Skip to main content
PermitBase

EV Charger / EVSE Permit in Paradise Valley, Arizona

The Town of Paradise Valley does not publish a dedicated EV charger/EVSE permit. Installation of a dedicated 240-volt EV charging circuit is permitted as hard-wired electrical work under the Town's standard Electrical Permit, governed by the 2014 NEC as adopted by the Town, and is pulled by the licensed electrical contractor performing the work. There is no EV-specific line item in the Town's Master Fee Schedule; the flat Electrical Permit Fee applies.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for a dedicated EV charging circuit, as with any hard-wired electrical work
  • Governed by the 2014 NEC as adopted by the Town of Paradise Valley
  • Only a licensed Arizona electrical contractor may pull the permit and perform the installation
  • Load calculations may be required to confirm panel capacity supports the added EVSE circuit
  • Apply via the Accela Citizen Access online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit Fee (flat)Town of Paradise Valley Master Fee Schedule, §1.1.4 (archived 03/01/2022 capture, Res. 2021-01 revision); a 2023 fee schedule amendment (Res. 2023-06, effective 10/14/2023) exists but its dollar figures could not be independently re-extracted in this review — confirm the current amount with the Building Safety Department. No EV-specific line item exists.
$130.00
Plan Review (in-house, if plan review is required)Town of Paradise Valley Building Permit Application Information handout, 'Plan Review Process' — applies when a load calculation submittal requires review rather than counter issuance
65% of the applicable permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Paradise Valley building department
~15–20 business days

How long did your EV Charger / EVSE Permit permit actually take in Paradise Valley?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Circuit wiring, box placement, and panel connection before walls are closed

  2. 2

    Final

    EVSE installed, devices verified per 2014 NEC

See the full Paradise Valley inspection guide — scheduling & re-inspection fees →

Tips

  • Paradise Valley has no dedicated EV charger permit — a licensed electrical contractor pulls the standard Electrical Permit for the dedicated circuit.
  • Confirm the current Electrical Permit fee with the Building Safety Department (480-348-3692) — the Town's 2021 fee schedule listed $130 flat, and a 2023 amendment exists whose updated figures could not be independently verified in this review.

Frequently asked questions

Paradise Valley requires an ev charger / evse permit for: Electrical permit required for a dedicated EV charging circuit, as with any hard-wired electrical work; Governed by the 2014 NEC as adopted by the Town of Paradise Valley; Only a licensed Arizona electrical contractor may pull the permit and perform the installation; Load calculations may be required to confirm panel capacity supports the added EVSE circuit; Apply via the Accela Citizen Access online portal. If your project isn't listed, confirm with Town of Paradise Valley Building Safety Department (Community Development Department) at 480-348-3692 before starting work.

No. There is no dedicated EV charger permit type. A dedicated 240-volt EV charging circuit is permitted under the Town's standard Electrical Permit, most recently verified as a flat $130 fee (2021 Master Fee Schedule), with no EV-specific line item.

Plan review for an ev charger / evse permit in Paradise Valley typically runs 15–20 business days. This is an estimate, not a published figure — confirm current review times with Town of Paradise Valley Building Safety Department (Community Development Department) at 480-348-3692.

You'll need: Electrical Permit Application. Depending on your project, Paradise Valley may also ask for: Load Calculations. See the required-documents checklist on this page for details on each.

Paradise Valley requires 2 inspection(s) for an ev charger / evse permit, in order: Rough-In, Final. Schedule each through Town of Paradise Valley Building Safety Department (Community Development Department) (480-348-3692).

Apply through Town of Paradise Valley Building Safety Department (Community Development Department) at 6401 E. Lincoln Drive, Paradise Valley, AZ 85253-4399. Phone: 480-348-3692, email: PVPermits@paradisevalleyaz.gov. Office hours: Monday - Friday, 7 a.m. - Noon and 1 p.m. - 4 p.m.; closed for lunch 12:00 p.m. - 1:00 p.m. The Town does not accept application submittals, payments, nor release permits after 3:30 p.m. Applications for Building, Banner, Demolition, Electrical, Fence/Site Walls, Mechanical, Plumbing, Pool/Spa, and Short-Term Rental permits are submitted via the Accela Citizen Access online portal (aca-prod.accela.com/PARADISEVLY). Building inspections are scheduled via a 24/7 interactive phone system at 480-348-3581 or the Accela portal; winter (Oct-Apr) inspection hours are 7 a.m.-3 p.m., summer (May-Sept) 6 a.m.-3 p.m., and requests received before 3 p.m. are performed the next business day.. Official information: https://www.paradisevalleyaz.gov/185/Building.

Paradise Valley, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Paradise Valley operates its own Building Safety Department / Community Development Department and independently adopts and administers its own construction codes. Source: Town of Paradise Valley Building page (paradisevalleyaz.gov/185/Building) and the Town's 'International Codes adopted by Town of Paradise Valley' handout (Community Development Department, updated July 2023).; 2015 International Residential Code (IRC), adopted by the Town of Paradise Valley, with local design-criteria and administrative amendments. Source: 'International Codes adopted by Town of Paradise Valley' (Community Development Department, updated July 2023).; 2015 International Building Code (IBC), adopted by the Town of Paradise Valley, with local amendments. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Mechanical Code (IMC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Plumbing Code (IPC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Fuel Gas Code (IFGC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2021 International Fire Code (IFC), adopted by the Town of Paradise Valley as its uniform fire code — the only 2021-cycle ICC code adopted by the Town, one full code cycle newer than its 2015 building/residential/mechanical/plumbing/fuel-gas set; administered with the Town Fire Marshal (480-348-3631). Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Property Maintenance Code (IPMC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2014 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by the Town of Paradise Valley — one edition behind Buckeye's 2023 NEC and two behind the current 2023 NFPA cycle; this is the edition in force as of the Town's most recently updated codes-adopted handout (July 2023). Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; 2015 International Energy Conservation Code (IECC), adopted by the Town of Paradise Valley. Source: 'International Codes adopted by Town of Paradise Valley' (updated July 2023).; Air Conditioning Contractors of America (ACCA) Manual J (load calculation) and Manual S (equipment selection) compliance is mandatory for all new single-family home applications, using Town-specified outdoor design conditions (Winter Heating 99% DB = 35°F ± 2°F; Summer Cooling 1% DB = 107°F ± 2°F) and indoor design conditions (Heating 70°F at 30% RH; Cooling 75°F at 45% RH). Source: Town of Paradise Valley Building Permit Application Information handout (Building Safety Department).. Local amendments apply — see the Paradise Valley overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Paradise Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.