Skip to main content
PermitBase

Residential Solar Photovoltaic (PV) Permit in Apache Junction, Arizona

Required for installation of rooftop or ground-mount residential solar photovoltaic systems in Apache Junction, permitted as an electrical permit under the 2017 NEC as adopted by the City. Fee varies based on whether the system includes a storage battery.

Verified 2026-07-06 · Source

When you need this permit

  • Installation of an interconnected photovoltaic system or battery system always requires an electrical permit — this is explicitly called out as NOT exempt in the City's Work Exempt from Building Permits guidance, even though many other minor electrical work items are exempt
  • Governed by the 2017 NEC as adopted by the City of Apache Junction
  • Fee differs based on whether the system includes a storage battery
  • Modifications to an existing residential PV system are billed separately from new installation
  • Apply via the MyGovernmentOnline (MGO) online permit system

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Photovoltaic System, Residential, No Storage BatteryApache Junction City Code, Vol. I, Ch. 4, Art. 4-4, § 4-4-1, Electrical
$170 per dwelling unit
Photovoltaic System, Residential, with Storage BatteryApache Junction City Code, Vol. I, Ch. 4, Art. 4-4, § 4-4-1
$225 per dwelling unit
Photovoltaic System, Residential ModificationApache Junction City Code, Vol. I, Ch. 4, Art. 4-4, § 4-4-1
$55 per change
Mechanical, Electrical and Plumbing (stand-alone permit) Technology FeeApache Junction City Code, Vol. I, Ch. 4, Art. 4-4, § 4-4-1, Technology and GIS Fees
2% of permit fee

Review timeline

Plan reviewApache Junction’s published plan-review target
15–20 business days

How long did your Residential Solar Photovoltaic (PV) Permit permit actually take in Apache Junction?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified

See the full Apache Junction inspection guide — scheduling & re-inspection fees →

Tips

  • Systems with a storage battery cost $55 more than a no-battery system ($225 vs. $170) under the City's flat per-dwelling-unit fee schedule.
  • No dedicated fast-track/streamlined residential PV review procedure (comparable to some other Arizona cities' 2-business-day tracks) was found published by Apache Junction as of this review — PV/electrical permits requiring plan review follow the City's standard review timeline stated in the New Residential Construction (and Additions) Building Application Guide (3-4 weeks first review, 1-2 weeks subsequent), which the Building Safety and Inspection Division applies as its general plan-review SLA across permit types.
  • PV/battery installation is one of the few electrical scopes explicitly NOT covered by the City's minor-work permit exemptions (Article 7-1, § 7-1-6(B)(2)).

Frequently asked questions

Apache Junction requires a residential solar photovoltaic (pv) permit for: Installation of an interconnected photovoltaic system or battery system always requires an electrical permit — this is explicitly called out as NOT exempt in the City's Work Exempt from Building Permits guidance, even though many other minor electrical work items are exempt; Governed by the 2017 NEC as adopted by the City of Apache Junction; Fee differs based on whether the system includes a storage battery; Modifications to an existing residential PV system are billed separately from new installation; Apply via the MyGovernmentOnline (MGO) online permit system. If your project isn't listed, confirm with City of Apache Junction Development Services Department — Division of Building Safety and Inspection at 480-474-5156 before starting work.

$170 per dwelling unit for a system with no storage battery, or $225 per dwelling unit for a system that includes a storage battery, per Apache Junction City Code, Vol. I, Ch. 4, Art. 4-4, § 4-4-1 (Electrical).

No dedicated fast-track timeline specific to residential PV was found published by the City as of this review. PV permits requiring plan review are subject to the City's general Building Safety and Inspection Division review timeline of 3-4 weeks (15-20 business days) for first review and 1-2 weeks (5-10 business days) for subsequent reviews, as published in the New Residential Construction (and Additions) Building Application Guide (rev. 03/11/2024).

You'll need: Electrical Permit Application. See the required-documents checklist on this page for details on each.

Apache Junction requires 2 inspection(s) for a residential solar photovoltaic (pv) permit, in order: Rough Electrical, Final. Schedule each through City of Apache Junction Development Services Department — Division of Building Safety and Inspection (480-474-5156).

Apply through City of Apache Junction Development Services Department — Division of Building Safety and Inspection at 300 E. Superstition Blvd. (Building D), Apache Junction, AZ 85119. Phone: 480-474-5156, email: buildingpermits@apachejunctionaz.gov. Office hours: Building and Safety Manager/Building Official: Adrian Alegria (buildingpermits@apachejunctionaz.gov, 480-474-5156). All building permit applications must be submitted electronically through the MyGovernmentOnline (MGO) online permit system; a public kiosk with an 11x17 flat scanner is available in the Development Services Lobby at the city complex, 300 E. Superstition Blvd. Building D, for applicants who need accommodation. Division main line 480-982-8002; inspections may be scheduled by phone at 480-474-5101 or via the MGO customer portal. Source: City of Apache Junction Division of Building Safety and Inspection staff directory page; New Residential Construction (and Additions) Building Application Guide (rev. 03/11/2024).. Official information: https://www.apachejunctionaz.gov/622/Permits.

Apache Junction, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Apache Junction independently adopts and administers its own construction codes through its Development Services Department / Division of Building Safety and Inspection. Source: City of Apache Junction Division of Building Safety and Inspection (apachejunctionaz.gov/85/Building-Safety-and-Inspection); Apache Junction City Code, Volume I, Chapter 7 (Buildings).; 2018 International Building Code (IBC), formally adopted by the Apache Junction City Council on June 18, 2019, effective July 18, 2019, with City of Apache Junction amendments (Apache Junction City Code, Volume I, Article 7-2: Building Code, § 7-2-2 Amendments to the 2018 International Building Code). Source: City of Apache Junction 'Currently Adopted Building Codes' notice (Division of Building Safety and Inspection, 300 E. Superstition Blvd.).; 2018 International Residential Code (IRC), adopted June 18, 2019, effective July 18, 2019, with City of Apache Junction amendments (Article 7-4: Residential Code), including a City-completed Table R301.2(1) Climatic and Geographic Design Criteria and amendments to R301.5 (Live Loads), R302.1(1), R302.2.6, and R303 (mandatory heating/cooling). Confirmed as the applicable code on the City's own 'New Residential Construction (and Additions) Building Application Guide' coversheet requirement ('Applicable code 2018 IRC'). Source: City of Apache Junction 'Currently Adopted Residential Code & Design Criteria' notice; New Residential Construction (and Additions) Building Application Guide (rev. 03/11/2024), p.2.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted June 18, 2019, effective July 18, 2019 — one edition behind the 2018 ICC set (the City has not since adopted the 2020 or 2023 NEC per the City's own currently-adopted-codes notice and FAQ page). Source: City of Apache Junction 'Currently Adopted Building Codes' notice; City of Apache Junction Building Division FAQ (apachejunctionaz.gov/faq.aspx?TID=20).; 2018 International Plumbing Code (IPC), adopted June 18, 2019, effective July 18, 2019, with City of Apache Junction amendments (Article 7-6: Plumbing Code, § 7-6-2 Amendments to the 2018 International Plumbing Code). Source: City of Apache Junction 'Currently Adopted Building Codes' notice.; 2018 International Mechanical Code (IMC), adopted June 18, 2019, effective July 18, 2019. Source: City of Apache Junction 'Currently Adopted Building Codes' notice.; 2018 International Fuel Gas Code (IFGC), adopted June 18, 2019, effective July 18, 2019. Source: City of Apache Junction 'Currently Adopted Building Codes' notice.; 2018 International Existing Building Code (IEBC), adopted June 18, 2019, effective July 18, 2019. Source: City of Apache Junction 'Currently Adopted Building Codes' notice.; 2018 International Energy Conservation Code (IECC), adopted June 18, 2019, effective July 18, 2019, governs energy-efficiency requirements for new residential and commercial construction (Manual J/D/S calculations required per the City's Residential Building Application Guide). Source: City of Apache Junction 'Currently Adopted Building Codes' notice; New Residential Construction (and Additions) Building Application Guide (rev. 03/11/2024).; 2018 International Swimming Pool and Spa Code (ISPSC), adopted June 18, 2019, effective July 18, 2019, governs residential and public/semi-public pool and spa construction. Source: City of Apache Junction 'Currently Adopted Building Codes' notice.; 2018 International Fire Code (IFC), adopted as the City's uniform fire code (Article 7-1 references the 'Technical Codes' collectively); administered in coordination with the Building Safety and Inspection Division. Source: Apache Junction City Code, Volume I, Article 7-1: Division of Building Safety and Inspection Administrative Code.; Accessibility: 2010 ADA Standards for Accessible Design, as published by the U.S. Department of Justice, Civil Rights Division (appendices B and D to 36 CFR 1191 (2009) and 28 CFR part 35.151 (2011) for public entities; 28 CFR 36.401-36.406 (2011) for places of public accommodation and commercial facilities), adopted June 18, 2019, effective July 18, 2019. Source: City of Apache Junction 'Currently Adopted Building Codes' notice.; Fee schedules were revised in conjunction with the 2018/2019 code adoption, effective July 1, 2019, and the Development Services Fees (Apache Junction City Code, Volume I, Chapter 4, Article 4-4) were most recently revised October 31, 2022. The ICC codes' own fee/valuation sections are superseded for practical billing purposes by Article 4-4, which is the City's operative fee authority (though commercial valuation itself is still calculated per the ICC Building Valuation Data table). Source: City of Apache Junction 'Currently Adopted Building Codes' notice; Apache Junction City Code, Vol. I, Chapter 4, Article 4-4: Development Services Fees (rev. 10/31/22).. Local amendments apply — see the Apache Junction overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Apache Junction building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.