Residential Solar Photovoltaic (PV) Permit — Paradise Valley, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.paradisevalleyaz.gov/24/Permits-and-Handouts
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Solar Photovoltaic (PV) Permit in Paradise Valley, Arizona
Required for installation of rooftop residential solar photovoltaic systems in Paradise Valley. Reviewed in-house per the standard Building Safety Department plan-review process; a Hillside Building Committee application also exists for solar/solar-hot-water additions on Hillside lots.
Verified 2026-07-06 · Source
When you need this permit
- Building/electrical permit required for solar PV system installation
- Design Sheets (equipment cut sheets, racking/attachment details) and Site Plan required at submittal
- Governed by the 2014 NEC as adopted by the Town of Paradise Valley for the electrical interconnection scope
- On a Hillside Development Area lot, a separate Hillside Building Committee application and fee applies specifically for review of a solar photovoltaic or solar hot water heater addition
- Apply via the Accela Citizen Access online portal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Town of Paradise Valley Master Fee Schedule §2.3.2.b, as it reads in the archived 03/01/2022 capture of the Res. Show full citationHide
Town of Paradise Valley Master Fee Schedule §2.3.2.b, as it reads in the archived 03/01/2022 capture of the Res. 2021-01 revision. The schedule was amended in 2023, so confirm the current figure with the Town before budgeting (see the electrical-permit entry). Applies only when the property is within a Hillside Development AreaReview timeline
Inspection process
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before energizing
- 2
Final
Panel mounting, racking attachment, roof-penetration sealing, and interconnection point verified
See the full Paradise Valley inspection guide — scheduling & re-inspection fees →
Tips
- Unlike Buckeye's dedicated 2-business-day streamlined review track for small residential PV systems, Paradise Valley's published materials show no separate expedited solar review process — solar permits go through the Town's standard 15-business-day plan review cycle described in the Building Permit Application Information handout.
- Solar or solar-hot-water additions specifically on a Hillside Development Area lot trigger a distinct $1,785 Hillside Building Committee review fee (per the archived 2021 Master Fee Schedule) in addition to the standard building/electrical permit fee — confirm Hillside status with the Hillside Planner (480-348-3519) before applying.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Checklists & handouts
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Paradise Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Paradise Valley's permit history is searchable by address
11,002 permits on record for Paradise Valley, 2016–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Paradise Valley
Residential Solar Photovoltaic (PV) Permit in other cities
Compare residential solar photovoltaic (pv) permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Paradise Valley project checklist
Describe your project once and get every permit, document, and fee it triggers in Paradise Valley — in one checklist. Free, for any city and any number of projects.
Get started →