Paradise Valley building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Paradise Valley, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
6401 E. Lincoln Drive, Paradise Valley, AZ 85253-4399
Phone
480-348-3692
Office hours
Monday - Friday, 7 a.m. - Noon and 1 p.m. - 4 p.m.; closed for lunch 12:00 p.m. - 1:00 p.m. The Town does not accept application submittals, payments, nor release permits after 3:30 p.m. Applications for Building, Banner, Demolition, Electrical, Fence/Site Walls, Mechanical, Plumbing, Pool/Spa, and Short-Term Rental permits are submitted via the Accela Citizen Access online portal (aca-prod.accela.com/PARADISEVLY). Building inspections are scheduled via a 24/7 interactive phone system at 480-348-3581 or the Accela portal; winter (Oct-Apr) inspection hours are 7 a.m.-3 p.m., summer (May-Sept) 6 a.m.-3 p.m., and requests received before 3 p.m. are performed the next business day.

Inspection sequence

Applies to: Residential Building Permit (New Construction / Custom Home)

  1. 1

    Property Pin/Line Verification

    All property pins and lines must be identified prior to the first footing inspection of any type

  2. 2

    Foundation/Footing

    Before concrete pour; verifies rebar per submitted foundation plan

  3. 3

    Framing

    Structural framing, roof framing, and wall-to-foundation/roof-to-wall anchoring per approved plans

  4. 4

    Final

    All work complete per approved plans; required on every permit before closeout

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verifies pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Pool / Spa Permit

  1. 1

    Pre-Gunite/Shell

    Steel and plumbing verified before shotcrete/gunite application

  2. 2

    Pre-Plaster

    Deck, equipment, and bonding verified before final interior finish

  3. 3

    Barrier/Final

    Barrier height, gate self-closing/self-latching function, and entrapment protection verified per the Town's Barrier Requirements handout before final approval

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions

  2. 2

    Framing

    Structural connections to the existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Demolition Permit

  1. 1

    Pre-Demolition (Right-of-Way/Utility)

    Right-of-way condition and utility termination verified before work begins

  2. 2

    Final

    Required on every demolition permit; confirms complete removal and site condition

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed and protections verified per 2014 NEC

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    Circuit wiring, box placement, and panel connection before walls are closed

  2. 2

    Final

    EVSE installed, devices verified per 2014 NEC

Applies to: Fence / Site Wall Permit

  1. 1

    Footing

    Before concrete pour for masonry walls, verifying rebar/foundation per submitted details

  2. 2

    Final

    Completed wall/fence height, setback, and finish verified against approved plans and Zoning Ordinance Table 2404A

Applies to: Grading Permit

  1. 1

    Rough Grading

    Cut/fill slopes and drainage pattern verified against approved Grading and Drainage Plan

  2. 2

    Final

    Finished grading and drainage compliance verified

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, and disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof-penetration sealing, and interconnection point verified

Paradise Valley building permits

Get alerts for Paradise Valley

We'll email you when Paradise Valley's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.