Mechanical / HVAC Permit in Paradise Valley, Arizona
Required for heating, ventilation, and air conditioning installations in Paradise Valley, governed by the 2015 IMC as adopted by the Town. New single-family homes must comply with ACCA Manual J/Manual S load calculations using Town-specified design conditions.
Verified 2026-07-06 · Source
When you need this permit
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment and ventilation systems
- Governed by the 2015 IMC as adopted by the Town of Paradise Valley
- New single-family home HVAC design must comply with ACCA Manual J (load calc) and Manual S (equipment selection), using Town-specified outdoor design conditions (99% DB heating 35°F ± 2°F; 1% DB cooling 107°F ± 2°F) and indoor design conditions (70°F/30% RH heating; 75°F/45% RH cooling)
- Site Plan required
- Apply via the Accela Citizen Access online portal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Town of Paradise Valley Master Fee Schedule, §1.1.3 (archived 03/01/2022 capture, Res. Show full citationHide
Town of Paradise Valley Master Fee Schedule, §1.1.3 (archived 03/01/2022 capture, Res. 2021-01 revision). The schedule was amended in 2023 — see the electrical-permit entry, and confirm the current figure against the Town's current Master Fee Schedule before pricing. Mechanical work tied to new construction or major remodels is instead billed under the project's overall valuation-based Building Permit Fee.Review timeline
Inspection process
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances and combustion air verified
See the full Paradise Valley inspection guide — scheduling & re-inspection fees →
Tips
- The Town's ACCA Manual J/S guidance explicitly instructs against adding a 'safety factor' or designing for record-breaking temperatures — using its published design-condition figures directly is the expected approach for plan review approval.
- As with electrical and plumbing, the $130 flat mechanical fee traces to the Town's 2021-effective Master Fee Schedule; the 2023 amendment is not published in a form that confirms the current figure (see the electrical-permit entry). Confirm current pricing with the Building Safety Department at 480-348-3692.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Paradise Valley building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Paradise Valley's permit history is searchable by address
11,002 permits on record for Paradise Valley, 2016–2026 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
Other permits in Paradise Valley
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Paradise Valley project checklist
Describe your project once and get every permit, document, and fee it triggers in Paradise Valley — in one checklist. Free, for any city and any number of projects.
Get started →