Apache Junction building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Apache Junction, Arizona.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 300 E. Superstition Blvd. (Building D), Apache Junction, AZ 85119
- Phone
- 480-474-5156
- Office hours
- Building and Safety Manager/Building Official: Adrian Alegria (buildingpermits@apachejunctionaz.gov, 480-474-5156). All building permit applications must be submitted electronically through the MyGovernmentOnline (MGO) online permit system; a public kiosk with an 11x17 flat scanner is available in the Development Services Lobby at the city complex, 300 E. Superstition Blvd. Building D, for applicants who need accommodation. Division main line 480-982-8002; inspections may be scheduled by phone at 480-474-5101 or via the MGO customer portal. Source: City of Apache Junction Division of Building Safety and Inspection staff directory page; New Residential Construction (and Additions) Building Application Guide (rev. 03/11/2024).
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing, braced wall connections, hold-downs and anchor bolts per 2018 IRC and City of Apache Junction design criteria
- 3
Mechanical/Electrical/Plumbing Rough-In
HVAC, electrical, and plumbing rough-in per approved plans
- 4
Final
All work complete per approved plans; required for Certificate of Completion
Applies to: Manufactured Home / Park Model Set Permit
- 1
Set/Blocking Inspection
Verifies proper support, tie-down, and foundation per State of Arizona Department of Housing and City standards
- 2
Utility Connection Inspection
Electrical, plumbing, and gas connections to the unit
- 3
Final
Completed installation verified against approved plans; up to 3 inspections included in the base Set fee
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, water heater and gas connections verified, no leaks
Applies to: Residential Addition / Remodel / Accessory Structure Permit
- 1
Foundation/Footing
Required before concrete pour for additions and accessory structures
- 2
Framing
Structural connections to existing structure
- 3
Final
Completed work verified against approved plans
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final
Devices installed, panel labeled, protections verified per 2017 NEC
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
Wiring and box placement before walls are closed
- 2
Final
Charger installed, circuit verified, unit energized
Applies to: Fence and Retaining Wall Permit
- 1
Footing
Required for engineered retaining walls before backfill
- 2
Final
Completed fence/wall verified against approved plans
Applies to: Fire Sprinkler and Fire Alarm System Permit
- 1
Rough-In / Underground
Sprinkler piping, alarm wiring, and device placement verified before concealment, per SFMD Fire Prevention Bureau
- 2
Final Acceptance Test
Hydrostatic/flow acceptance test (fire sprinkler systems) or full functional test (fire alarm systems) witnessed by SFMD before the system is placed in service
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances and combustion air verified
Applies to: Residential Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final
Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified
Applies to: Sign Permit
- 1
Rough-In (Electrical, if applicable)
Wiring and connections verified before the sign face/cabinet is closed, for illuminated signs only
- 2
Final
Sign construction, location, height, and (if applicable) electrical connections verified against the approved AUP and building permit
Final inspection only: Change of Use / Change of Occupancy Permit, Demolition Permit, Re-Roofing Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Apache Junction building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Apache Junction building permits
Get alerts for Apache Junction
We'll email you when Apache Junction's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.