Skip to main content
PermitBase

Residential Addition / Remodel / ADU Permit in Avondale, Arizona

Required for room additions, remodels, alterations, and Accessory Dwelling Units (ADUs) on existing single-family residential property in Avondale. Reviewed against the 2024 IRC as adopted and amended by the City, plus Zoning Ordinance Section 28-33(a) for ADUs specifically.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for room additions, interior alterations/remodels, and detached accessory structures over the 200-sq-ft permit-exempt threshold
  • ADUs additionally require zoning compliance review under Zoning Ordinance Section 28-33(a), performed as an integral part of the building plan submittal review
  • Alterations/Modifications/Remodels (AMR) valuations are calculated using the formula: Project Square Footage × BVD Base Rate × Alteration Multiplier, per the most recent February-published ICC Building Valuation Data Table
  • Detached one-story accessory structures (other than storm shelters) up to 200 sq ft, decks up to 200 sq ft under 30 inches above grade not attached to the dwelling, fences up to 7 ft, and retaining walls up to 4 ft do not require a permit (IRC R105.2 amendment)
  • Soils/geotechnical report required for ADU submittals per the Residential Submittal Checklist
  • Application type 'Accessory Dwelling Unit' is selectable directly on the Accela Citizen Access (ACA) portal building permit application

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on Valuation (Tiers A–H, using AMR valuation formula for alterations)City of Avondale FY2026 Rates and Fees Schedule; City of Avondale Building Code Adoption ordinance, IRC/IBC Section 109.3.1 (AMR valuation formula)
Same Tier A–H schedule as new construction (see Residential Building Permit); AMR valuation = Project SF × BVD Base Rate × Alteration Multiplier
Building Plan Review FeeCity of Avondale FY2026 Rates and Fees Schedule, Resolution 3050-612
65% of the Building Permit Fee
Application Processing FeeCity of Avondale FY2026 Rates and Fees Schedule, Resolution 1045-0725
$102.00

Review timeline

Plan reviewAvondale’s published plan-review target
16–24 business days

How long did your Residential Addition / Remodel / ADU Permit permit actually take in Avondale?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Required before concrete pour for additions/ADUs (SELECTXT 100-125)

  2. 2

    Rough (Framing, Electrical, Plumbing, Mechanical)

    SELECTXT 200-245

  3. 3

    Final Combination

    SELECTXT 640; Certificate of Occupancy required before the ADU may legally be occupied

See the full Avondale inspection guide — scheduling & re-inspection fees →

Tips

  • Per the City's published ADU guide ('Permitting an Accessory Dwelling Unit in Avondale'), construction may only begin once an approved Building Permit (including zoning approval) has been issued, and the ADU may only be occupied after final inspection approval and issuance of a Certificate of Occupancy.
  • Unpermitted ADU work is the current property owner's legal responsibility to correct, even if built by a previous owner; the City's Code Compliance Division will issue a Notice of Violation for unpermitted work discovered on a property.
  • Building Division review timeline (16 business days 1st review, 8 subsequent, per the A.R.S. § 9-835 Development Services Review Timelines doc) applies to addition/remodel/ADU submittals the same as new construction — there is no separate expedited 'Residential Misc.' track published by Avondale (unlike some neighboring cities).

Frequently asked questions

No — one-story detached accessory structures (other than storm shelters) up to 200 sq ft are exempt from a residential building permit under the City's amended IRC R105.2, though zoning/setback requirements may still apply.

In Avondale, the published Building Permit Fee — Based on Valuation (Tiers A–H, using AMR valuation formula for alterations) is: Same Tier A–H schedule as new construction (see Residential Building Permit); AMR valuation = Project SF × BVD Base Rate × Alteration Multiplier. Additional published fees: Building Plan Review Fee — 65% of the Building Permit Fee; Application Processing Fee — $102.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Avondale's published plan-review target for a residential addition / remodel / adu permit is 16–24 business days.

You'll need: Building Permit Application; Residential Submittal Checklist; Site/Plot Plan. See the required-documents checklist on this page for details on each.

Avondale requires 3 inspection(s) for a residential addition / remodel / adu permit, in order: Foundation/Footing, Rough (Framing, Electrical, Plumbing, Mechanical), Final Combination. Schedule each through City of Avondale Development Services Department — Building Services Division (623-333-4000).

Apply through City of Avondale Development Services Department — Building Services Division at 11465 W. Civic Center Drive, Avondale, AZ 85323. Phone: 623-333-4000, email: buildingservices@avondaleaz.gov. Office hours: 7:00 AM – 6:00 PM (Building Services Division, per the City's Building Services Division page); City Hall / Development Services counter hours are Monday–Thursday 7:00 AM – 6:00 PM per the City's Contact Us footer (City Hall operates a compressed 4-day, 10-hour workweek). Applications are submitted electronically via the Avondale Citizen Portal (Accela Citizen Access). Building Official: Benjamin Carr (bcarr@avondaleaz.gov), per the 2025 Arizona Building Officials (AZBO) Directory.. Official information: https://avondaleaz.gov/government/departments/development-services/building-division/.

Avondale, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Avondale independently adopts and administers its own construction codes through its Development Services Department / Building Services Division; it does not defer permitting to Maricopa County. Source: City of Avondale Building Services Division page (avondaleaz.gov/government/departments/development-services/building-division/).; 2024 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Avondale amendments. Effective January 1, 2026 (per the City's 'Current Adopted Building Codes (effective January 1, 2026)' list). Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document ('Building-Code-Adoption-Final.pdf').; 2024 International Residential Code (IRC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document.; 2024 International Existing Building Code (IEBC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with City of Avondale amendments (note: electrical code cycle is one edition behind the 2024 ICC set), effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document (Avondale Amendments to the 2023 National Electrical Code).; 2024 International Mechanical Code (IMC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2024 International Plumbing Code (IPC), adopted by reference with City of Avondale amendments, effective January 1, 2026, including a burial-depth amendment to G2415.12/IFGC 404.12 and added stub-out/push-to-connect-valve provisions (P2605.1.1, P2605.1.2). Source: City of Avondale Building Code Adoption ordinance document.; 2024 International Fuel Gas Code (IFGC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2024 International Energy Conservation Code (IECC), adopted by reference with City of Avondale amendments, effective January 1, 2026 (Manual J design criteria: elevation 1,101 ft, latitude 34°, outdoor summer design dry-bulb 108°F, outdoor winter design dry-bulb 33°F). Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document.; 2024 International Property Maintenance Code (IPMC), adopted by reference, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2024 International Swimming Pool and Spa Code (ISPSC), adopted by reference with City of Avondale amendments (including an amended barrier-height provision requiring a minimum 60-inch/5-foot barrier height, up from the model code's 48 inches), effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document (Avondale Amendments to the 2024 ISPSC, Section 305.2.1); City of Avondale Swimming Pool Requirements handout (rev. 10.26.2023).; All work must be performed by a contractor licensed with the Arizona Registrar of Contractors (ROC), unless the property owner qualifies as an owner-builder under A.R.S. § 32-1121 (Building Permit Application, Standard Conditions and Applicant Certification, rev. 05.06.2026). Source: City of Avondale Building Permit Application.. Local amendments apply — see the Avondale overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.