This is PermitBase’s published record for Pima as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Pima building permits

Pima, Arizona — as published 2026-07-07.

Reviewed 2026-07-07 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Pima independently operates its own Planning & Zoning Department / Building Division with its own Planning & Zoning Board, building inspector, building official, permit intake (iWorq portal), and Certificate of Occupancy process — it is NOT administered by Graham County. Source: Town of Pima Planning and Zoning page (pimatown.az.gov/departments/planning_and_zoning.php); Town of Pima Building & Sub-Contractors Information form (references 'the building department,' 'building inspector,' 'ordinances of the Town of Pima,' and a Certificate-of-Occupancy requirement 'obtained from the building inspector').UNVERIFIED CODE EDITION — chased and not found published: no ICC code edition (IBC/IRC/IMC/IPC/IFGC/IEBC), NEC edition, or code-adoption ordinance number could be located for the Town of Pima despite an exhaustive search: the Town's own 'Town Code' PDF link (previously present on the Town Code page as of a January 16, 2026 Wayback Machine snapshot, filename 'Town Code 2024_edited_11-13-2025.pdf') has since been removed from the live site (as of this review, July 2026) and no Wayback Machine snapshot of the PDF file itself (as opposed to the HTML page linking to it) could be found under any URL variant. No Municode/American Legal Publishing/CivicPlus code library exists for the Town of Pima (unlike Graham County's other incorporated towns, several of which publish via amlegal.com). Confirm the currently adopted code edition directly with the Building Division (928-322-4860 / building@pimatown.az.gov) before relying on any specific ICC-edition assumption for a live project.Manufactured/mobile home installation is separately regulated: units are subject to the Arizona Mobile and Manufactured Housing Standards Board's statewide rules (1980 Revision cited on the Town's own application form) for the unit itself, with the Town issuing a separate local installation permit (siting, utility connections, accessory structures, plot plan, and pressure testing per Uniform Plumbing Code 1979 Edition Sec. 1206-2, per the Town's own application form). Source: Town of Pima Application for Mobile/Manufactured Home Installation Permit.

Permit types & fees

Building / Addition / Remodel Permit

Required for new construction, additions, and remodels within Town of Pima limits. Applications, including uploaded building plans, are submitted through the Town's iWorq Citizen Portal. The specific ICC code edition enforced (IBC/IRC and related codes) is not published anywhere on the Town's website or in any locatable archived source as of this review — confirm directly with the Building Division before design.

Reviewed 2026-07-07 · Source

Requirements

  • Building permit required for building, addition, and remodel work within Town of Pima limits
  • Building plans must be uploaded as part of the online application submittal via the iWorq Citizen Portal
  • A completed Building & Sub-Contractors Information form is required, listing the owner and all trade contractors/subcontractors (General, Excavating, Concrete, Mason, Framing, Drywall, Painting, HVAC, Electrical, Plumbing, Roofing) with name, address, phone, and business-license/bond status
  • A Plot and Drainage Plan (Exhibit A) is required showing structures, utilities, septic/well locations, setbacks, easements, and drainage/retention details
  • Construction must commence within 6 months and be completed within 1 year of the application date
  • Occupancy of any space is prohibited until a Certificate of Occupancy is obtained from the Town's building inspector
  • Power of Attorney form required if the applicant is not the property owner acting directly

Required documents

  • RequiredBuilding/Addition/Remodel Permit ApplicationSubmitted via the Town of Pima iWorq Citizen Portal (pimaaz23.portal.iworq.net/portalhome/pimaaz23); requires uploaded building plans
  • RequiredBuilding & Sub-Contractors Information FormTown of Pima form listing owner and all trade contractors/subcontractors by name, address, phone, and license/bond status
  • RequiredPlot Plan (Exhibit A)Plot and drainage plan showing existing/proposed structures, utilities, septic/well, setbacks, easements, and drainage/retention measures
  • OptionalPower of AttorneyRequired if someone other than the owner is submitting/signing on the owner's behalf

Fee schedule

Fee typeAmountNotes
Building Permit Fee (general Building/Addition/Remodel)Not publishedNo general building-permit fee schedule (valuation table, plan-review percentage, or flat fee) could be located on the Town's website, Document Center, or via Wayback Machine as of this review. Contact the Planning & Zoning Administrator (928-322-4860, building@pimatown.az.gov) for current fee amounts.

Solar / Electrical / Gas / Cell Tower Permit

Required for solar photovoltaic installations, electrical work, gas-line work, and cell tower installations within Town of Pima limits. Applicants must separately coordinate utility interconnection approval with Graham County Electric (the local rural electric cooperative). Applications are submitted through the Town's iWorq Citizen Portal.

Reviewed 2026-07-07 · Source

Requirements

  • Permit required for solar, electrical, cell tower, and gas work within Town of Pima limits
  • Applicant is responsible for obtaining separate approval with Graham County Electric (the rural electric cooperative) for utility interconnection where applicable
  • Submitted via the Town of Pima iWorq Citizen Portal
  • A completed Building & Sub-Contractors Information form and Plot Plan may be required depending on project scope

Required documents

  • RequiredSolar/Electrical/Gas/Cell Tower Permit ApplicationSubmitted via the Town of Pima iWorq Citizen Portal (pimaaz23.portal.iworq.net/portalhome/pimaaz23)
  • OptionalGraham County Electric ApprovalSeparate utility-interconnection approval from Graham County Electric cooperative, obtained by the applicant outside the Town's own permit process

Fee schedule

Fee typeAmountNotes
Solar/Electrical/Gas/Cell Tower Permit FeeNot publishedNo fee amount is shown on the Town's iWorq portal application description or elsewhere on the Town's website as of this review. Contact the Planning & Zoning Administrator (928-322-4860, building@pimatown.az.gov) for current fee amounts.

Mobile/Manufactured Home Installation Permit

Verified

Required for installation of a mobile or manufactured home within Town of Pima limits, whether on private land or elsewhere in town. Covers siting, utility connections, accessory structures on the sales contract, and pressure testing of gas connections. This is the one permit type for which the Town publishes a fixed, verified fee.

Verified 2026-07-07 · Source

Requirements

  • Permit required before installing a mobile/manufactured home within Town of Pima limits
  • If installed on private land, a detailed map showing the nearest major intersection and exact lot location must accompany the application
  • Unit identification required: manufacturer, year, model, dimensions, serial number, HUD label number, date unit entered the state
  • Installer must be listed with license number and license classification
  • Setbacks: minimum 20 ft from the front property line to the closest structure (porch, awning, carport, etc.); minimum 10 ft from the side property line; no fixed minimum from the rear property line (10 ft recommended); double-frontage/corner lots require 20 ft from both front and side property lines
  • A plot plan must be drawn showing property/lot dimensions, home location, north direction, and accessory structures (storage units, corrals, barns, etc.)
  • Inside and outside gas pressure tests are required (outside test per Uniform Plumbing Code 1979 Edition, Section 1206-2), certified by signature as conforming to Arizona Mobile and Manufactured Housing Standards Board rules (1980 Revision)
  • Fee includes the permit and 3 field inspections (2 utility, 1 accessory); additional inspections are billed separately

Required documents

  • RequiredApplication for Mobile/Manufactured Home Installation PermitTown of Pima Planning & Zoning Department paper application; includes plot-plan and pressure-test sections
  • RequiredPlot PlanDrawn plot plan showing lot dimensions, home location, setbacks, north direction, and accessory structures
  • OptionalSite/Location Map (private land only)Map showing the nearest major intersection and exact lot location, required only when the home is installed on private land

Fee schedule

Fee typeAmountNotes
Mobile/Manufactured Home Installation Permit$800Town of Pima Application for Mobile/Manufactured Home Installation Permit — flat fee includes the permit itself plus 3 field inspections (2 utility, 1 accessory)
Additional Inspection (beyond the 3 included)$150 per inspectionTown of Pima Application for Mobile/Manufactured Home Installation Permit

Sign / Fence Permit

Required for installation of signs or fences within Town of Pima limits. Applications are submitted through the Town's iWorq Citizen Portal under a dedicated Sign/Fence application category.

Reviewed 2026-07-07 · Source

Requirements

  • Permit required for sign or fence installation within Town of Pima limits
  • Submitted via the Town of Pima iWorq Citizen Portal under the Sign/Fence application link
  • Specific height, setback, and material standards for signs and fences are not published in any locatable Town document as of this review — confirm with Planning & Zoning before installation

Required documents

  • RequiredSign/Fence Permit ApplicationSubmitted via the Town of Pima iWorq Citizen Portal (pimaaz23.portal.iworq.net/portalhome/pimaaz23)

Fee schedule

Fee typeAmountNotes
Sign/Fence Permit FeeNot publishedNo fee amount is shown on the Town's iWorq portal application description or elsewhere on the Town's website as of this review. Contact the Planning & Zoning Administrator (928-322-4860, building@pimatown.az.gov) for current fee amounts.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pima building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-16) →View current record →All versions →

Permalink: /arizona/graham-county/pima/as-of/2026-07-07/

Snapshot date: 2026-07-07

Commit: 4bca8d1

Reproducible from PermitBase’s version-controlled dataset, commit 4bca8d1.