Demolition Permit in Bisbee, Arizona
Required for demolition of any structure in Bisbee. Demolition within the Old Bisbee Historic District is subject to a distinct, stringent Design Review Board review requiring proof that preservation is not physically or economically feasible, and requires 30 calendar days' advance notice rather than the standard 15.
Verified 2026-07-06 · Source
When you need this permit
- Building permit required before demolishing a structure within Bisbee city limits
- Within the Old Bisbee Historic District (HP Overlay Zone), the Historic District Design Review Board must review and approve all demolition applications and relocation applications for any building or significant part of a building in the District BEFORE the Building Official may issue a demolition permit
- Historic District demolition/relocation applications require 30 calendar days' advance submittal before the DRB hearing (vs. 15 days for standard applications), due to the greater potential impact on the character of the District
- For Historic District permit approval, the applicant must show that preserving the building is not physically and/or economically feasible; the DRB determines the extent to which demolition/movement affects the structure or any contributing structure within the district
- Utilities should be properly terminated as part of standard demolition practice (not separately itemized as a distinct Bisbee ordinance requirement beyond standard code compliance)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final
Site condition verified after demolition complete
See the full Bisbee inspection guide — scheduling & re-inspection fees →
Tips
- Demolition within the Old Bisbee Historic District is the single most stringent review track in the City's permit system: the applicant must affirmatively prove preservation is not physically/economically feasible, submittal must arrive 30 calendar days (not 15) before the DRB hearing, and 300-foot neighbor notice is mandatory.
- As of July 2026, the City of Bisbee does not appear to publish permit-specific plan review turnaround times for demolition permits on its public website (outside the separately-documented Historic District DRB process, which states 'most decisions are issued within 45 days of application submittal' for DRB-track matters specifically — not for the underlying building demolition permit review itself). There is no verifiable online source for a building-permit-specific demolition review timeline — call the Building Inspector's office directly at 520-432-6000.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bisbee building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Bisbee
Demolition Permit in other cities
Compare demolition permit fees across Arizona →
Look up this fee in a different city →