Pima building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Pima, Arizona.

Verified 2026-07-23 · Source

How to schedule

Inspections are requested through the building department below.

Address
110 W. Center St. / PO Box 426, Pima, AZ 85543
Phone
928-485-2611
Office hours
Planning & Zoning Administrator: Joe Carpenter, 928-322-4860, building@pimatown.az.gov. The Planning & Zoning Board meets the 3rd Tuesday of each month at 7:00 PM. Building, Addition/Remodel, and Solar/Electrical/Gas/Cell-Tower permit applications (plans required as uploads) plus Sign/Fence permits are submitted through the Town's online iWorq Citizen Portal (pimaaz23.portal.iworq.net/portalhome/pimaaz23); a paper Mobile/Manufactured Home Installation Permit application and a Building & Sub-Contractors Information form are also available directly from the Town.

Inspection sequence

Applies to: Building / Addition / Remodel Permit

  1. 1

    Rough Plumbing

    Per Town Code Article 7-7 (Building Inspections) and Article 7-13 (Certificate of Occupancy Requirements): must pass an air or water test before the trench may be covered

  2. 2

    Pre-Concrete

    All rebar, fiber bar, mesh, etc. must be in place before concrete pour

  3. 3

    Framing/Roofing

    Structural framing and roofing inspection; catwalk in attic for all appliances must be in place

  4. 4

    Mechanical/Electrical

    Must be completed before drywall installation

  5. 5

    Drywall

    Inspected for nail-off before tape and texture

  6. 6

    Final / Certificate of Occupancy

    Must be move-in ready: GFCIs correctly located and operational, all flooring installed, smoke detectors operational, garage doors installed and operational, all appliances installed and operational, all receptacle cover plates installed. Certificate of Occupancy is issued only once all inspections have passed; occupancy before CO issuance is expressly prohibited. Applicants must call Town Hall during business hours with a minimum of 24-hour notice for each inspection.

Applies to: Mobile/Manufactured Home Installation Permit

  1. 1

    Utility Inspection (1 of 2)

    First of two utility-connection inspections included in the flat fee

  2. 2

    Utility Inspection (2 of 2)

    Second utility-connection inspection, including inside and outside gas pressure tests (outside test per Uniform Plumbing Code 1979 Ed., Sec. 1206-2)

  3. 3

    Accessory Structure Inspection

    Inspection of accessory structures listed on the sales contract (skirting/retaining wall, patio, porch, carport, awning, storage room)

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    EVSE circuit wiring inspected prior to enclosure, where applicable

  2. 2

    Final

    Final inspection and utility interconnection verification

Applies to: Solar / Electrical / Gas / Cell Tower Permit

  1. 1

    Rough-In

    Wiring/piping inspection prior to enclosure, where applicable

  2. 2

    Final

    Final inspection and utility interconnection verification

Final inspection only: Sign / Fence Permit

Re-inspection fees

Building / Addition / Remodel PermitRe-inspection Fee · Town of Pima Schedule of Fees and Charges, Planning and Zoning table.
$50.00 per failed inspection