Commercial Building Permit (New Building / Tenant Improvement) — Camp Verde, Arizona · Requirements sheet
Reviewed 2026-08-16 · Source: https://www.campverde.az.gov/departments/community_development/permits.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit (New Building / Tenant Improvement) in Camp Verde, Arizona
Required for new commercial buildings, commercial accessory structures, tenant improvements, and multi-family buildings in the Town of Camp Verde. Reviewed against the 2024 IBC as adopted and amended by the Town via Ordinance 2026-A512 (effective February 26, 2026).
Reviewed 2026-08-16 · Source
When you need this permit
- Building permit required for new commercial construction, commercial accessory structures, tenant improvements, and multi-family buildings within Camp Verde town limits
- Requires a Commercial Zoning Clearance before permit issuance: $325 for new commercial (including Factory-Built/Modular) construction, or $110 (up to 2 structures, plus $30 each additional) for commercial remodel/accessory structures
- New commercial buildings and commercial accessory structures (new) are valued at the applicant's valuation or the ICC Building Valuation Data (BVD) Table, whichever is greater
- Commercial alteration/remodel of an existing structure (tenant improvements) is valued based on the bid price provided by a licensed commercial contractor, plus applicable plan review fees
- Commercial project deposits equal the sum of Building Plan Review, Engineer Plan Review, Fire Plan Review, and Sanitary Plan Review fees, plus the Zoning Clearance fee
- Contact the Community Development Department at (928) 554-0050 regarding whether a proposed commercial project may qualify for a Development Standards Review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all eight Total Valuation tiers compared individually (rows 312-319) and found identical. Show full citationHide
UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): all eight Total Valuation tiers compared individually (rows 312-319) and found identical. Commercial valuation itself is set by row 394, "Commercial (New Building) — Applicant's Valuation OR ICC Building Valuation Data Table, Whichever Is Greater", also unchanged.CHANGED, and the two relevant rows of the adopted FY2026-27 workbook are quoted verbatim so the reader can see exactly what the document says. Show full citationHide
CHANGED, and the two relevant rows of the adopted FY2026-27 workbook are quoted verbatim so the reader can see exactly what the document says. Row 236: 'Technical Review Committee Meetings (TRCM)' — 2025-26 column '$500.00 plus Fire Marshal Review Fee'; 2026-27 column 'TRCMs are now taking the place of Development Standard Reviews; recommending flat fee for the meeting and complete review.' Row 237: 'Development Standards Review - Commercial/Industrial' — 2025-26 column '$2,500 plus $0.10 sq. ft. over 5000 sq. ft. ($15k max) plus Fire Marshal Review Fee'; 2026-27 column 'See note above.' (Row 238, Development Standards Review – Multifamily, RV, Lodging, is annotated identically.) On the face of the adopted schedule the Development Standards Review is superseded by the flat $500.00 TRCM fee, which the annotation says covers both the meeting and the complete review. What the workbook does NOT do is print a replacement rate on the Development Standards Review row itself — it cross-references instead — so this reading, while the plain one, is an interpretation of an annotation rather than a directly published figure. That single unresolved row is why this permit type is marked partial.UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Commercial Projects' deposit builds from five stacked rows (339-344): 'Equal To Building Plan Review Fees' + 'Plus… Show full citationHide
UNCHANGED in the FY2026-27 schedule (Resolution 2026-1217, effective 7/1/2026): 'Commercial Projects' deposit builds from five stacked rows (339-344): 'Equal To Building Plan Review Fees' + 'Plus Engineer Plan Review Fees' + 'Plus Fire Plan Review Fees' + 'Plus Sanitary Plan Review Fees' + 'Plus Zoning Clearance Fees'. No FY2026-27 change recorded against any of them. Due at submittal, non-refundable.Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing and connections per 2024 IBC and Town design criteria
- 3
Rough Electrical/Plumbing/Mechanical/Fire
Prior to wall closure, including Fire Marshal-required rough inspections where applicable
- 4
Final / Certificate of Occupancy
All work complete per approved plans; scheduled 48 hours in advance
See the full Camp Verde inspection guide — scheduling & re-inspection fees →
Tips
- Per the Town of Camp Verde Community Development Department's published Building Division process flow chart, Commercial Projects are reviewed in 35-44 business days for the first review — the longest track of any permit category, consistent with the general permits page's broader 'Commercial: 4-8 weeks' estimate.
- Additional reviews (if the first is not approved) take 7-30 business days each per the flow chart, same as other permit categories.
- Commercial tenant improvement valuation is based on the licensed contractor's bid price rather than the ICC valuation table used for new construction — get a firm bid before applying for the most accurate fee estimate. Contractor
- A Fire Marshal Review Fee is added on top of many commercial fee categories (Development Standards Review, Use Permits, etc.) — budget for this as a separate line item not captured in the base Building Permit Fee table.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-08-16.
Fee schedules
Applications & forms
Online permit portal
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Camp Verde.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Camp Verde's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Camp Verde yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Camp Verde lands. Privacy.
Other permits in Camp Verde
Commercial Building Permit (New Building / Tenant Improvement) in other cities
Compare commercial building permit (new building / tenant improvement) fees across Arizona →
Look up this fee in a different city →
Now live
Build your Camp Verde project checklist
Describe your project once and get every permit, document, and fee it triggers in Camp Verde — in one checklist. Free, for any city and any number of projects.
Get started →