Manufactured Home Installation Permit in Bisbee, Arizona
Required for placement and installation of manufactured/mobile homes within Bisbee city limits. Billed as a flat fee distinct from the standard valuation-based Building Permit fee. The home's own construction/factory standards are regulated by the State of Arizona; the City permit covers on-site placement, foundation/tie-down, and site compliance.
Verified 2026-07-06 · Source
When you need this permit
- Manufactured Home Installation Permit required for placement of a manufactured/mobile home within Bisbee city limits
- Construction/factory-build standards for the home itself are regulated directly by the State of Arizona (Department of Fire, Building and Life Safety / Office of Manufactured Housing, A.R.S. § 41-4001 et seq.); the City permit addresses on-site foundation, tie-down, and zoning/site compliance
- No building permit shall be issued unless the structure and proposed use comply with the City of Bisbee Zoning Code (City Code Section 7.1.2)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Tie-Down
Verifies foundation and tie-down compliance before final placement
- 2
Utility Clearance Inspection (Green Tag)
Utility connections verified before utility company service release; separate $55 flat fee applies
See the full Bisbee inspection guide — scheduling & re-inspection fees →
Tips
- The Manufactured Home Installation Permit is a flat $350 fee, distinct from and not calculated against the standard valuation-based Building Permit fee table.
- As of July 2026, the City of Bisbee does not appear to publish permit-specific plan review turnaround times for manufactured home installation permits on its public website. There is no verifiable online source for this — call the Building Inspector's office directly at 520-432-6000.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bisbee building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Bisbee
Manufactured Home Installation Permit in other cities
Compare manufactured home installation permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Bisbee project checklist
Describe your project once and get every permit, document, and fee it triggers in Bisbee — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →