Demolition Permit in Benson, Arizona

Required for demolition of any structure in Benson. Applications are submitted through the same online iWorQ portal used for building permits, and require a signed A.R.S. Title 32 form and an ADEQ Asbestos NESHAP form where applicable.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required before demolishing a structure within Benson city limits
  • Use the online Building/Demolition Permit Application (iWorQ Citizen Portal) — the same application covers Building Permits, Demolition Permits, Grubbing or Grading Permits, and Right-of-Way Construction Permits
  • Signed A.R.S. Title 32 form required as part of the application
  • ADEQ Asbestos NESHAP form (supplied on the Building Department's Document Center) must be submitted where applicable to the demolition scope

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit — Based on ValuationCity Code of the City of Benson, Chapter 16 (Fees), Building Division, Resolution 16-2011 — no separate itemized flat demolition fee was found; demolition is billed under the same valuation-based Building Division fee schedule
Same Building Permit Fee valuation table as other trades: $47.00 (valuation $1-$1,000) scaling up to $6,712.00 + $4.40 per additional $1,000 above $1,000,000

Review timeline

Plan review
Not published — contact the department

How long did your Demolition Permit permit actually take in Benson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    The Required Inspections List shows a single Final inspection for the Demolition category, confirming utility termination and site condition

See the full Benson inspection guide — scheduling & re-inspection fees →

Tips

  • The same iWorQ online application (Building/Demolition Permit Application) is used for Building Permits, Demolition Permits, Grubbing or Grading Permits, and Right-of-Way Construction Permits — select the correct permit type when applying.
  • As of July 2026, the City of Benson does not appear to publish a permit-specific plan review turnaround time for demolition permits on its public website. There is no verifiable online source for this figure — call the Building Department at 520-720-6328 directly.

Frequently asked questions

Benson requires a demolition permit for: Building permit required before demolishing a structure within Benson city limits; Use the online Building/Demolition Permit Application (iWorQ Citizen Portal) — the same application covers Building Permits, Demolition Permits, Grubbing or Grading Permits, and Right-of-Way Construction Permits; Signed A.R.S. Title 32 form required as part of the application; ADEQ Asbestos NESHAP form (supplied on the Building Department's Document Center) must be submitted where applicable to the demolition scope. If your project isn't listed, confirm with City of Benson Building Department (Community Development) at 520-720-6328 before starting work.

In Benson, the published Demolition Permit — Based on Valuation is: Same Building Permit Fee valuation table as other trades: $47.00 (valuation $1-$1,000) scaling up to $6,712.00 + $4.40 per additional $1,000 above $1,000,000. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Benson does not publish a plan-review timeline for this permit. Contact City of Benson Building Department (Community Development) at 520-720-6328 for current turnaround.

You'll need: Online Building/Demolition Permit Application (iWorQ Citizen Portal); A.R.S. Title 32 Form. Depending on your project, Benson may also ask for: ADEQ Asbestos NESHAP Form. See the required-documents checklist on this page for details on each.

Benson requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through City of Benson Building Department (Community Development) (520-720-6328).

Use the same online Building/Demolition Permit Application on the City's iWorQ citizen portal (bensonbuilding.portal.iworq.net) used for building permits, with a signed A.R.S. Title 32 form and, where applicable, the ADEQ Asbestos NESHAP form.

Benson, Arizona has adopted: Arizona has no statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (Arizona Revised Statutes Title 9). The City of Benson independently adopts and administers its own construction codes through its Building Department. Source: Ordinance 645 (City of Benson, adopted April 13, 2026), whereas clause citing A.R.S. Title 9.; 2024 International Building Code (IBC), as amended by Exhibit A to Resolution 11-2026, adopted by reference in Benson City Code Chapter 7, Section 7-1-2 ('Building Codes Adopted'). Per Ordinance 645, all new permit applications received after May 13, 2026 (30 days after the April 13, 2026 adoption date) must comply with this code; plans already in review or approved before that date may remain on the previously adopted 2015 IBC cycle. Source: Ordinance 645, City of Benson (passed and adopted April 13, 2026).; 2024 International Residential Code (IRC), as amended by Exhibit B to Resolution 11-2026, adopted by reference in Benson City Code Chapter 7, effective for new applications received on/after May 13, 2026. Source: Ordinance 645, City of Benson.; 2024 International Mechanical Code (IMC), as amended by Exhibit D to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Plumbing Code (IPC), as amended by Exhibit E to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Fuel Gas Code (IFGC), as amended by Exhibit F to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Existing Building Code (IEBC), as amended by Exhibit G to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Swimming Pool and Spa Code (ISPSC), as amended by Exhibit H to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Fire Code (IFC), as amended by Exhibit I to Resolution 11-2026, adopted by reference as the City's uniform fire code. Source: Ordinance 645, City of Benson.; 2024 International Property Maintenance Code (IPMC), as amended by Exhibit J to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference as amended by Exhibit C to Resolution 11-2026 (one edition behind the 2024 ICC set, consistent with the standard NFPA/ICC release-cycle offset). Source: Ordinance 645, City of Benson.; Immediately prior to Ordinance 645 (i.e., for plans submitted and approved before May 13, 2026), the City had adopted the 2015 editions of the International Building, Residential, Mechanical, Plumbing, Fuel Gas, Existing Building, Swimming Pool and Spa, and Property Maintenance Codes, plus the 2015 International Fire Code and 2014 NFPA 70 National Electrical Code, per the former Benson City Code Chapter 7, Section 7-1-1 (Resolution 36-2017). Source: City of Benson Building Department page (Wayback Machine capture, November 24, 2025) and City Code of the City of Benson, Arizona (posting updated April 2023).; Manufactured homes, mobile homes, and factory-built buildings: the City of Benson has an Inspection Services Agreement with the Arizona Department of Housing (ADOH), effective May 3, 2021 for a five-year term, under which the City (as ADOH's local enforcement agency) monitors and enforces ADOH's installation standards (A.R.S. § 41-4004(A)(4); A.A.C. R4-34-102, R4-34-204, R4-34-606, R4-34-801) for manufactured home, mobile home, and factory-built building installations within city limits, including setback and tie-down inspections. Source: Resolution 11-2021 and attached Inspection Services Agreement Between Arizona Department of Housing and City of Benson.; ICC A117.1-2017 Standard and Commentary (Accessible and Usable Buildings and Facilities) is referenced by the City as its accessibility standard, in addition to the federal ADA framework. Source: City of Benson Building Department page.. Local amendments apply — see the Benson overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Benson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.