Mobile/Manufactured Home Installation Permit in Pima, Arizona

Required for installation of a mobile or manufactured home within Town of Pima limits, whether on private land or elsewhere in town. Covers siting, utility connections, accessory structures on the sales contract, and pressure testing of gas connections. This is the one permit type for which the Town publishes a fixed, verified fee.

Verified 2026-07-07 · Source

When you need this permit

  • Permit required before installing a mobile/manufactured home within Town of Pima limits
  • If installed on private land, a detailed map showing the nearest major intersection and exact lot location must accompany the application
  • Unit identification required: manufacturer, year, model, dimensions, serial number, HUD label number, date unit entered the state
  • Installer must be listed with license number and license classification
  • Setbacks: minimum 20 ft from the front property line to the closest structure (porch, awning, carport, etc.); minimum 10 ft from the side property line; no fixed minimum from the rear property line (10 ft recommended); double-frontage/corner lots require 20 ft from both front and side property lines
  • A plot plan must be drawn showing property/lot dimensions, home location, north direction, and accessory structures (storage units, corrals, barns, etc.)
  • Inside and outside gas pressure tests are required (outside test per Uniform Plumbing Code 1979 Edition, Section 1206-2), certified by signature as conforming to Arizona Mobile and Manufactured Housing Standards Board rules (1980 Revision)
  • Fee includes the permit and 3 field inspections (2 utility, 1 accessory); additional inspections are billed separately

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Mobile/Manufactured Home Installation PermitTown of Pima Application for Mobile/Manufactured Home Installation Permit — flat fee includes the permit itself plus 3 field inspections (2 utility, 1 accessory)
$800
Additional Inspection (beyond the 3 included)Town of Pima Application for Mobile/Manufactured Home Installation Permit
$150 per inspection

Review timeline

Plan review
Not published — contact the department

How long did your Mobile/Manufactured Home Installation Permit permit actually take in Pima?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Utility Inspection (1 of 2)

    First of two utility-connection inspections included in the flat fee

  2. 2

    Utility Inspection (2 of 2)

    Second utility-connection inspection, including inside and outside gas pressure tests (outside test per Uniform Plumbing Code 1979 Ed., Sec. 1206-2)

  3. 3

    Accessory Structure Inspection

    Inspection of accessory structures listed on the sales contract (skirting/retaining wall, patio, porch, carport, awning, storage room)

See the full Pima inspection guide — scheduling & re-inspection fees →

Tips

  • This is the only Town of Pima permit type with a fully published, verified fee: $800 flat, covering the permit plus 3 inspections; additional inspections beyond those 3 are $150 each.
  • Setback rules for manufactured home installation (20 ft front, 10 ft side, no fixed rear minimum) are specific to this permit form and may differ from general zoning setbacks for site-built construction — verify with Planning & Zoning if your lot has unusual constraints.
  • Both an inside and an outside gas pressure test are required, with the outside test (meter to home) referencing the 1979 Uniform Plumbing Code Section 1206-2 — an older, narrower citation than the ICC-family codes referenced by most other Arizona jurisdictions in this dataset.

Frequently asked questions

Pima requires a mobile/manufactured home installation permit for: Permit required before installing a mobile/manufactured home within Town of Pima limits; If installed on private land, a detailed map showing the nearest major intersection and exact lot location must accompany the application; Unit identification required: manufacturer, year, model, dimensions, serial number, HUD label number, date unit entered the state; Installer must be listed with license number and license classification; Setbacks: minimum 20 ft from the front property line to the closest structure (porch, awning, carport, etc.); minimum 10 ft from the side property line; no fixed minimum from the rear property line (10 ft recommended); double-frontage/corner lots require 20 ft from both front and side property lines; A plot plan must be drawn showing property/lot dimensions, home location, north direction, and accessory structures (storage units, corrals, barns, etc.); Inside and outside gas pressure tests are required (outside test per Uniform Plumbing Code 1979 Edition, Section 1206-2), certified by signature as conforming to Arizona Mobile and Manufactured Housing Standards Board rules (1980 Revision); Fee includes the permit and 3 field inspections (2 utility, 1 accessory); additional inspections are billed separately. If your project isn't listed, confirm with Town of Pima Planning & Zoning Department — Building Division at 928-485-2611 before starting work.

$800 flat, which includes the permit itself and 3 field inspections (2 utility, 1 accessory). Additional inspections beyond those 3 are billed at $150 each, per the Town's own Application for Mobile/Manufactured Home Installation Permit.

Pima does not publish a plan-review timeline for this permit. Contact Town of Pima Planning & Zoning Department — Building Division at 928-485-2611 for current turnaround.

You'll need: Application for Mobile/Manufactured Home Installation Permit; Plot Plan. Depending on your project, Pima may also ask for: Site/Location Map (private land only). See the required-documents checklist on this page for details on each.

Pima requires 3 inspection(s) for a mobile/manufactured home installation permit, in order: Utility Inspection (1 of 2), Utility Inspection (2 of 2), Accessory Structure Inspection. Schedule each through Town of Pima Planning & Zoning Department — Building Division (928-485-2611).

Apply through Town of Pima Planning & Zoning Department — Building Division at 110 W. Center St. / PO Box 426, Pima, AZ 85543. Phone: 928-485-2611, email: building@pimatown.az.gov. Office hours: Planning & Zoning Administrator: Joe Carpenter, 928-322-4860, building@pimatown.az.gov. The Planning & Zoning Board meets the 3rd Tuesday of each month at 7:00 PM. Building, Addition/Remodel, and Solar/Electrical/Gas/Cell-Tower permit applications (plans required as uploads) plus Sign/Fence permits are submitted through the Town's online iWorq Citizen Portal (pimaaz23.portal.iworq.net/portalhome/pimaaz23); a paper Mobile/Manufactured Home Installation Permit application and a Building & Sub-Contractors Information form are also available directly from the Town.. Official information: https://www.pimatown.az.gov/departments/planning_and_zoning.php.

Pima, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Pima independently operates its own Planning & Zoning Department / Building Division with its own Planning & Zoning Board, building inspector, building official, permit intake (iWorq portal), and Certificate of Occupancy process — it is NOT administered by Graham County. Source: Town of Pima Planning and Zoning page (pimatown.az.gov/departments/planning_and_zoning.php); Town of Pima Building & Sub-Contractors Information form (references 'the building department,' 'building inspector,' 'ordinances of the Town of Pima,' and a Certificate-of-Occupancy requirement 'obtained from the building inspector').; CODE EDITION CONFIRMED, AND RE-VERIFIED 2026-07-23 WITH A CHAPTER-NUMBERING CORRECTION: the Town's own 'Town Code' PDF, linked live from the Town Code page (current filename 'Town Code 2024_edited_3-23-2026.pdf' as of both the 2026-07-16 and 2026-07-23 passes), directly fetched and text-extracted again on 2026-07-23, confirms Chapter 7 (Building) is organized as: Article 7-1 Building Code, 7-2 Electrical Code, 7-3 Mechanical Code, 7-4 Plumbing Code, 7-5 Building Officials, 7-6 Utility Hookups, 7-7 Building Inspections, 7-8 Residential Code, 7-9 Uniform Fire Code, 7-10 Fuel Gas Code, 7-11 Existing Building Code, 7-12 Sewer Service Taps, 7-13 Certificate of Occupancy Requirements. This CORRECTS the prior pass's claim that Article 7-6 is the Residential Code — Article 7-6 is actually 'Utility Hookups' (a short unlawful-hookup-without-a-permit provision); the Residential Code is Article 7-8. Exact adoption language confirmed by direct quote: Article 7-1 Sec. 7-1-1, 'That certain code entitled International Building Code, 2009 edition is hereby adopted as the Building Code of the Town of Pima'; Article 7-8, 'That certain code entitled International Residential Code, 2009 Edition ... is hereby adopted as Residential Code of the Town of Pima'; and Article 7-11, 'That certain code entitled International Existing Building Code, 2009 Edition ... is hereby adopted as the Existing Building Code of the Town of Pima.' NEWLY CONFIRMED on this pass (previously missing from this file): Article 7-2 adopts 'International Electrical Code (70), 2011 Edition, published by the National Fire Protection Association' (i.e. NFPA 70 / National Electrical Code, 2011 Edition — NOT a 2009-family ICC code, and a different, newer edition than the rest of Chapter 7); Article 7-3 adopts the International Mechanical Code, 2009 Edition; Article 7-4 adopts the International Plumbing Code, 2009 Edition; Article 7-9 adopts the International Fire Code, 2009 Edition (the code text attributes publication to NFPA, quoted as written); Article 7-10 adopts the International Fuel Gas Code, 2009 Edition. No Municode/American Legal Publishing/CivicPlus code library exists for the Town of Pima — the Town's own compiled PDF Code of Ordinances is the sole publication. PENDING CHANGE FLAGGED, NOT YET LAW: the Town of Pima Planning & Zoning Commission, at its regular meeting July 21, 2026 (Minutes of the Regular Meeting of the Planning & Zoning Commission, Tuesday, July 21, 2026), voted unanimously to recommend that the Town Council adopt a new building code under attached Ordinance 2026-05, with P&Z Administrator Joe Carpenter stating that Graham County, the Town of Thatcher, and the City of Safford are all adopting the same new code and that Pima had not yet done so; the specific proposed code edition was not stated in the minutes text and the attached ordinance exhibit is a scanned/image-only PDF not machine-readable in this pass. As of 2026-07-23 this is only a Commission recommendation — the Town Council's own posted agendas/minutes run through July 14, 2026 (before the July 21 P&Z recommendation) with no August 2026 meeting yet posted, so Ordinance 2026-05 has NOT yet been voted on by Council and the 2009 IBC/IRC/IEBC + 2011 NEC editions quoted above remain the currently codified, live law. Recheck this file after a Town Council vote on Ordinance 2026-05 is posted.; Manufactured/mobile home installation is separately regulated: units are subject to the Arizona Mobile and Manufactured Housing Standards Board's statewide rules (1980 Revision cited on the Town's own application form) for the unit itself, with the Town issuing a separate local installation permit (siting, utility connections, accessory structures, plot plan, and pressure testing per Uniform Plumbing Code 1979 Edition Sec. 1206-2, per the Town's own application form). Source: Town of Pima Application for Mobile/Manufactured Home Installation Permit.. Local amendments apply — see the Pima overview page for the full list.

Per the Town's own application form: minimum 20 feet from the front property line to the closest structure (porch, awning, carport, etc.), minimum 10 feet from the side property line, no fixed minimum from the rear property line (10 feet recommended), and for corner/double-frontage lots, 20 feet from both the front and side property lines.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pima building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.