List
  • Apply via the online iWorQ Building Permit Application portal with a signed A.R.S. Title 32 form

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Permit — Based on ValuationCity Code of the City of Benson, Chapter 16 (Fees), Building Division, Resolution 16-2011 — Benson does not publish a separate itemized flat fee for plumbing-only permits; plumbing work is billed under the same valuation-based Building Division fee schedule
Same Building Permit Fee valuation table as other trades: $47.00 (valuation $1-$1,000) scaling up to $6,712.00 + $4.40 per additional $1,000 above $1,000,000
Plan Review FeeCity Code of the City of Benson, Chapter 16, Building Division
65 percent of the calculated permit fee

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Benson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground Utilities

    Prior to backfill and compaction, before placement of concrete

  2. 2

    Gas Piping / 200# Test

    Gas line pressure test where applicable (Fire/Plumbing category on the Required Inspections List)

  3. 3

    Intermediates

    Rough plumbing inspection after pipes installed, before walls closed

  4. 4

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

See the full Benson inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the City of Benson does not appear to publish permit-specific plan review turnaround times for plumbing permits on its public website. The City publishes permit requirements and process information, but not category-specific review timelines. There is no verifiable online source for this — call the Building Department at 520-720-6328 directly.

Frequently asked questions

Yes, plumbing work including water heater replacement requires a plumbing permit billed under the City's valuation-based Building Division fee schedule (Chapter 16), since Benson does not publish a separate flat per-unit water heater fee.

In Benson, the published Plumbing Permit — Based on Valuation is: Same Building Permit Fee valuation table as other trades: $47.00 (valuation $1-$1,000) scaling up to $6,712.00 + $4.40 per additional $1,000 above $1,000,000. Additional published fees: Plan Review Fee — 65 percent of the calculated permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Benson does not publish a plan-review timeline for this permit. Contact City of Benson Building Department (Community Development) at 520-720-6328 for current turnaround.

You'll need: Online Building/Plumbing Permit Application (iWorQ Citizen Portal); A.R.S. Title 32 Form. See the required-documents checklist on this page for details on each.

Benson requires 4 inspection(s) for a plumbing permit, in order: Underground Utilities, Gas Piping / 200# Test, Intermediates, Final. Schedule each through City of Benson Building Department (Community Development) (520-720-6328).

Apply through City of Benson Building Department (Community Development) at 120 W. 6th Street, Benson, AZ 85602 (City Hall / general administration: 101 E. 6th Street, Benson, AZ 85602). Phone: 520-720-6328, email: permits@bensonaz.gov. Office hours: City Hall general office hours: Monday, Tuesday, Thursday, Friday 8:00 AM - 5:00 PM MST; Wednesday 1:00 PM - 5:00 PM MST (Source: City of Benson Contact Us page). Building permit applications are submitted online via the City's iWorQ citizen portal (bensonbuilding.portal.iworq.net); all plan documents, calculations, drawings, and spec sheets must be uploaded in PDF format (image files such as JPEG/TIFF/GIF are not accepted). Plan reviews are performed on a first-come, first-served basis; emergency repairs such as utility or structural failures may take precedence. To request an inspection, email permits@bensonaz.gov at least 24 hours in advance with name, contact number, requested date, permit number, project address, and inspection type.. Official information: https://web.archive.org/web/20251124160757/https://www.bensonaz.gov/departments/building_department/index.php.

Benson, Arizona has adopted: Arizona has no statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (Arizona Revised Statutes Title 9). The City of Benson independently adopts and administers its own construction codes through its Building Department. Source: Ordinance 645 (City of Benson, adopted April 13, 2026), whereas clause citing A.R.S. Title 9.; 2024 International Building Code (IBC), as amended by Exhibit A to Resolution 11-2026, adopted by reference in Benson City Code Chapter 7, Section 7-1-2 ('Building Codes Adopted'). Per Ordinance 645, all new permit applications received after May 13, 2026 (30 days after the April 13, 2026 adoption date) must comply with this code; plans already in review or approved before that date may remain on the previously adopted 2015 IBC cycle. Source: Ordinance 645, City of Benson (passed and adopted April 13, 2026).; 2024 International Residential Code (IRC), as amended by Exhibit B to Resolution 11-2026, adopted by reference in Benson City Code Chapter 7, effective for new applications received on/after May 13, 2026. Source: Ordinance 645, City of Benson.; 2024 International Mechanical Code (IMC), as amended by Exhibit D to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Plumbing Code (IPC), as amended by Exhibit E to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Fuel Gas Code (IFGC), as amended by Exhibit F to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Existing Building Code (IEBC), as amended by Exhibit G to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Swimming Pool and Spa Code (ISPSC), as amended by Exhibit H to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Fire Code (IFC), as amended by Exhibit I to Resolution 11-2026, adopted by reference as the City's uniform fire code. Source: Ordinance 645, City of Benson.; 2024 International Property Maintenance Code (IPMC), as amended by Exhibit J to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference as amended by Exhibit C to Resolution 11-2026 (one edition behind the 2024 ICC set, consistent with the standard NFPA/ICC release-cycle offset). Source: Ordinance 645, City of Benson.; Immediately prior to Ordinance 645 (i.e., for plans submitted and approved before May 13, 2026), the City had adopted the 2015 editions of the International Building, Residential, Mechanical, Plumbing, Fuel Gas, Existing Building, Swimming Pool and Spa, and Property Maintenance Codes, plus the 2015 International Fire Code and 2014 NFPA 70 National Electrical Code, per the former Benson City Code Chapter 7, Section 7-1-1 (Resolution 36-2017). Source: City of Benson Building Department page (Wayback Machine capture, November 24, 2025) and City Code of the City of Benson, Arizona (posting updated April 2023).; Manufactured homes, mobile homes, and factory-built buildings: the City of Benson has an Inspection Services Agreement with the Arizona Department of Housing (ADOH), effective May 3, 2021 for a five-year term, under which the City (as ADOH's local enforcement agency) monitors and enforces ADOH's installation standards (A.R.S. § 41-4004(A)(4); A.A.C. R4-34-102, R4-34-204, R4-34-606, R4-34-801) for manufactured home, mobile home, and factory-built building installations within city limits, including setback and tie-down inspections. Source: Resolution 11-2021 and attached Inspection Services Agreement Between Arizona Department of Housing and City of Benson.; ICC A117.1-2017 Standard and Commentary (Accessible and Usable Buildings and Facilities) is referenced by the City as its accessibility standard, in addition to the federal ADA framework. Source: City of Benson Building Department page.. Local amendments apply — see the Benson overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Benson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.