Residential Building Permit (New Single-Family Home) in Camp Verde, Arizona

Required for new one- and two-family dwelling construction in the Town of Camp Verde. Reviewed against the 2024 IRC as adopted and amended by the Town via Ordinance 2026-A512 (effective February 26, 2026). Applications are submitted through the GovWell One-Stop Permitting Portal.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for new single-family and two-family dwelling construction within Camp Verde town limits, following a required Residential Zoning Clearance ($190, includes manufactured/factory-built/modular homes)
  • Plans must comply with the 2024 IRC and Town of Camp Verde amendments, including the reduced 100 mph wind-speed design criteria (Risk Category I) adopted under Ordinance 2026-A512
  • Valuation for new single/multi-family residences (excluding mobile/manufactured homes) is the applicant's valuation or the ICC Building Valuation Data (BVD) Table figure, whichever is greater
  • A deposit equal to the Building Plan Review Fee is due at submittal ($250 of the deposit is non-refundable if the application is cancelled/withdrawn before plan review begins)
  • Submittal via the GovWell One-Stop Online Permitting Portal (app.govwelltech.com/camp-verde)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationTown of Camp Verde FY26 Fee Schedule, Community Development section, Building Permit Fees (Total Valuation table), effective 7/1/25
$47.00 ($1-$500); $47.00 + $4.25 per additional $100 to $2,000; $108.00 + $16.50 per additional $1,000 to $25,000; $476.00 + $12.50 per additional $1,000 to $50,000; $784.00 + $9.25 per additional $1,000 to $100,000; $1,217.00 + $7.25 per additional $1,000 to $500,000; $3,997.00 + $6.25 per additional $1,000 to $1,000,000; $6,982.00 + $5.25 per additional $1,000 above $1,000,000
Building Plan Review Fee (First Floorplan Review)Town of Camp Verde FY26 Fee Schedule, Other Building Fees; due at submittal as part of the required deposit
65% of the calculated Building Permit Fee
Master Building Plan Review Fee (Each additional floorplan review under same approved plan)Town of Camp Verde FY26 Fee Schedule, Other Building Fees
$180.00
Residential Zoning Clearance (single family, incl. Manufactured/Factory-Built/Modular)Town of Camp Verde FY26 Fee Schedule, Community Development section, Zoning Clearance for Building Permits — prerequisite to the building permit
$190.00
Deposit (New Single/Multi-Family Residence)Town of Camp Verde FY26 Fee Schedule, Deposits for Building Permit Applications; due at submittal, non-refundable
Equal to the Building Plan Review Fee ($250 non-refundable if cancelled/withdrawn before plan review)

Review timeline

Plan reviewCamp Verde’s published plan-review target
21–35 business days

How long did your Residential Building Permit (New Single-Family Home) permit actually take in Camp Verde?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, egress, per 2024 IRC and Town of Camp Verde design criteria

  3. 3

    Rough Electrical/Plumbing/Mechanical

    Prior to wall closure

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; scheduled 48 hours in advance per the Building Division's published process flow chart

See the full Camp Verde inspection guide — scheduling & re-inspection fees →

Tips

  • Per the Town of Camp Verde Community Development Department's published 'Flow Chart – Permit Application Process' (Building Division), a new Single-Family Home plan review is 21-35 business days for the first review, following a 0-5 business-day application-completeness review. This is a verified, governing published figure — not an estimate.
  • The permits page separately advertises a general 'Residential: 2-4 weeks' processing window; the Building Division's own detailed flow chart (21-35 business days for single-family homes specifically) is the more granular and authoritative figure and is used here.
  • If the first plan review is not approved, additional reviews take 7-30 business days each per the published flow chart, repeating until approved.
  • Permit issuance after final plan approval and balance-due payment takes 1-2 business days per the flow chart.
  • A Residential Zoning Clearance must be obtained before a building permit will be issued; the Town's general zoning clearance processing estimate is 2 weeks.

Frequently asked questions

Camp Verde requires a residential building permit (new single-family home) for: Building permit required for new single-family and two-family dwelling construction within Camp Verde town limits, following a required Residential Zoning Clearance ($190, includes manufactured/factory-built/modular homes); Plans must comply with the 2024 IRC and Town of Camp Verde amendments, including the reduced 100 mph wind-speed design criteria (Risk Category I) adopted under Ordinance 2026-A512; Valuation for new single/multi-family residences (excluding mobile/manufactured homes) is the applicant's valuation or the ICC Building Valuation Data (BVD) Table figure, whichever is greater; A deposit equal to the Building Plan Review Fee is due at submittal ($250 of the deposit is non-refundable if the application is cancelled/withdrawn before plan review begins); Submittal via the GovWell One-Stop Online Permitting Portal (app.govwelltech.com/camp-verde). If your project isn't listed, confirm with Town of Camp Verde Community Development Department — Development Services (Building Division) at 928-554-0050 before starting work.

In Camp Verde, the published Building Permit Fee — Based on Valuation is: $47.00 ($1-$500); $47.00 + $4.25 per additional $100 to $2,000; $108.00 + $16.50 per additional $1,000 to $25,000; $476.00 + $12.50 per additional $1,000 to $50,000; $784.00 + $9.25 per additional $1,000 to $100,000; $1,217.00 + $7.25 per additional $1,000 to $500,000; $3,997.00 + $6.25 per additional $1,000 to $1,000,000; $6,982.00 + $5.25 per additional $1,000 above $1,000,000. Additional published fees: Building Plan Review Fee (First Floorplan Review) — 65% of the calculated Building Permit Fee; Master Building Plan Review Fee (Each additional floorplan review under same approved plan) — $180.00; Residential Zoning Clearance (single family, incl. Manufactured/Factory-Built/Modular) — $190.00; Deposit (New Single/Multi-Family Residence) — Equal to the Building Plan Review Fee ($250 non-refundable if cancelled/withdrawn before plan review). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Per the Town of Camp Verde Community Development Department's published Building Division process flow chart, a Single-Family Home plan review takes 21-35 business days for the first review (after a 0-5 business-day completeness check), with any additional required reviews taking 7-30 business days each until approved.

You'll need: Building Permit Application; Site/Plot Plan; Construction Drawings and Structural Calculations. Depending on your project, Camp Verde may also ask for: Geotechnical/Soils Report. See the required-documents checklist on this page for details on each.

Camp Verde requires 4 inspection(s) for a residential building permit (new single-family home), in order: Foundation/Footing, Framing, Rough Electrical/Plumbing/Mechanical, Final / Certificate of Occupancy. Schedule each through Town of Camp Verde Community Development Department — Development Services (Building Division) (928-554-0050).

Apply through Town of Camp Verde Community Development Department — Development Services (Building Division) at 473 S. Main Street, Suite 108, Camp Verde, AZ 86322. Phone: 928-554-0050, email: BuildingPermitGroup@campverde.az.gov. Office hours: Monday - Thursday, 7:00 a.m. - 5:00 p.m. (closed Fridays). Applications, plans, and checklists are submitted through the GovWell online One-Stop Permitting Portal (app.govwelltech.com/camp-verde); Chief Building Official is Roxanne Jasman (928-554-0061); Building Inspectors are Josh Presmyk and Jon Rivero (928-554-0050 / 928-554-0065).. Official information: https://www.campverde.az.gov/departments/community_development/permits.php.

Camp Verde, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Camp Verde's Community Development Department (Development Services) independently adopts and administers its own construction codes; it does not defer permitting to Yavapai County. Source: Town of Camp Verde Development Permits page (campverde.az.gov/departments/community_development/permits.php).; 2024 International Building Code (IBC), with Appendices C, I, J, K, and P, adopted by reference by the Town of Camp Verde via Ordinance 2026-A512, effective February 26, 2026, with Town amendments. This ordinance superseded the prior 2018-edition ICC code set adopted under Ordinance 2019-A440 (01-23-2019). Source: Town of Camp Verde Ordinance 2026-A512 (Scrivenor's Error corrected version).; 2024 International Residential Code (IRC) for One- and Two-Family Dwellings, with Appendices BB, BD, BF, BJ, BM, BN, CA, and CB, adopted by reference (Ordinance 2026-A512, effective 02-26-2026), with Town amendments including reduced wind-speed design criteria and a new tiny-house appendix. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).; 2018 International Energy Conservation Code (IECC) — NOTE: the Town explicitly declined to advance to the 2024 IECC edition in the 2026 code update; Chief Building Official Roxanne Jasman stated 'the studies don't show that the cost of construction and different design aspects outweigh the benefits,' and no neighboring jurisdiction had adopted the 2024 IECC at the time of the Town's decision. Source: JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026); Town of Camp Verde Ordinance 2026-A512.; 2024 International Existing Building Code (IEBC), adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Fire Code (IFC), with Appendices B through O, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) as the Town's uniform fire code. Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Fuel Gas Code (IFGC), with Appendix A, B, Category 1 Appliances and Appliances Listed for Use with Type B Vents, and Appendix C, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Mechanical Code (IMC), with Appendix A, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference (Ordinance 2026-A512, effective 02-26-2026); electrical code cycle is one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag. A whole-house surge protector requirement was newly added for the 2024-cycle NEC adoption. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).; 2024 International Plumbing Code (IPC), with Appendix C and E, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Swimming Pool and Spa Code, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) — a newly-adopted standalone code not present in the Town's prior (2018-cycle) code set. Source: Town of Camp Verde Ordinance 2026-A512.; Manufactured homes, mobile homes, and factory-built buildings: the Town of Camp Verde has an Intergovernmental Agreement (IGA) with the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH) to enforce installation standards for manufactured and factory-built buildings within the Town, pursuant to Arizona Administrative Code (A.A.C.) §R4-34-501 and §R4-34-801; OMH-established fees for manufactured home/factory-built set permits are adopted by the Town through this IGA. Source: Town of Camp Verde FY26 Fee Schedule, Community Development section (Mobile/Manufactured Housing Permits, effective 7/1/25).. Local amendments apply — see the Camp Verde overview page for the full list.

The 2024 IRC and 2024 IBC (for non-residential portions), as adopted and amended by the Town of Camp Verde under Ordinance 2026-A512, effective February 26, 2026. The energy code remains the 2018 IECC — the Town explicitly declined to adopt the 2024 IECC edition.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.