Residential Solar Photovoltaic (PV) Permit in Paradise Valley, Arizona

Required for installation of rooftop residential solar photovoltaic systems in Paradise Valley. Reviewed in-house per the standard Building Safety Department plan-review process; a Hillside Building Committee application also exists for solar/solar-hot-water additions on Hillside lots.

Verified 2026-07-06 · Source

When you need this permit

  • Building/electrical permit required for solar PV system installation
  • Design Sheets (equipment cut sheets, racking/attachment details) and Site Plan required at submittal
  • Governed by the 2014 NEC as adopted by the Town of Paradise Valley for the electrical interconnection scope
  • On a Hillside Development Area lot, a separate Hillside Building Committee application and fee applies specifically for review of a solar photovoltaic or solar hot water heater addition
  • Apply via the Accela Citizen Access online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building/Electrical Permit Fee — Based on ValuationTown of Paradise Valley Building Permit Application Information handout, 'Fee Structure' — no separate flat solar-specific line item was found on the Town's current fee handout; solar is billed under the general valuation-based fee structure
Standard valuation-based Building Permit Fee table (§1.1.1.1) applied to system cost
Hillside Review of Solar PV or Solar Hot Water Heater Addition (Hillside lots only)Town of Paradise Valley Master Fee Schedule §2.3.2.b (archived 03/01/2022 capture, Res. 2021-01 revision — see electrical-permit entry for why the 2023-amended figure could not be independently re-verified); applies only when the property is within a Hillside Development Area
$1,785
Plan Review (in-house, up to two reviews)Town of Paradise Valley Building Permit Application Information handout
65% of the Building Permit Fee

Review timeline

Plan reviewParadise Valley’s published plan-review target
15–20 business days

How long did your Residential Solar Photovoltaic (PV) Permit permit actually take in Paradise Valley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof-penetration sealing, and interconnection point verified

See the full Paradise Valley inspection guide — scheduling & re-inspection fees →

Tips

  • Unlike Buckeye's dedicated 2-business-day streamlined review track for small residential PV systems, Paradise Valley's published materials show no separate expedited solar review process — solar permits go through the Town's standard 15-business-day plan review cycle described in the Building Permit Application Information handout.
  • Solar or solar-hot-water additions specifically on a Hillside Development Area lot trigger a distinct $1,785 Hillside Building Committee review fee (per the archived 2021 Master Fee Schedule) in addition to the standard building/electrical permit fee — confirm Hillside status with the Hillside Planner (480-348-3519) before applying.

Frequently asked questions

Paradise Valley requires a residential solar photovoltaic (pv) permit for: Building/electrical permit required for solar PV system installation; Design Sheets (equipment cut sheets, racking/attachment details) and Site Plan required at submittal; Governed by the 2014 NEC as adopted by the Town of Paradise Valley for the electrical interconnection scope; On a Hillside Development Area lot, a separate Hillside Building Committee application and fee applies specifically for review of a solar photovoltaic or solar hot water heater addition; Apply via the Accela Citizen Access online portal. If your project isn't listed, confirm with Town of Paradise Valley Building Safety Department (Community Development Department) at 480-348-3692 before starting work.

In Paradise Valley, the published Building/Electrical Permit Fee — Based on Valuation is: Standard valuation-based Building Permit Fee table (§1.1.1.1) applied to system cost. Additional published fees: Hillside Review of Solar PV or Solar Hot Water Heater Addition (Hillside lots only) — $1,785; Plan Review (in-house, up to two reviews) — 65% of the Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Paradise Valley's published plan-review target for a residential solar photovoltaic (pv) permit is 15–20 business days.

You'll need: Solar Permit Application; Site Plan; Design Sheets. See the required-documents checklist on this page for details on each.

Paradise Valley requires 2 inspection(s) for a residential solar photovoltaic (pv) permit, in order: Rough Electrical, Final. Schedule each through Town of Paradise Valley Building Safety Department (Community Development Department) (480-348-3692).

Apply through Town of Paradise Valley Building Safety Department (Community Development Department) at 6401 E. Lincoln Drive, Paradise Valley, AZ 85253-4399. Phone: 480-348-3692, email: PVPermits@paradisevalleyaz.gov. Office hours: Monday - Friday, 7 a.m. - Noon and 1 p.m. - 4 p.m.; closed for lunch 12:00 p.m. - 1:00 p.m. The Town does not accept application submittals, payments, nor release permits after 3:30 p.m. Applications for Building, Banner, Demolition, Electrical, Fence/Site Walls, Mechanical, Plumbing, Pool/Spa, and Short-Term Rental permits are submitted via the Accela Citizen Access online portal (aca-prod.accela.com/PARADISEVLY). Building inspections are scheduled via a 24/7 interactive phone system at 480-348-3581 or the Accela portal; winter (Oct-Apr) inspection hours are 7 a.m.-3 p.m., summer (May-Sept) 6 a.m.-3 p.m., and requests received before 3 p.m. are performed the next business day.. Official information: https://www.paradisevalleyaz.gov/185/Building.

Paradise Valley, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Paradise Valley operates its own Building Safety Department / Community Development Department and independently adopts and administers its own construction codes. Source: Town of Paradise Valley Building page (paradisevalleyaz.gov/185/Building) and the Town's 'International Codes adopted by Town of Paradise Valley' handout (Community Development Department, updated July 2023).; 2015 International Residential Code (IRC), adopted by the Town of Paradise Valley, with local design-criteria and administrative amendments. Source: 'International Codes adopted by Town of Paradise Valley' (Community Development Department, updated July 2023).; 2015 International Building Code (IBC), adopted by the Town of Paradise Valley, with local amendments. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Mechanical Code (IMC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Plumbing Code (IPC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Fuel Gas Code (IFGC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2021 International Fire Code (IFC), adopted by the Town of Paradise Valley as its uniform fire code — the only 2021-cycle ICC code adopted by the Town, one full code cycle newer than its 2015 building/residential/mechanical/plumbing/fuel-gas set; administered with the Town Fire Marshal (480-348-3631). Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Property Maintenance Code (IPMC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2014 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by the Town of Paradise Valley — one edition behind Buckeye's 2023 NEC and two behind the current 2023 NFPA cycle; this is the edition in force as of the Town's most recently updated codes-adopted handout (July 2023). Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Energy Conservation Code (IECC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; Air Conditioning Contractors of America (ACCA) Manual J (load calculation) and Manual S (equipment selection) compliance is mandatory for all new single-family home applications, using Town-specified outdoor design conditions (Winter Heating 99% DB = 35°F ± 2°F; Summer Cooling 1% DB = 107°F ± 2°F) and indoor design conditions (Heating 70°F at 30% RH; Cooling 75°F at 45% RH). Source: Town of Paradise Valley Building Permit Application Information handout (Building Safety Department).. Local amendments apply — see the Paradise Valley overview page for the full list.

No dedicated fast-track solar review process was found on the Town's published Permits and Handouts page or Building Permit Application Information handout — solar PV permits appear to go through the same in-house plan review cycle (up to 15 business days per review, plus 3-5 days to issue) as other building permits.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Paradise Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.