Grading Permit — Paradise Valley, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.paradisevalleyaz.gov/DocumentCenter/View/10/Building-Permit-Application-Information
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Grading Permit in Paradise Valley, Arizona
Required for earthwork with gradient or drainage changes in Paradise Valley, administered by the Engineering Department. Fees are based on cubic yards of earth moved, with an additional Haul Permit for large-volume dirt import/export.
Verified 2026-07-06 · Source
When you need this permit
- Grading permit required for earthwork involving gradient or drainage changes on a property
- Legal survey and Grading and Drainage Plan, both prepared by an Arizona Registered Civil Engineer, required
- SWPPP and Dust Control Plan required; ADEQ Notice of Intent required if disturbance exceeds one acre
- A late permit fee (double the standard permit fee) applies for any grading work performed without first obtaining a grading permit
- A separate Haul Permit applies when more than 100 cubic yards of dirt are brought onto or removed from the property
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Grading
Cut/fill slopes and drainage pattern verified against approved Grading and Drainage Plan
- 2
Final
Finished grading and drainage compliance verified
See the full Paradise Valley inspection guide — scheduling & re-inspection fees →
Tips
- The Grading Permit Fee and Excavation Haul Fee figures cited here ($168/$96 per 100 cy and $150/$96 per 100 cy) are confirmed current via the Town's live Building Permit Application Information handout — these are more reliable than the flat trade-permit fees ($130 electrical/plumbing/mechanical) which trace only to the 2021 archived schedule.
- Performing grading work (removing or placing fill dirt) without first obtaining a grading permit triggers a late permit fee equal to double the standard permit fee — get the permit before earthwork begins, not after.
- Grading and Haul fees are separate: the Haul fee only applies on top of the Grading fee when the project also involves more than 100 cubic yards of dirt being brought onto or removed from the property.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Paradise Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Paradise Valley
Grading Permit in other cities
Compare grading permit fees across Arizona →
Look up this fee in a different city →