Skip to main content
PermitBase

Pima building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Pima, Arizona.

Last verified 2026-07-23 · Source · Embed this page’s badge · Version history

Building department

Address
110 W. Center St. / PO Box 426, Pima, AZ 85543
Phone
928-485-2611
Office hours
Planning & Zoning Administrator: Joe Carpenter, 928-322-4860, building@pimatown.az.gov. The Planning & Zoning Board meets the 3rd Tuesday of each month at 7:00 PM. Building, Addition/Remodel, and Solar/Electrical/Gas/Cell-Tower permit applications (plans required as uploads) plus Sign/Fence permits are submitted through the Town's online iWorq Citizen Portal (pimaaz23.portal.iworq.net/portalhome/pimaaz23); a paper Mobile/Manufactured Home Installation Permit application and a Building & Sub-Contractors Information form are also available directly from the Town.

Inspection guide

See how inspections work in Pima — sequence, scheduling & re-inspection fees.

Codes adopted

Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.

  • Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Pima independently operates its own Planning & Zoning Department / Building Division with its own Planning & Zoning Board, building inspector, building official, permit intake (iWorq portal), and Certificate of Occupancy process — it is NOT administered by Graham County. Source: Town of Pima Planning and Zoning page (pimatown.az.gov/departments/planning_and_zoning.php); Town of Pima Building & Sub-Contractors Information form (references 'the building department,' 'building inspector,' 'ordinances of the Town of Pima,' and a Certificate-of-Occupancy requirement 'obtained from the building inspector').
  • CODE EDITION CONFIRMED, AND RE-VERIFIED 2026-07-23 WITH A CHAPTER-NUMBERING CORRECTION: the Town's own 'Town Code' PDF, linked live from the Town Code page (current filename 'Town Code 2024_edited_3-23-2026.pdf' as of both the 2026-07-16 and 2026-07-23 passes), directly fetched and text-extracted again on 2026-07-23, confirms Chapter 7 (Building) is organized as: Article 7-1 Building Code, 7-2 Electrical Code, 7-3 Mechanical Code, 7-4 Plumbing Code, 7-5 Building Officials, 7-6 Utility Hookups, 7-7 Building Inspections, 7-8 Residential Code, 7-9 Uniform Fire Code, 7-10 Fuel Gas Code, 7-11 Existing Building Code, 7-12 Sewer Service Taps, 7-13 Certificate of Occupancy Requirements. This CORRECTS the prior pass's claim that Article 7-6 is the Residential Code — Article 7-6 is actually 'Utility Hookups' (a short unlawful-hookup-without-a-permit provision); the Residential Code is Article 7-8. Exact adoption language confirmed by direct quote: Article 7-1 Sec. 7-1-1, 'That certain code entitled International Building Code, 2009 edition is hereby adopted as the Building Code of the Town of Pima'; Article 7-8, 'That certain code entitled International Residential Code, 2009 Edition ... is hereby adopted as Residential Code of the Town of Pima'; and Article 7-11, 'That certain code entitled International Existing Building Code, 2009 Edition ... is hereby adopted as the Existing Building Code of the Town of Pima.' NEWLY CONFIRMED on this pass (previously missing from this file): Article 7-2 adopts 'International Electrical Code (70), 2011 Edition, published by the National Fire Protection Association' (i.e. NFPA 70 / National Electrical Code, 2011 Edition — NOT a 2009-family ICC code, and a different, newer edition than the rest of Chapter 7); Article 7-3 adopts the International Mechanical Code, 2009 Edition; Article 7-4 adopts the International Plumbing Code, 2009 Edition; Article 7-9 adopts the International Fire Code, 2009 Edition (the code text attributes publication to NFPA, quoted as written); Article 7-10 adopts the International Fuel Gas Code, 2009 Edition. No Municode/American Legal Publishing/CivicPlus code library exists for the Town of Pima — the Town's own compiled PDF Code of Ordinances is the sole publication. PENDING CHANGE FLAGGED, NOT YET LAW: the Town of Pima Planning & Zoning Commission, at its regular meeting July 21, 2026 (Minutes of the Regular Meeting of the Planning & Zoning Commission, Tuesday, July 21, 2026), voted unanimously to recommend that the Town Council adopt a new building code under attached Ordinance 2026-05, with P&Z Administrator Joe Carpenter stating that Graham County, the Town of Thatcher, and the City of Safford are all adopting the same new code and that Pima had not yet done so; the specific proposed code edition was not stated in the minutes text and the attached ordinance exhibit is a scanned/image-only PDF not machine-readable in this pass. As of 2026-07-23 this is only a Commission recommendation — the Town Council's own posted agendas/minutes run through July 14, 2026 (before the July 21 P&Z recommendation) with no August 2026 meeting yet posted, so Ordinance 2026-05 has NOT yet been voted on by Council and the 2009 IBC/IRC/IEBC + 2011 NEC editions quoted above remain the currently codified, live law. Recheck this file after a Town Council vote on Ordinance 2026-05 is posted.
  • Manufactured/mobile home installation is separately regulated: units are subject to the Arizona Mobile and Manufactured Housing Standards Board's statewide rules (1980 Revision cited on the Town's own application form) for the unit itself, with the Town issuing a separate local installation permit (siting, utility connections, accessory structures, plot plan, and pressure testing per Uniform Plumbing Code 1979 Edition Sec. 1206-2, per the Town's own application form). Source: Town of Pima Application for Mobile/Manufactured Home Installation Permit.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
2units

2 buildings · $488,000 valuation

Trailing 12 months
29units

11 of 12 months reported · #54 in Arizona coverage by units

Year to date (2026 YTD through 2026-05)
10units

10 buildings · $2.6M valuation

5 month(s) reported to Census

Full year 2025
46units

32 buildings · $10.6M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity

Tips & gotchas

  • Do not confuse the Town of Pima (Graham County, population ~2,847, a small farming town) with Pima County (home to Tucson) — they are entirely separate governments with entirely separate permitting systems. This file covers ONLY the Town of Pima.
  • The Town of Pima genuinely operates its own independent building department (own Planning & Zoning Board, building inspector, Certificate of Occupancy process, iWorq permit portal) — it is not administered by Graham County. The Town DOES publish its adopted ICC code editions: its compiled Town Code PDF (linked live from the Town Code page) adopts the 2009 IBC (Art. 7-1), 2009 IRC (Art. 7-8), 2009 IEBC (Art. 7-11), 2009 Mechanical/Plumbing/Fuel Gas/Fire Codes (Art. 7-3/7-4/7-10/7-9), and the 2011 National Electrical Code/NFPA 70 (Art. 7-2) by reference. As of July 21, 2026 the Planning & Zoning Commission has recommended the Town Council adopt a newer, unspecified building code (Ordinance 2026-05, to align with Graham County/Thatcher/Safford) — the Council had not yet voted on it as of this review (2026-07-23), so the 2009-era editions above remain current law; recheck after a Council vote is posted.
  • GAP CLOSED 2026-07-23: the Town DOES publish a general Schedule of Fees and Charges — it's a live, un-linked, root-level PDF (New Fee Schedule.pdf) located via Wayback Machine and confirmed still live. It prices Residential Building Permits at $0.50/livable sq ft, Commercial/Industrial at $0.75/sq ft, Utility additions and Accessory Structures at $0.25/sq ft each, Solar Permits at $225, Electrical Upgrades at $50, Fence Permits at $0.75/linear ft, and Sign Permits at $50-$150 depending on size — plus a flat $100 Administrative Fee added to every permit type EXCEPT the Fence Permit. The $800 flat Mobile/Manufactured Home Installation Permit fee (previously the only verified fee in this dataset) exactly matches this schedule's own 'Mobile Home $800.00' line, cross-confirming the schedule's reliability.
  • No plan-review/permit-issuance TIMELINE (business-day or calendar-day turnaround) is published anywhere for any Town of Pima permit type, even after locating the fee schedule — the fee schedule contains dollar amounts only, no timeframes, and no A.R.S. § 9-835 administrative-completeness/substantive-review table is codified in the Town's own Town Code. This gap remains genuinely unpublished as of 2026-07-23.
  • Solar/electrical/gas/cell-tower applicants must separately coordinate with Graham County Electric (a rural electric cooperative) for utility interconnection — this is a utility-company requirement, not evidence of county government permitting authority over Pima.
  • Before starting any project, contact the Planning & Zoning Administrator, Joe Carpenter, directly (928-322-4860, building@pimatown.az.gov) to confirm current review timelines and whether Ordinance 2026-05 has since been adopted by the Town Council, since these two details remain unpublished online as of this review.

Related guides

Comparable nearby cities

Safford
Both in Graham County3 shared permit types~9 mi away
Compare fees →
Thatcher
Both in Graham County2 shared permit types~7 mi away
Compare fees →
Unincorporated Graham County
Both in Graham County3 shared permit types
Compare fees →