EV Charger / EVSE Permit in Apache Junction, Arizona
Required for installation of a residential electric vehicle charging circuit in Apache Junction, governed by the 2017 National Electrical Code (NEC). The City's electrical fee table (City Code Vol. I, Ch. 4, Art. 4-4, § 4-4-1) has no EV-charger/EVSE-specific line item — an EV charger circuit added to an existing dwelling is billed under the 'Electrical Repair/Branch Circuit or Lighting Additions, Residential' category, and a new/upgraded service for the charger would instead fall under the service-upgrade fee tiers.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for the new EV charger branch circuit
- Governed by the 2017 NEC as adopted by the City of Apache Junction
- Apply via the MyGovernmentOnline (MGO) online permit system
- If the install also requires a new or upgraded electrical service, the applicable service-upgrade fee tier applies in addition to (or instead of) the branch-circuit fee
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Wiring and box placement before walls are closed
- 2
Final
Charger installed, circuit verified, unit energized
See the full Apache Junction inspection guide — scheduling & re-inspection fees →
Tips
- Apache Junction has no distinct EV charger/EVSE fee — a standalone EV charger branch circuit is billed under 'Electrical Repair/Branch Circuit or Lighting Additions, Residential' at $120 per dwelling unit, the same category used for other branch-circuit additions.
- If the EV charger requires a new or upgraded electrical service, the service-upgrade fee tiers ($200 flat up to 200 amps, or $1.00/amp with a $220 minimum above 200 amps) apply instead of or in addition to the branch-circuit fee.
- Simple, like-for-like scopes may be processed over-the-counter; scopes requiring plan review (larger service upgrades) follow the standard 15-20 business day first-review timeline.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Apache Junction building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Apache Junction
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Apache Junction project checklist
Describe your project once and get every permit, document, and fee it triggers in Apache Junction — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →