Required for demolition of any structure in Carefree. Carries a flat $250.00 fee and requires pre-construction and final inspections, plus a dust-control and disposal plan.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required before demolishing a structure within Carefree town limits
  • Applicant must specify scope of work, job schedule (start/end dates), dust control measures, and whether a dumpster is required on site (with the servicing company named) and the disposal destination
  • Pre-construction inspection required before work begins; final inspection required after work is completed

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit FeeTown of Carefree Requirements for Demolition Permit (rev. Oct. 2023)
$250.00 flat

Review timeline

Plan reviewCarefree’s published plan-review target
15–35 business days

How long did your Demolition Permit permit actually take in Carefree?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Construction

    Verifies dust-control measures and site readiness before demolition work begins

  2. 2

    Final

    Verifies completed demolition and site condition after work is completed

See the full Carefree inspection guide — scheduling & re-inspection fees →

Tips

  • The Town of Carefree's Requirements for Demolition Permit form does not itself state a review-timeline figure; the general plan-review timeline published in the Town's Summary of Building Permit Process (3-4 weeks first review, 2-3 weeks second review) is applied here as the verified range absent a demolition-specific figure.
  • Both a pre-construction inspection AND a final inspection are explicitly required — unlike some jurisdictions where demolition only requires a final.

Frequently asked questions

Carefree requires a demolition permit for: Building permit required before demolishing a structure within Carefree town limits; Applicant must specify scope of work, job schedule (start/end dates), dust control measures, and whether a dumpster is required on site (with the servicing company named) and the disposal destination; Pre-construction inspection required before work begins; final inspection required after work is completed. If your project isn't listed, confirm with Town of Carefree Building Department at 480-488-3686 before starting work.

$250.00 flat, per the Town of Carefree's Requirements for Demolition Permit form (rev. Oct. 2023), which also requires a pre-construction inspection and a final inspection.

Carefree's published plan-review target for a demolition permit is 15–35 business days.

You'll need: Requirements for Demolition Permit. See the required-documents checklist on this page for details on each.

Carefree requires 2 inspection(s) for a demolition permit, in order: Pre-Construction, Final. Schedule each through Town of Carefree Building Department (480-488-3686).

Apply through Town of Carefree Building Department at 8 Sundial Circle, P.O. Box 740, Carefree, AZ 85377. Phone: 480-488-3686, email: buildingofficial@carefree.org. Office hours: Town Hall main line 480-488-3686 (fax 480-488-3845); building permits are submitted in person at Town Hall (application form completed at the counter) or by mail to 8 Sundial Circle / P.O. Box 740, Carefree, AZ 85377. The current Building Official is Robert McCoy (buildingofficial@carefree.org), per the Town's live Building Department webpage.. Official information: https://www.carefree.org/page/building.

Carefree, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9; codes adopted under A.R.S. § 9-801 are declared public records of the adopting jurisdiction). The Town of Carefree independently adopts and administers its own construction codes through its own Building Department; it does not defer permitting to Maricopa County. Source: Carefree, Arizona Code of Ordinances, Chapter 10, Article 10-1 (Comprehensive Building Safety Code), Section 10-1-1 Adoption, via American Legal Publishing code library (codelibrary.amlegal.com/codes/carefree).; 2018 International Building Code (IBC) and amendments, published by the International Code Council, adopted by reference (Carefree Town Code § 10-1-1(A)), with Town of Carefree amendments effective January 24, 2023 (§ 10-1-2(A)). Source: Carefree Town Code, Chapter 10, Article 10-1; Town of Carefree 'Effective Building Codes' summary sheet.; 2018 International Residential Code (IRC) and amendments, adopted by reference (§ 10-1-1(B)), with Town amendments effective January 24, 2023 (§ 10-1-2(B)), including adoption of Appendices F, H, M, and P (IRC § R102.5.1 amendment). Source: Carefree Town Code, Chapter 10, Article 10-1.; 2018 International Plumbing Code (IPC) and amendments, adopted by reference (§ 10-1-1(C)), with State amendments and additional Town amendments effective January 24, 2023 (§ 10-1-2(C)), including adoption of Appendix C. Plumbing permit fees are set per Carefree Town Code Chapter 10, Section 10-1-2 (IPC § 106.6.2 amendment), not the IPC's own fee table. Source: Carefree Town Code, Chapter 10, Article 10-1.; 2017 National Electrical Code (NEC) and amendments, adopted by reference in total (§ 10-1-1(D) / § 10-1-2(D)), effective January 24, 2023 (one edition behind the 2018 ICC code set). Source: Carefree Town Code, Chapter 10, Article 10-1.; 2018 International Mechanical Code (IMC) and amendments, adopted by reference (§ 10-1-1(E)), with Town amendments effective January 24, 2023 (§ 10-1-2(E)). Mechanical permit fees are explicitly cross-referenced to 'Chapter One of the International Building Code as adopted by the Town of Carefree' (IMC § 106.5.2 amendment) — i.e., the same Table 1-A valuation fee schedule as building permits. Source: Carefree Town Code, Chapter 10, Article 10-1.; 2018 International Fire Code (IFC) and amendments, adopted by reference (§ 10-1-1(F)), effective January 24, 2023; the Town of Carefree has assumed fire-code jurisdiction from the State Fire Safety Committee under A.R.S. §34-461 and §41-2163(A)(2), administered through the Rural/Metro Fire Department. Source: Carefree Town Code, Chapter 10, Article 10-1, Section 10-1-1.1/10-1-1.2 (IFC amendments).; 2018 International Energy Conservation Code (IECC) and amendments, adopted by reference (§ 10-1-1 / § 10-1-2(G)), effective January 24, 2023. Source: Carefree Town Code, Chapter 10, Article 10-1.; 2018 International Fuel Gas Code (IFGC) and amendments, adopted by reference (§ 10-1-2(H)), effective January 24, 2023; fees cross-referenced to Chapter One of the IBC as adopted by the Town (same Table 1-A schedule). Source: Carefree Town Code, Chapter 10, Article 10-1.; 2018 International Property Maintenance Code (IPMC) and amendments, adopted by reference (§ 10-1-1(K) / § 10-1-2(K)), effective January 24, 2023. Source: Carefree Town Code, Chapter 10, Article 10-1.; 2018 International Swimming Pool and Spa Code (ISPSC), published by the International Code Council, adopted by reference as a code within the meaning of A.R.S. § 9-801. Source: Town of Carefree 'Effective Building Codes' summary sheet (current as of live 2026 Town website).; 'Uniform Abatement of Dangerous Buildings,' 1994 Edition, published by the International Conference of Building Officials, and amendments, adopted by reference as a code within the meaning of A.R.S. § 9-801. Source: Town of Carefree 'Effective Building Codes' summary sheet.; 'The Town of Carefree Adobe Code,' dated April 1985, and amendments, plus the 'Conducting Blasting Operations Code,' dated November 1998, and amendments — both declared public records of the Town of Carefree. Source: Carefree Town Code, Chapter 10, Article 10-1, Section 10-1-1.; Manufactured/mobile homes and factory-built buildings fall under separate State of Arizona regulation (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for construction/installation standards; the Town's own permit process governs site placement, foundation, and zoning compliance. This inference follows the standard Arizona home-rule pattern documented across other Arizona municipalities' code-adoption ordinances and was not separately re-verified on a dedicated Carefree page — flagged as the one item in this record inferred from the statewide pattern rather than a page found specifically on carefree.org.. Local amendments apply — see the Carefree overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Carefree building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.