Carefree building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Carefree, Arizona.

Verified 2026-07-13 · Source

How to schedule

Inspections are requested through the building department below.

Address
8 Sundial Circle, P.O. Box 740, Carefree, AZ 85377
Phone
480-488-3686
Office hours
Town Hall main line 480-488-3686 (fax 480-488-3845); building permits are submitted in person at Town Hall (application form completed at the counter) or by mail to 8 Sundial Circle / P.O. Box 740, Carefree, AZ 85377. The current Building Official is Robert McCoy (buildingofficial@carefree.org), per the Town's live Building Department webpage.

Published scheduling rules

  • For brick-and-mortar businesses, a Building Safety Inspection must be requested and paid for through the Permit & License Portal after the business license application is submitted; the COO is issued jointly with the business license once the inspection passes (Certificate of Occupancy (Change of Use / New Tenant Occupancy))

Inspection sequence

Applies to: Residential Building Permit (New Single-Family Construction)

  1. 1

    Pre-Construction

    Site/erosion-control verification before grading or foundation work begins

  2. 2

    Foundation/Footing

    Before concrete pour; footings must bear on undisturbed natural soil or engineered fill

  3. 3

    Framing

    Structural framing, holddowns, and connections per approved plans and IRC amendments

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans, including fire sprinkler system final; Certificate of Occupancy issued ($25 fee for R-3 single-family)

Applies to: Commercial Tenant Improvement Permit

  1. 1

    Grading (if exterior modifications proposed)

    Per the Town's 'Building – Tenant Improvement Submittal' flowchart, a Grading Permit from Site Development must be obtained prior to Building Permit issuance if exterior modifications are proposed

  2. 2

    Final Walk-Through

    Construction complete, all punch-list items addressed, as-built drawings approved; results in either a Certificate of Occupancy (no exterior modifications) or a Final Letter of Acceptance beginning a 1-year warranty period (exterior modifications completed)

  3. 3

    Warranty Walk-Through

    For TI projects with completed exterior modifications: conducted after the 1-year warranty period, with all punch-list items addressed before bond release and a Warranty Release Letter is issued

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts, and 12-inch minimum sewer depth

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures, water heater, and gas connections verified, no leaks

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions

  2. 2

    Framing

    Structural connections to the existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Demolition Permit

  1. 1

    Pre-Construction

    Verifies dust-control measures and site readiness before demolition work begins

  2. 2

    Final

    Verifies completed demolition and site condition after work is completed

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring and panel connections before walls are closed

  2. 2

    Final

    Devices installed and connections verified per 2017 NEC as adopted by the Town

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    New circuit wiring and panel connections before walls are closed, if applicable

  2. 2

    Final

    Charger unit installed and connections verified per 2017 NEC as adopted by the Town

Applies to: Fence, Wall, and Pool Barrier Permit

  1. 1

    Footing

    Required for retaining walls before backfill

  2. 2

    Final

    Completed fence/wall/barrier verified against approved plans and height/setback requirements

Applies to: Fire Sprinkler & Fire Alarm Permit

  1. 1

    Rough-In / Underground

    Sprinkler piping, standpipes, or alarm wiring verified before concealment, consistent with Rural Metro Fire's approved plans

  2. 2

    Final / Fire Sprinkler & Alarm Acceptance

    System tested and verified operational per the approved plans; required before a Certificate of Occupancy is issued for new construction with a mandatory sprinkler system

Applies to: Grading Permit

  1. 1

    Pre-Construction / Erosion Control

    Verifies the 6-foot chain-link construction fence is installed at the disturbed-area boundary before excavation begins

  2. 2

    Final Grading

    Verifies as-built grading and drainage match the approved plan, with finished floor elevation confirmed above the 100-year storm elevation

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Solar Collector / Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before energizing

  2. 2

    Final

    Panel/array mounting, roof penetration sealing, and electrical connections verified

Re-inspection fees

Electrical PermitRe-inspection Fee · Carefree Town Code, Chapter 10, Section 10-1-2(A), Item 2 (applies to building, structural, electrical, mechanical, and plumbing)
$100.00 per hour
Plumbing PermitRe-inspection Fee · Carefree Town Code, Chapter 10, Section 10-1-2(A), Item 2
$100.00 per hour
Mechanical / HVAC PermitRe-inspection Fee · Carefree Town Code, Chapter 10, Section 10-1-2(A), Item 2
$100.00 per hour
EV Charger / EVSE PermitRe-inspection Fee · Carefree Town Code, Chapter 10, Section 10-1-2(A), Item 2 (applies to building, structural, electrical, mechanical, and plumbing generally)
$100.00 per hour
Commercial Building PermitRe-inspection Fee · Carefree Town Code, Chapter 10, Section 10-1-2(A), Item 2 (applies to building, structural, electrical, mechanical, and plumbing)
$100.00 per hour

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Carefree building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Carefree building permits

Get alerts for Carefree

We'll email you when Carefree's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.