Version history — Pima, Arizona
This is PermitBase’s own verified record for Pima, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Pima’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- Pima, Arizona — adopted-codes record updated
- 2026-08-20Superseded
- Pima, Arizona — Solar / Electrical / Gas / Cell Tower Permit fee record added: Gas Permit (no distinct fee line item published) (Not separately itemized)
- Pima, Arizona — Commercial / Industrial Building Permit fee record added: Tenant Improvement (no distinct fee line item published) (Not separately itemized; billed as Commercial/Industrial Permit, $0.75 per square foot)
- Pima, Arizona — Commercial / Industrial Building Permit fee record added: Certificate of Occupancy fee (no distinct fee line item published) (Not separately itemized)
- Pima, Arizona — Solar / Electrical / Gas / Cell Tower Permit fee record removed: Gas Permit (verified-negative — no distinct fee line item)
- Pima, Arizona — Commercial / Industrial Building Permit fee record removed: Tenant Improvement (verified-negative — no distinct fee line item)
- Pima, Arizona — Commercial / Industrial Building Permit fee record removed: Certificate of Occupancy fee (verified-negative — no distinct fee line item)
- 2026-08-01Superseded
- Pima, Arizona — Commercial / Industrial Building Permit record added
- 2026-07-23Superseded
- Pima, Arizona — adopted-codes record updated
- Pima, Arizona — fee schedule re-verified across 4 permit types
- 2026-07-20Superseded
- Pima, Arizona — EV Charger / EVSE Permit record added
- 2026-07-16Superseded
- 2026-07-07Initial record — coverage of Pima began