Skip to main content
PermitBase

Version history — Pima, Arizona

This is PermitBase’s own verified record for Pima, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Pima’s actual law was at that time.

Permanent link to today’s record

/arizona/graham-county/pima/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
    • Pima, Arizona — adopted-codes record updated
  • 2026-08-20Superseded
    • Pima, Arizona — Solar / Electrical / Gas / Cell Tower Permit fee record added: Gas Permit (no distinct fee line item published) (Not separately itemized)
    • Pima, Arizona — Commercial / Industrial Building Permit fee record added: Tenant Improvement (no distinct fee line item published) (Not separately itemized; billed as Commercial/Industrial Permit, $0.75 per square foot)
    • Pima, Arizona — Commercial / Industrial Building Permit fee record added: Certificate of Occupancy fee (no distinct fee line item published) (Not separately itemized)
    • Pima, Arizona — Solar / Electrical / Gas / Cell Tower Permit fee record removed: Gas Permit (verified-negative — no distinct fee line item)
    • Pima, Arizona — Commercial / Industrial Building Permit fee record removed: Tenant Improvement (verified-negative — no distinct fee line item)
    • Pima, Arizona — Commercial / Industrial Building Permit fee record removed: Certificate of Occupancy fee (verified-negative — no distinct fee line item)
  • 2026-08-01Superseded
    • Pima, Arizona — Commercial / Industrial Building Permit record added
  • 2026-07-23Superseded
    • Pima, Arizona — adopted-codes record updated
    • Pima, Arizona — fee schedule re-verified across 4 permit types
  • 2026-07-20Superseded
    • Pima, Arizona — EV Charger / EVSE Permit record added
  • 2026-07-16Superseded
  • 2026-07-07Initial record — coverage of Pima began