Mechanical / HVAC Permit in Bullhead City, Arizona

Required for heating, ventilation, and air conditioning installations in Bullhead City, governed by the 2018 International Mechanical Code (IMC) as adopted by the City. Billed on a flat permit-issuance fee plus an itemized unit-fee schedule per appliance/equipment type.

Verified 2026-07-06 · Source

When you need this permit

  • Mechanical permit required for installation/relocation of furnaces, boilers, compressors, air-handling units, and ventilation systems
  • Governed by the 2018 IMC as adopted by the City (BHCMC Chapter 15.28)
  • Portable heating/ventilation/cooling appliances and evaporative coolers, and self-contained refrigeration systems of 10 lbs or less refrigerant (or ≤1 HP motor), are exempt from a permit
  • Apply via Permit Application submitted in person or by mail to the Building Division at City Hall

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mechanical Permit Issuance, each permitCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.08
$26.48
Mechanical Permit Issuance, each supplemental permitCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.08
$8.18
Forced-air or gravity-type furnace, up to 100,000 Btu/hCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.08, Unit Fee Schedule
$16.69
Forced-air or gravity-type furnace, over 100,000 Btu/hCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.08
$20.51
Evaporative cooler, non-portableCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.08
$12.00
Repair/alteration/addition to heating appliance, cooling unit, absorption unit, or evaporative cooling systemCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.08
$15.43

Review timeline

Plan reviewBullhead City’s published plan-review target
45–60 business days

How long did your Mechanical / HVAC Permit permit actually take in Bullhead City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

See the full Bullhead City inspection guide — scheduling & re-inspection fees →

Tips

  • AC/HVAC repair, alteration, or addition work is billed at a flat $15.43 unit fee (plus the $26.48 issuance fee) in Bullhead City — there is no separate 'AC replacement' line item as in some other Arizona cities; new furnace installation is billed by Btu/h tier instead.
  • Portable AC units, portable evaporative coolers, and small self-contained refrigeration systems (≤10 lbs refrigerant or ≤1 HP) do not require a permit.

Frequently asked questions

Bullhead City requires a mechanical / hvac permit for: Mechanical permit required for installation/relocation of furnaces, boilers, compressors, air-handling units, and ventilation systems; Governed by the 2018 IMC as adopted by the City (BHCMC Chapter 15.28); Portable heating/ventilation/cooling appliances and evaporative coolers, and self-contained refrigeration systems of 10 lbs or less refrigerant (or ≤1 HP motor), are exempt from a permit; Apply via Permit Application submitted in person or by mail to the Building Division at City Hall. If your project isn't listed, confirm with City of Bullhead City Development Services Department — Building Division at 928-763-0124 before starting work.

$15.43 for repair/alteration/addition to a heating appliance, cooling unit, absorption unit, or evaporative cooling system, plus the $26.48 flat mechanical permit issuance fee. Source: City of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.08.

Bullhead City's published plan-review target for a mechanical / hvac permit is 45–60 business days.

You'll need: Permit Application (rev. 09/2022). See the required-documents checklist on this page for details on each.

Bullhead City requires 2 inspection(s) for a mechanical / hvac permit, in order: Rough-In, Final. Schedule each through City of Bullhead City Development Services Department — Building Division (928-763-0124).

Apply through City of Bullhead City Development Services Department — Building Division at 2355 Trane Road, Bullhead City, AZ 86442. Phone: 928-763-0124, email: schooniyom@bullheadcityaz.gov. Office hours: City Hall, 2355 Trane Road, Bullhead City, AZ 86442. Building Division main line 928-763-0124 (fax 928-763-0131); Inspection Requests line 928-763-0172. Development Services Director/Building Official: Saritti "Billy" Chooniyom, CBO (schooniyom@bullheadcityaz.gov). Sr. Plan Review/Administrative Manager: Wendy Lewis (wlewis@bullheadcityaz.gov). Manufactured-home permitting contact: dking@bullheadcityaz.gov. Permit Application Packets are submitted in person or by mail to the Building Division/Planning & Zoning Division at City Hall. Source: City of Bullhead City Building and Renovating page and 2025 AZBO Directory.. Official information: https://www.bullheadcityaz.gov/business-development/building-and-renovating/.

Bullhead City, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, §§ 9-831 through 9-840). The City of Bullhead City runs its own Development Services Department / Building Division and independently adopts and administers its own construction codes; it does not defer permitting to Mohave County. Source: City of Bullhead City 'Adopted Building Codes' notice (effective 07/01/2026) and 'Work Exempt From Permits' handout (effective 07/01/2024).; 2018 International Building Code (IBC), as published by the International Code Council, adopted with local amendments (Bullhead City Municipal Code (BHCMC) Chapter 15.12). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Residential Code (IRC), for one- and two-family dwellings and associated accessory structures, adopted with local amendments (BHCMC Chapter 15.14). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026; City of Bullhead City 2018 IRC Design Criteria sheet, effective 07/01/2024.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with local amendments (BHCMC Chapter 15.20) — one edition behind the 2018 ICC code set. Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026. The City Council approved adoption of the 2018-cycle ICC codes and 2017 NEC on 04/16/2024, effective for applications beginning 07/01/2024. Source: Mohave Daily News, 'Bullhead City moves toward updating building codes.'; 2018 International Mechanical Code (IMC), adopted with local amendments (BHCMC Chapter 15.28). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Plumbing Code (IPC), adopted with local amendments (BHCMC Chapter 15.32). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Fuel Gas Code (IFGC), adopted with local amendments (BHCMC Chapter 15.34). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Energy Conservation Code (IECC), adopted with local amendments (BHCMC Chapter 15.22). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Existing Building Code (IEBC), adopted with local amendments (BHCMC Chapter 15.26). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted with local amendments (BHCMC Chapter 15.30). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Fire Code (IFC) is referenced by the City for demolition/fire-safety provisions, but fire code administration in Bullhead City is handled by the Arizona Department of Fire, Building and Life Safety, which has separately adopted the 2024 International Fire Code; contact the Bullhead City Fire Department at (928) 758-3971 / planreview@bullheadfire.org for fire plan review. Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2010 ADA Standards for Accessible Design (ADAAG Manual, US Access Board) adopted, no local BHCMC chapter assignment (NA). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; Manufactured homes, factory-built buildings, and park model trailers are separately regulated through the City's intergovernmental agreement with the Arizona Department of Housing (ADOH) for installation, reinspection, additional inspections and extensions (fees per the ADOH Fee Schedule, A.R.S. Title 41, Chapter 37, Article 3); the City separately issues Zoning Clearance permits for placement/siting. Source: City of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.022.07.. Local amendments apply — see the Bullhead City overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bullhead City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.