EV Charger / EVSE Permit — Paradise Valley, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://www.paradisevalleyaz.gov/24/Permits-and-Handouts
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Paradise Valley, Arizona
The Town of Paradise Valley does not publish a dedicated EV charger/EVSE permit. Installation of a dedicated 240-volt EV charging circuit is permitted as hard-wired electrical work under the Town's standard Electrical Permit, governed by the 2014 NEC as adopted by the Town, and is pulled by the licensed electrical contractor performing the work. There is no EV-specific line item in the Town's Master Fee Schedule; the flat Electrical Permit Fee applies.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for a dedicated EV charging circuit, as with any hard-wired electrical work
- Governed by the 2014 NEC as adopted by the Town of Paradise Valley
- Only a licensed Arizona electrical contractor may pull the permit and perform the installation
- Load calculations may be required to confirm panel capacity supports the added EVSE circuit
- Apply via the Accela Citizen Access online portal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Circuit wiring, box placement, and panel connection before walls are closed
- 2
Final
EVSE installed, devices verified per 2014 NEC
See the full Paradise Valley inspection guide — scheduling & re-inspection fees →
Tips
- Paradise Valley has no dedicated EV charger permit — a licensed electrical contractor pulls the standard Electrical Permit for the dedicated circuit.
- Confirm the current Electrical Permit fee with the Building Safety Department (480-348-3692) — the Town's 2021 fee schedule listed $130 flat, and a 2023 amendment exists whose updated figures could not be independently verified in this review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Paradise Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Paradise Valley
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →