Grading Permit in Carefree, Arizona
Required for excavation, land clearing, filling/dumping, or any disturbance of natural terrain or vegetation in Carefree. No grading may occur on a lot before the building permit for the underlying project has been issued (with a narrow exception for county-required percolation/test borings).
Verified 2026-07-06 · Source
When you need this permit
- Permit required for excavation, land clearing, filling and dumping, or any disturbance of natural terrain and vegetation, per Carefree Zoning Ordinance Sections 6.01 and 9.10
- No grading on any lot or parcel (other than percolation and test borings required by the county health department) before a building permit has been issued
- The Zoning Ordinance sets limits on the amount of land that can be disturbed on each site
- 2 sets of 24x36 grading & drainage plans, a drainage report, and a geotechnical report are required as part of the associated building permit submittal
- Grading and drainage plans must be stamped by a civil engineer; lowest finished floor elevation must be a minimum of 1.0 feet above the 100-year storm water surface elevation
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Pre-Construction / Erosion Control
Verifies the 6-foot chain-link construction fence is installed at the disturbed-area boundary before excavation begins
- 2
Final Grading
Verifies as-built grading and drainage match the approved plan, with finished floor elevation confirmed above the 100-year storm elevation
See the full Carefree inspection guide — scheduling & re-inspection fees →
Tips
- Grading cannot be performed before the building permit for the underlying project is issued — the grading plan is reviewed as part of that same building permit submittal, not as a freestanding fast-track permit.
- A 6-foot chain-link construction fence is required around the disturbed-area boundary prior to excavation.
- As of July 2026, the Town of Carefree does not appear to publish a grading-specific review timeline separate from the general building-permit review timeline (3-4 weeks first review, 2-3 weeks second review per the Summary of Building Permit Process) — that general range is used here.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Carefree building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Carefree
Grading Permit in other cities
Compare grading permit fees across Arizona →
Look up this fee in a different city →