Skip to main content
PermitBase

Residential Addition / Remodel / Accessory Structure Permit in Camp Verde, Arizona

Required for room additions, remodels, and non-habitable accessory structures on existing one- and two-family dwellings in the Town of Camp Verde, reviewed against the 2024 IRC as adopted and amended (Ordinance 2026-A512, effective February 26, 2026).

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for room additions, structural remodels, and detached/attached accessory structures over the Town's zoning-clearance-only threshold (residential zoning clearances alone cover structures under 200 sq ft and fences under 6 ft)
  • Requires a Residential Remodel/Accessory Structure Zoning Clearance ($90 for up to 2 structures, plus $30 per additional structure) before the building permit is issued
  • Valuation for accessory buildings/structures and alterations/remodels of existing structures is the applicant's valuation or the calculated valuation using the itemized per-square-foot values in the FY26 Fee Schedule (barn, shed, carport, gazebo, deck, enclosed porch, etc.), whichever is greater
  • Where no additional floor area or roof coverage is created (e.g., converting a patio/garage to habitable space), valuation is the difference in valuation between the two occupancies plus utilities
  • Plans must comply with Town of Camp Verde Design Criteria (100 mph wind, Risk Category I, per Ordinance 2026-A512)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Detached Residential Accessory Structures (per sq ft, by type)Town of Camp Verde FY26 Fee Schedule, Valuation Data — Detached Residential Accessory Buildings/Structures
Barn $25.00; Shade/Mare Motel $30.00; Greenhouse $21.00; Storage Shed (over 200 sq ft) $25.00; Carport $19.00; Gazebo/Ramada $32.00; Covered/Open Elevated Deck $30.00; Enclosed Porch (habitable) $100.00; Stairs $14.00
Attached Residential Accessory Structures (per sq ft, by type)Town of Camp Verde FY26 Fee Schedule, Valuation Data — Attached Residential Accessory Buildings/Structures
Greenhouse $21.00; Storage Shed $25.00; Carport $19.00; Balcony $25.00; Covered Patio at Grade $25.00; Covered/Open Elevated Deck $30.00; Screened Porch $10.00; Enclosed Porch (habitable) $80.00; Pre-Fab Canvas/Metal Awning $8.00; Stairs $14.00
Residential Alteration/Remodel (per sq ft, by scope)Town of Camp Verde FY26 Fee Schedule, Valuation Data — Residential Alteration/Remodel
Enclose Exterior Wall Opening $20.00; Add/Remove Interior Partition $30.00; Install Window/Sliding Glass Door $12.00; Install Exterior Siding $9.00; Plaster/Stucco (no structural change) $9.00; Add Stone/Brick Veneer $18.00
Residential Remodel / Accessory Structure Zoning ClearanceTown of Camp Verde FY26 Fee Schedule, Zoning Clearance for Building Permits
$90.00 (up to 2 structures) + $30.00 per additional structure
Building Plan Review FeeTown of Camp Verde FY26 Fee Schedule, Other Building Fees
65% of the calculated Building Permit Fee

Review timeline

Plan reviewCamp Verde’s published plan-review target
7–14 business days

How long did your Residential Addition / Remodel / Accessory Structure Permit permit actually take in Camp Verde?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Required before concrete pour for additions/accessory structures with foundations

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

See the full Camp Verde inspection guide — scheduling & re-inspection fees →

Tips

  • Per the Town's published Building Division process flow chart, Non-Habitable Accessory Structures are reviewed in 7-14 business days for the first review, while structures classified 'Small Accessory Structures' run 14-35 business days — confirm with Development Services which classification applies to your specific project scope, since the flow chart lists both categories without a bright-line size threshold.
  • A one-story, grade-level, detached accessory structure up to 200 sq ft may only need a Residential Zoning Clearance (no building permit) — verify with Development Services (928-554-0050) whether your specific structure and its height qualify for the zoning-clearance-only track versus requiring a full building permit.
  • Because most remodel/accessory fees are calculated per square foot from itemized valuation tables rather than a flat rate, get exact project dimensions before applying for the most accurate fee estimate.

Frequently asked questions

Yes, for most additions and accessory structures exceeding the Town's minor zoning-clearance-only thresholds (structures over roughly 200 sq ft or over 6-foot fences). A Residential Remodel/Accessory Structure Zoning Clearance ($90 for up to 2 structures) is required before the building permit, and valuation is calculated per square foot from the FY26 Fee Schedule's itemized accessory-structure tables.

In Camp Verde, the published Detached Residential Accessory Structures (per sq ft, by type) is: Barn $25.00; Shade/Mare Motel $30.00; Greenhouse $21.00; Storage Shed (over 200 sq ft) $25.00; Carport $19.00; Gazebo/Ramada $32.00; Covered/Open Elevated Deck $30.00; Enclosed Porch (habitable) $100.00; Stairs $14.00. Additional published fees: Attached Residential Accessory Structures (per sq ft, by type) — Greenhouse $21.00; Storage Shed $25.00; Carport $19.00; Balcony $25.00; Covered Patio at Grade $25.00; Covered/Open Elevated Deck $30.00; Screened Porch $10.00; Enclosed Porch (habitable) $80.00; Pre-Fab Canvas/Metal Awning $8.00; Stairs $14.00; Residential Alteration/Remodel (per sq ft, by scope) — Enclose Exterior Wall Opening $20.00; Add/Remove Interior Partition $30.00; Install Window/Sliding Glass Door $12.00; Install Exterior Siding $9.00; Plaster/Stucco (no structural change) $9.00; Add Stone/Brick Veneer $18.00; Residential Remodel / Accessory Structure Zoning Clearance — $90.00 (up to 2 structures) + $30.00 per additional structure; Building Plan Review Fee — 65% of the calculated Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Camp Verde's published plan-review target for a residential addition / remodel / accessory structure permit is 7–14 business days.

You'll need: Building Permit Application; Site/Plot Plan; Construction Drawings. See the required-documents checklist on this page for details on each.

Camp Verde requires 3 inspection(s) for a residential addition / remodel / accessory structure permit, in order: Foundation/Footing, Framing, Final. Schedule each through Town of Camp Verde Community Development Department — Development Services (Building Division) (928-554-0050).

Apply through Town of Camp Verde Community Development Department — Development Services (Building Division) at 473 S. Main Street, Suite 108, Camp Verde, AZ 86322. Phone: 928-554-0050, email: BuildingPermitGroup@campverde.az.gov. Office hours: Monday - Thursday, 7:00 a.m. - 5:00 p.m. (closed Fridays). Applications, plans, and checklists are submitted through the GovWell online One-Stop Permitting Portal (app.govwelltech.com/camp-verde); Chief Building Official is Roxanne Jasman (928-554-0061); Building Inspectors are Josh Presmyk and Jon Rivero (928-554-0050 / 928-554-0065).. Official information: https://www.campverde.az.gov/departments/community_development/permits.php.

Camp Verde, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Camp Verde's Community Development Department (Development Services) independently adopts and administers its own construction codes; it does not defer permitting to Yavapai County. Source: Town of Camp Verde Development Permits page (campverde.az.gov/departments/community_development/permits.php).; 2024 International Building Code (IBC), with Appendices C, I, J, K, and P, adopted by reference by the Town of Camp Verde via Ordinance 2026-A512, effective February 26, 2026, with Town amendments. This ordinance superseded the prior 2018-edition ICC code set adopted under Ordinance 2019-A440 (01-23-2019). Source: Town of Camp Verde Ordinance 2026-A512 (Scrivenor's Error corrected version).; 2024 International Residential Code (IRC) for One- and Two-Family Dwellings, with Appendices BB, BD, BF, BJ, BM, BN, CA, and CB, adopted by reference (Ordinance 2026-A512, effective 02-26-2026), with Town amendments including reduced wind-speed design criteria and a new tiny-house appendix. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).; 2018 International Energy Conservation Code (IECC) — NOTE: the Town explicitly declined to advance to the 2024 IECC edition in the 2026 code update; Chief Building Official Roxanne Jasman stated 'the studies don't show that the cost of construction and different design aspects outweigh the benefits,' and no neighboring jurisdiction had adopted the 2024 IECC at the time of the Town's decision. Source: JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026); Town of Camp Verde Ordinance 2026-A512.; 2024 International Existing Building Code (IEBC), adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Fire Code (IFC), with Appendices B through O, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) as the Town's uniform fire code. Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Fuel Gas Code (IFGC), with Appendix A, B, Category 1 Appliances and Appliances Listed for Use with Type B Vents, and Appendix C, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Mechanical Code (IMC), with Appendix A, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference (Ordinance 2026-A512, effective 02-26-2026); electrical code cycle is one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag. A whole-house surge protector requirement was newly added for the 2024-cycle NEC adoption. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).; 2024 International Plumbing Code (IPC), with Appendix C and E, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Swimming Pool and Spa Code, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) — a newly-adopted standalone code not present in the Town's prior (2018-cycle) code set. Source: Town of Camp Verde Ordinance 2026-A512.; Manufactured homes, mobile homes, and factory-built buildings: the Town of Camp Verde has an Intergovernmental Agreement (IGA) with the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH) to enforce installation standards for manufactured and factory-built buildings within the Town, pursuant to Arizona Administrative Code (A.A.C.) §R4-34-501 and §R4-34-801; OMH-established fees for manufactured home/factory-built set permits are adopted by the Town through this IGA. Source: Town of Camp Verde FY26 Fee Schedule, Community Development section (Mobile/Manufactured Housing Permits, effective 7/1/25).. Local amendments apply — see the Camp Verde overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.