Pima building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Pima, Arizona.
Last verified 2026-07-23 · Source · Embed this page’s badge · Version history
Building department
- Address
- 110 W. Center St. / PO Box 426, Pima, AZ 85543
- Phone
- 928-485-2611
- Office hours
- Planning & Zoning Administrator: Joe Carpenter, 928-322-4860, building@pimatown.az.gov. The Planning & Zoning Board meets the 3rd Tuesday of each month at 7:00 PM. Building, Addition/Remodel, and Solar/Electrical/Gas/Cell-Tower permit applications (plans required as uploads) plus Sign/Fence permits are submitted through the Town's online iWorq Citizen Portal (pimaaz23.portal.iworq.net/portalhome/pimaaz23); a paper Mobile/Manufactured Home Installation Permit application and a Building & Sub-Contractors Information form are also available directly from the Town.
- Website
- Official site
- Permit portal
- Apply online at Pima's portal
Inspection guide
See how inspections work in Pima — sequence, scheduling & re-inspection fees.
Codes adopted
Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.
Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Show full textShow less
Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Pima independently operates its own Planning & Zoning Department / Building Division with its own Planning & Zoning Board, building inspector, building official, permit intake (iWorq portal), and Certificate of Occupancy process — it is NOT administered by Graham County. Source: Town of Pima Planning and Zoning page (pimatown.az.gov/departments/planning_and_zoning.php); Town of Pima Building & Sub-Contractors Information form (references 'the building department,' 'building inspector,' 'ordinances of the Town of Pima,' and a Certificate-of-Occupancy requirement 'obtained from the building inspector').
The Town's own 'Town Code' PDF, linked live from the Town Code page (current filename 'Town Code 2024_edited_3-23-2026.pdf'), confirms Chapter 7 (Building) is organized as: Article 7-1 Building Code, 7-2 Electrical Code,… Show full textShow less
The Town's own 'Town Code' PDF, linked live from the Town Code page (current filename 'Town Code 2024_edited_3-23-2026.pdf'), confirms Chapter 7 (Building) is organized as: Article 7-1 Building Code, 7-2 Electrical Code, 7-3 Mechanical Code, 7-4 Plumbing Code, 7-5 Building Officials, 7-6 Utility Hookups, 7-7 Building Inspections, 7-8 Residential Code, 7-9 Uniform Fire Code, 7-10 Fuel Gas Code, 7-11 Existing Building Code, 7-12 Sewer Service Taps, 7-13 Certificate of Occupancy Requirements. Article 7-6 is 'Utility Hookups' (a short unlawful-hookup-without-a-permit provision); the Residential Code is Article 7-8. Exact adoption language confirmed by direct quote: Article 7-1 Sec. 7-1-1, 'That certain code entitled International Building Code, 2009 edition is hereby adopted as the Building Code of the Town of Pima'; Article 7-8, 'That certain code entitled International Residential Code, 2009 Edition... is hereby adopted as Residential Code of the Town of Pima'; and Article 7-11, 'That certain code entitled International Existing Building Code, 2009 Edition... is hereby adopted as the Existing Building Code of the Town of Pima.' Article 7-2 adopts 'International Electrical Code (70), 2011 Edition, published by the National Fire Protection Association' (i.e. NFPA 70 / National Electrical Code, 2011 Edition — NOT a 2009-family ICC code, and a different, newer edition than the rest of Chapter 7); Article 7-3 adopts the International Mechanical Code, 2009 Edition; Article 7-4 adopts the International Plumbing Code, 2009 Edition; Article 7-9 adopts the International Fire Code, 2009 Edition (the code text attributes publication to NFPA, quoted as written); Article 7-10 adopts the International Fuel Gas Code, 2009 Edition. No Municode/American Legal Publishing/CivicPlus code library exists for the Town of Pima — the Town's own compiled PDF Code of Ordinances is the sole publication. PENDING CHANGE FLAGGED, NOT YET LAW: the Town of Pima Planning & Zoning Commission, at its regular meeting July 21, 2026 (Minutes of the Regular Meeting of the Planning & Zoning Commission, Tuesday, July 21, 2026), voted unanimously to recommend that the Town Council adopt a new building code under attached Ordinance 2026-05, with P&Z Administrator Joe Carpenter stating that Graham County, the Town of Thatcher, and the City of Safford are all adopting the same new code and that Pima had not yet done so; the specific proposed code edition is not stated in the minutes text (the attached ordinance exhibit is a scanned/image-only PDF). As of 2026-07-23 this is only a Commission recommendation — the Town Council's own posted agendas/minutes run through July 14, 2026 (before the July 21 P&Z recommendation) with no August 2026 meeting yet posted, so Ordinance 2026-05 has NOT yet been voted on by Council and the 2009 IBC/IRC/IEBC + 2011 NEC editions quoted above remain the currently codified, live law. Confirm status after a Town Council vote on Ordinance 2026-05 is posted.
Manufactured/mobile home installation is separately regulated: units are subject to the Arizona Mobile and Manufactured Housing Standards Board's statewide rules (1980 Revision cited on the Town's own application form)… Show full textShow less
Manufactured/mobile home installation is separately regulated: units are subject to the Arizona Mobile and Manufactured Housing Standards Board's statewide rules (1980 Revision cited on the Town's own application form) for the unit itself, with the Town issuing a separate local installation permit (siting, utility connections, accessory structures, plot plan, and pressure testing per Uniform Plumbing Code 1979 Edition Sec. 1206-2, per the Town's own application form). Source: Town of Pima Application for Mobile/Manufactured Home Installation Permit.
Permit types & fees
Building / Addition / Remodel Permit
Required for new construction, additions, and remodels within Town of Pima limits. Applications, including uploaded building plans, are submitted through the Town's iWorq Citizen Portal. The Town's own compiled Code of Ordinances (Article 7-1 Building Code, Article 7-6 Residential Code, Article 7-11 Existing Building Code — linked live from the Town Code page) adopts the 2009 International Building Code, 2009 International Residential Code, and 2009 International Existing Building Code by reference; confirm with the Building Division whether later amendments apply before design.
From$100.00Solar / Electrical / Gas / Cell Tower Permit
Required for solar photovoltaic installations, electrical work, gas-line work, and cell tower installations within Town of Pima limits. Applicants must separately coordinate utility interconnection approval with Graham County Electric (the local rural electric cooperative). Applications are submitted through the Town's iWorq Citizen Portal.
From$225.00Mobile/Manufactured Home Installation Permit
Required for installation of a mobile or manufactured home within Town of Pima limits, whether on private land or elsewhere in town. Covers siting, utility connections, accessory structures on the sales contract, and pressure testing of gas connections. This is the one permit type for which the Town publishes a fixed, verified fee.
From$800Sign / Fence Permit
Required for installation of signs or fences within Town of Pima limits. Applications are submitted through the Town's iWorq Citizen Portal under a dedicated Sign/Fence application category. The Town's own live Town Code (Section 12-3-2.B.7/B.8, AR Zone) publishes specific fence-height and small home-occupation-sign standards, and the Town's live Schedule of Fees and Charges publishes specific fees for both.
From$0.75EV Charger / EVSE Permit
The Town of Pima has no EV-charger-specific permit type, application, or fee. An EV charger (EVSE) installation is electrical work and is filed under the Town's combined Solar/Electrical/Gas/Cell Tower Permit category on the iWorq Citizen Portal, the same as any other electrical work in Town limits. Utility interconnection (where applicable) must be separately coordinated with Graham County Electric, the local rural electric cooperative. No fee amount is published for this combined electrical category, EV-specific or otherwise.
From$50.00Commercial / Industrial Building Permit
Required for new commercial/industrial building construction and for additions, renovations, and alterations to existing commercial or industrial buildings within Town of Pima limits. The Town of Pima's own Planning & Zoning Department / Building Division issues and inspects this permit — NOT Graham County — confirmed by: (1) the Town's own Building & Sub-Contractors Information form, which lists 'Commercial/Industrial' as one of five permit categories (alongside Single-Family Residential, Multi-Family Residential, Garage, and Other) using the same building-inspector/Certificate-of-Occupancy process as residential work; (2) the Town's own live Schedule of Fees and Charges, which prices a distinct 'Commercial/ Industrial Permit' line at $0.75 per square foot; and (3) Town Code Article 7-1, which adopts the 2009 International Building Code as 'the Building Code of the Town of Pima' (the 2009 International Residential Code, Article 7-8, governs residential work instead) with no separate commercial administering body referenced anywhere in Chapter 7. There is no standalone Tenant Improvement permit type, application, or fee schedule: Town Code Section 7-1-3's building-permit-requirements list treats 'Renovations' as one general category (not split by occupancy type), the Town's iWorq Citizen Portal has no commercial-specific or tenant-improvement-specific application category (only 'Building / Addition / Remodel,' 'Solar, Electrical, and Gas Only,' and 'Sign / Fence'), and the Town's live fee schedule has only the single Commercial/Industrial Permit line with no separate TI figure — alterations to an existing commercial building are filed as a renovation under the same Commercial/Industrial category, billed at the identical $0.75/sq ft rate.
From$100.00
Pima's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Pima yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Pima lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-07)
- 5units
5 buildings · $122,000 valuation
- Trailing 12 months
- 33units
11 of 12 months reported · #53 in Arizona coverage by units
- Year to date (2026 YTD through 2026-07)
- 18units
18 buildings · $4M valuation
7 month(s) reported to Census
- Full year 2025
- 46units
32 buildings · $10.6M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity
Tips & gotchas
- Do not confuse the Town of Pima (Graham County, population ~2,847, a small farming town) with Pima County (home to Tucson) — they are entirely separate governments with entirely separate permitting systems. This entry covers ONLY the Town of Pima.
- The Town of Pima genuinely operates its own independent building department (own Planning & Zoning Board, building inspector, Certificate of Occupancy process, iWorq permit portal) — it is not administered by Graham County. The Town DOES publish its adopted ICC code editions: its compiled Town Code PDF (linked live from the Town Code page) adopts the 2009 IBC (Art. 7-1), 2009 IRC (Art. 7-8), 2009 IEBC (Art. 7-11), 2009 Mechanical/Plumbing/Fuel Gas/Fire Codes (Art. 7-3/7-4/7-10/7-9), and the 2011 National Electrical Code/NFPA 70 (Art. 7-2) by reference. As of July 21, 2026 the Planning & Zoning Commission has recommended the Town Council adopt a newer, unspecified building code (Ordinance 2026-05, to align with Graham County/Thatcher/Safford) — the Council had not yet voted on it as of 2026-07-23, so the 2009-era editions above remain current law; recheck after a Council vote is posted.
- The Town DOES publish a general Schedule of Fees and Charges — a live, un-linked, root-level PDF (New Fee Schedule.pdf). It prices Residential Building Permits at $0.50/livable sq ft, Commercial/Industrial at $0.75/sq ft, Utility additions and Accessory Structures at $0.25/sq ft each, Solar Permits at $225, Electrical Upgrades at $50, Fence Permits at $0.75/linear ft, and Sign Permits at $50-$150 depending on size — plus a flat $100 Administrative Fee added to every permit type EXCEPT the Fence Permit. The $800 flat Mobile/Manufactured Home Installation Permit fee, independently confirmed from the Town's application form, exactly matches this schedule's own 'Mobile Home $800.00' line, cross-confirming the schedule's reliability.
- No plan-review/permit-issuance TIMELINE (business-day or calendar-day turnaround) is published anywhere for any Town of Pima permit type, even after locating the fee schedule — the fee schedule contains dollar amounts only, no timeframes, and no A.R.S. § 9-835 administrative-completeness/substantive-review table is codified in the Town's own Town Code. This gap remains genuinely unpublished as of 2026-07-23.
- Solar/electrical/gas/cell-tower applicants must separately coordinate with Graham County Electric (a rural electric cooperative) for utility interconnection — this is a utility-company requirement, not evidence of county government permitting authority over Pima.
- Before starting any project, contact the Planning & Zoning Administrator, Joe Carpenter, directly (928-322-4860, building@pimatown.az.gov) to confirm current review timelines and whether Ordinance 2026-05 has since been adopted by the Town Council, since these two details remain unpublished online.