Skip to main content
PermitBase

Manufactured / Modular / Factory-Built Home Installation Permit in Camp Verde, Arizona

Required for placement of Factory Built Buildings, Manufactured Homes, and Mobile Homes within the incorporated area of the Town of Camp Verde. The Town enforces installation standards for these structures under an Intergovernmental Agreement (IGA) with the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH).

Verified 2026-07-06 · Source

When you need this permit

  • Installation permit required in the incorporated Town of Camp Verde for placement of Factory Built Buildings, Manufactured Homes, and Mobile Homes
  • Enforced under an Intergovernmental Agreement (IGA) between the Town and the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH), pursuant to A.A.C. §R4-34-501 and §R4-34-801
  • A Residential Zoning Clearance is required (single-family dwelling category, $190, which explicitly includes Manufactured and Factory-Built/Modular Buildings)
  • Manufactured Housing Skirting billed separately per linear foot
  • Includes three (3) inspections in the base OMH-schedule fee for the home set/factory-built installation

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential Manufactured Home Set (includes 3 inspections)Town of Camp Verde FY26 Fee Schedule, Community Development section, Mobile/Manufactured Housing Permits — fee set by AZ OMH and adopted by the Town via IGA per A.A.C. §R4-34-501/§R4-34-801, not independently set by the Town
Per Arizona Office of Manufactured Housing (OMH) Fee Schedule
Residential Manufactured Home — Plan ReviewTown of Camp Verde FY26 Fee Schedule, Community Development section
$180.00
Residential/Commercial Factory Built/Modular Building (includes 3 inspections)Town of Camp Verde FY26 Fee Schedule, Community Development section
Per Arizona OMH Fee Schedule
Residential/Commercial Factory Built/Modular — Plan ReviewTown of Camp Verde FY26 Fee Schedule, Community Development section
$180.00
Manufactured Housing Skirting (no retaining/surcharge)Town of Camp Verde FY26 Fee Schedule, Community Development section
$10.00 per every 10 linear feet
Residential Zoning Clearance (single family dwelling, incl. Manufactured/Factory-Built)Town of Camp Verde FY26 Fee Schedule, Community Development section, Zoning Clearance for Building Permits
$190.00

Review timeline

Plan reviewCamp Verde’s published plan-review target
Up to 7 business days

How long did your Manufactured / Modular / Factory-Built Home Installation Permit permit actually take in Camp Verde?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Set / Foundation

    Foundation and blocking/pier placement verification

  2. 2

    Tie-Down

    Anchoring and tie-down system per OMH/manufacturer standards

  3. 3

    Final

    Utility connections and site completion; three inspections total are included in the base OMH fee

See the full Camp Verde inspection guide — scheduling & re-inspection fees →

Tips

  • The base 'Residential Manufactured Home Set' and 'Factory Built/Modular Building' fees are NOT independently set by the Town — they follow the Arizona Office of Manufactured Housing (OMH) fee schedule directly, per the Town-OMH intergovernmental agreement (A.A.C. §R4-34-501, §R4-34-801). Only the $180 Plan Review fee and the $190 Zoning Clearance fee are Town-set line items for this permit type.
  • As of July 2026, no permit-specific plan-review turnaround (business-day figure) for manufactured/modular home installations specifically was found published on the Town's site, fee schedule, or Building Division flow chart (which covers Single-Family Home, Solar/BESS, Accessory Structures, Commercial, and OTC/Demo categories, but does not list a distinct Manufactured Home line) — this is a confirmed gap after checking the permits page, FY26 fee schedule, and flow chart PDF. Call the Community Development Department at (928) 554-0050 or the OMH directly for a current estimate.
  • Manufactured homes brought into the Town must be rated for the area to meet current energy code provisions and are subject to the Town's zoning and installation-standards enforcement under the OMH intergovernmental agreement.

Frequently asked questions

Camp Verde requires a manufactured / modular / factory-built home installation permit for: Installation permit required in the incorporated Town of Camp Verde for placement of Factory Built Buildings, Manufactured Homes, and Mobile Homes; Enforced under an Intergovernmental Agreement (IGA) between the Town and the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH), pursuant to A.A.C. §R4-34-501 and §R4-34-801; A Residential Zoning Clearance is required (single-family dwelling category, $190, which explicitly includes Manufactured and Factory-Built/Modular Buildings); Manufactured Housing Skirting billed separately per linear foot; Includes three (3) inspections in the base OMH-schedule fee for the home set/factory-built installation. If your project isn't listed, confirm with Town of Camp Verde Community Development Department — Development Services (Building Division) at 928-554-0050 before starting work.

In Camp Verde, the published Residential Manufactured Home Set (includes 3 inspections) is: Per Arizona Office of Manufactured Housing (OMH) Fee Schedule. Additional published fees: Residential Manufactured Home — Plan Review — $180.00; Residential/Commercial Factory Built/Modular Building (includes 3 inspections) — Per Arizona OMH Fee Schedule; Residential/Commercial Factory Built/Modular — Plan Review — $180.00; Manufactured Housing Skirting (no retaining/surcharge) — $10.00 per every 10 linear feet; Residential Zoning Clearance (single family dwelling, incl. Manufactured/Factory-Built) — $190.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

As of July 2026, the Town does not publish a specific business-day review timeframe for manufactured/modular home installation permits on its permits page, FY26 fee schedule, or Building Division process flow chart (which covers other permit categories but omits this one). Call the Community Development Department at (928) 554-0050 for a current estimate.

You'll need: Manufactured/Modular Home Installation Permit Application; Floor Plans and Foundation Details; OMH Insignia / Installation Documentation. See the required-documents checklist on this page for details on each.

Camp Verde requires 3 inspection(s) for a manufactured / modular / factory-built home installation permit, in order: Set / Foundation, Tie-Down, Final. Schedule each through Town of Camp Verde Community Development Department — Development Services (Building Division) (928-554-0050).

Apply through Town of Camp Verde Community Development Department — Development Services (Building Division) at 473 S. Main Street, Suite 108, Camp Verde, AZ 86322. Phone: 928-554-0050, email: BuildingPermitGroup@campverde.az.gov. Office hours: Monday - Thursday, 7:00 a.m. - 5:00 p.m. (closed Fridays). Applications, plans, and checklists are submitted through the GovWell online One-Stop Permitting Portal (app.govwelltech.com/camp-verde); Chief Building Official is Roxanne Jasman (928-554-0061); Building Inspectors are Josh Presmyk and Jon Rivero (928-554-0050 / 928-554-0065).. Official information: https://www.campverde.az.gov/departments/community_development/permits.php.

Camp Verde, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Camp Verde's Community Development Department (Development Services) independently adopts and administers its own construction codes; it does not defer permitting to Yavapai County. Source: Town of Camp Verde Development Permits page (campverde.az.gov/departments/community_development/permits.php).; 2024 International Building Code (IBC), with Appendices C, I, J, K, and P, adopted by reference by the Town of Camp Verde via Ordinance 2026-A512, effective February 26, 2026, with Town amendments. This ordinance superseded the prior 2018-edition ICC code set adopted under Ordinance 2019-A440 (01-23-2019). Source: Town of Camp Verde Ordinance 2026-A512 (Scrivenor's Error corrected version).; 2024 International Residential Code (IRC) for One- and Two-Family Dwellings, with Appendices BB, BD, BF, BJ, BM, BN, CA, and CB, adopted by reference (Ordinance 2026-A512, effective 02-26-2026), with Town amendments including reduced wind-speed design criteria and a new tiny-house appendix. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).; 2018 International Energy Conservation Code (IECC) — NOTE: the Town explicitly declined to advance to the 2024 IECC edition in the 2026 code update; Chief Building Official Roxanne Jasman stated 'the studies don't show that the cost of construction and different design aspects outweigh the benefits,' and no neighboring jurisdiction had adopted the 2024 IECC at the time of the Town's decision. Source: JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026); Town of Camp Verde Ordinance 2026-A512.; 2024 International Existing Building Code (IEBC), adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Fire Code (IFC), with Appendices B through O, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) as the Town's uniform fire code. Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Fuel Gas Code (IFGC), with Appendix A, B, Category 1 Appliances and Appliances Listed for Use with Type B Vents, and Appendix C, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Mechanical Code (IMC), with Appendix A, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference (Ordinance 2026-A512, effective 02-26-2026); electrical code cycle is one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag. A whole-house surge protector requirement was newly added for the 2024-cycle NEC adoption. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).; 2024 International Plumbing Code (IPC), with Appendix C and E, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Swimming Pool and Spa Code, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) — a newly-adopted standalone code not present in the Town's prior (2018-cycle) code set. Source: Town of Camp Verde Ordinance 2026-A512.; Manufactured homes, mobile homes, and factory-built buildings: the Town of Camp Verde has an Intergovernmental Agreement (IGA) with the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH) to enforce installation standards for manufactured and factory-built buildings within the Town, pursuant to Arizona Administrative Code (A.A.C.) §R4-34-501 and §R4-34-801; OMH-established fees for manufactured home/factory-built set permits are adopted by the Town through this IGA. Source: Town of Camp Verde FY26 Fee Schedule, Community Development section (Mobile/Manufactured Housing Permits, effective 7/1/25).. Local amendments apply — see the Camp Verde overview page for the full list.

Only partially. The base 'Manufactured Home Set' and 'Factory Built/Modular Building' installation fees follow the Arizona Office of Manufactured Housing (OMH) fee schedule directly, per the Town's intergovernmental agreement with OMH (A.A.C. §R4-34-501, §R4-34-801). The Town separately charges its own $180 Plan Review fee and $190 Residential Zoning Clearance fee on top of the OMH-set base fee.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.