Skip to main content
PermitBase

Camp Verde building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Camp Verde, Arizona.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
473 S. Main Street, Suite 108, Camp Verde, AZ 86322
Phone
928-554-0050
Office hours
Monday - Thursday, 7:00 a.m. - 5:00 p.m. (closed Fridays). Applications, plans, and checklists are submitted through the GovWell online One-Stop Permitting Portal (app.govwelltech.com/camp-verde); Chief Building Official is Roxanne Jasman (928-554-0061); Building Inspectors are Josh Presmyk and Jon Rivero (928-554-0050 / 928-554-0065).

Inspection guide

See how inspections work in Camp Verde — sequence, scheduling & re-inspection fees.

Codes adopted

Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.

  • Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Camp Verde's Community Development Department (Development Services) independently adopts and administers its own construction codes; it does not defer permitting to Yavapai County. Source: Town of Camp Verde Development Permits page (campverde.az.gov/departments/community_development/permits.php).
  • 2024 International Building Code (IBC), with Appendices C, I, J, K, and P, adopted by reference by the Town of Camp Verde via Ordinance 2026-A512, effective February 26, 2026, with Town amendments. This ordinance superseded the prior 2018-edition ICC code set adopted under Ordinance 2019-A440 (01-23-2019). Source: Town of Camp Verde Ordinance 2026-A512 (Scrivenor's Error corrected version).
  • 2024 International Residential Code (IRC) for One- and Two-Family Dwellings, with Appendices BB, BD, BF, BJ, BM, BN, CA, and CB, adopted by reference (Ordinance 2026-A512, effective 02-26-2026), with Town amendments including reduced wind-speed design criteria and a new tiny-house appendix. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).
  • 2018 International Energy Conservation Code (IECC) — NOTE: the Town explicitly declined to advance to the 2024 IECC edition in the 2026 code update; Chief Building Official Roxanne Jasman stated 'the studies don't show that the cost of construction and different design aspects outweigh the benefits,' and no neighboring jurisdiction had adopted the 2024 IECC at the time of the Town's decision. Source: JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026); Town of Camp Verde Ordinance 2026-A512.
  • 2024 International Existing Building Code (IEBC), adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.
  • 2024 International Fire Code (IFC), with Appendices B through O, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) as the Town's uniform fire code. Source: Town of Camp Verde Ordinance 2026-A512.
  • 2024 International Fuel Gas Code (IFGC), with Appendix A, B, Category 1 Appliances and Appliances Listed for Use with Type B Vents, and Appendix C, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.
  • 2024 International Mechanical Code (IMC), with Appendix A, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.
  • 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference (Ordinance 2026-A512, effective 02-26-2026); electrical code cycle is one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag. A whole-house surge protector requirement was newly added for the 2024-cycle NEC adoption. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).
  • 2024 International Plumbing Code (IPC), with Appendix C and E, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.
  • 2024 International Swimming Pool and Spa Code, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) — a newly-adopted standalone code not present in the Town's prior (2018-cycle) code set. Source: Town of Camp Verde Ordinance 2026-A512.
  • Manufactured homes, mobile homes, and factory-built buildings: the Town of Camp Verde has an Intergovernmental Agreement (IGA) with the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH) to enforce installation standards for manufactured and factory-built buildings within the Town, pursuant to Arizona Administrative Code (A.A.C.) §R4-34-501 and §R4-34-801; OMH-established fees for manufactured home/factory-built set permits are adopted by the Town through this IGA. Source: Town of Camp Verde FY26 Fee Schedule, Community Development section (Mobile/Manufactured Housing Permits, effective 7/1/25).

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
1units

1 buildings · $1.5M valuation

Trailing 12 months
18units

10 of 12 months reported · #58 in Arizona coverage by units

Year to date (2026 YTD through 2026-05)
6units

6 buildings · $4.4M valuation

5 month(s) reported to Census

Full year 2025
30units

28 buildings · $9.3M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity

Tips & gotchas

  • Arizona has no statewide mandatory building code — Camp Verde independently adopts and administers its own construction codes through its Community Development Department (Development Services), distinct from Yavapai County.
  • Camp Verde adopted an entirely new 2024-cycle International Code set (IBC, IRC, IEBC, IFC, IFGC, IMC, plus 2023 NEC and a newly-adopted International Swimming Pool and Spa Code) via Ordinance 2026-A512, effective February 26, 2026 — replacing the prior 2018-cycle codes adopted under Ordinance 2019-A440. The energy code was deliberately NOT advanced and remains the 2018 IECC, per Chief Building Official Roxanne Jasman's cost-benefit rationale at the Town Council's January 2026 work session.
  • Notable 2026 local amendments: wind design load reduced from 115 mph to 100 mph (Risk Category I); mandatory whole-house surge protectors; mandatory carbon monoxide detection for all occupancies with CO-producing appliances; a new tiny-house appendix to support affordable housing.
  • Camp Verde publishes an unusually complete, genuinely governing set of review-timeline figures: a Building Division 'Flow Chart – Permit Application Process' gives specific business-day ranges by permit category (OTC/Demo 0-3, Solar/BESS 7-21, Non-Habitable Accessory Structures 7-14, Small Accessory Structures 14-35, Single-Family Home 21-35, Commercial 35-44, plus a 0-5 business-day initial completeness check and 1-2 business-day issuance after approval) — this is a rare and valuable degree of specificity for a small Arizona town and was the primary source for reviewTimelineDays in this file, cross-checked against the Development Permits page's broader week-based estimates.
  • One confirmed gap: no published review-timeline figure exists anywhere (permits page, FY26 fee schedule, or Building Division flow chart) specifically for Manufactured/Modular/Factory-Built home installation permits — the flow chart's categories do not include a distinct line for this permit type, despite covering every other major category. This is a genuine, exhaustively-checked gap, not an assumption.
  • Manufactured/factory-built home base installation fees are NOT Town-set — they follow the Arizona Office of Manufactured Housing (OMH) fee schedule directly per an intergovernmental agreement (A.A.C. §R4-34-501, §R4-34-801); only the Town's $180 plan review and $190 zoning clearance fees are locally set for this permit type.
  • Fee schedule note: the FY26 Fee Schedule is effective 7/1/25, and the Development Permits page separately notes 'New fees effective 7/1/26' with an updated schedule to be posted — confirm whether a newer FY27 fee schedule has since superseded the dollar figures cited here for any time-sensitive fee calculation.
  • All building permit deposits are explicitly NON-REFUNDABLE once collected, and Building Plan Review Fees become non-refundable once plan review has begun — this is a stricter refund posture than some other Arizona jurisdictions in this dataset.
  • Yavapai County is also covered by cottonwood.json, prescott.json, prescott-valley.json, and sedona.json in this dataset — Camp Verde is a sixth, separate town in the same county.

Related guides

Comparable nearby cities

Cottonwood
Both in Yavapai County7 shared permit types~14 mi away
Compare fees →
Clarkdale
Both in Yavapai County7 shared permit types~17 mi away
Compare fees →
Chino Valley
Both in Yavapai County7 shared permit types~33 mi away
Compare fees →