Skip to main content
PermitBase

Electrical Permit in Avondale, Arizona

Required for electrical installation, alteration, or repair work in Avondale, governed by the 2023 National Electrical Code (NEC) as adopted and amended by the City of Avondale.

Verified 2026-07-06 · Source

When you need this permit

  • Electrical permit required for panel work, service entrance changes, wiring, and other hard-wired electrical work not covered by the code's minor-repair exemptions
  • Governed by the 2023 NEC as adopted by the City of Avondale, including a temporary (through 9/1/2026) exception to GFCI protection for listed HVAC equipment under Section 210.8(F)
  • Exempt work includes: listed cord-and-plug temporary decorative lighting, reinstallation of attachment plug receptacles, replacement of branch-circuit overcurrent devices of the required capacity in the same location, low-voltage (<25V, <50W) wiring, and minor repairs/lamp replacement
  • Apply via the Avondale Citizen Portal (Accela Citizen Access), Application Type 'Residential' or 'Commercial', Purpose of Work 'Electric'

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical PermitCity of Avondale FY2026 Rates and Fees Schedule, Mechanical/Plumbing/Electrical (MPE), Resolution 1045-0725, effective 9/1/2025
$112.00
Application Processing FeeCity of Avondale FY2026 Rates and Fees Schedule, Building Division Fees, Resolution 1045-0725
$102.00

Review timeline

Plan reviewAvondale’s published plan-review target
16–24 business days

How long did your Electrical Permit permit actually take in Avondale?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electric

    SELECTXT code 220 (residential) / 220-235 (commercial: includes Service Entrance Section, Distribution Panels, Other Electric); wiring and panel connections before walls are closed

  2. 2

    Final Electrical & Clearance to Connect

    SELECTXT code 620; devices installed and panel labeled, protections verified per 2023 NEC

See the full Avondale inspection guide — scheduling & re-inspection fees →

Tips

  • The flat $112.00 Electrical Permit fee (BLD - Flat, per the FY2026 Rates and Fees Schedule) is the standard electrical permit fee category on Avondale's published fee schedule; larger commercial electrical scopes are billed under the Building Permit valuation tiers where applicable.
  • Review timeline is the City's general Building Division timeline of 16 business days for 1st review, 8 for subsequent reviews, per the A.R.S. § 9-835 Development Services Review Timelines document — Avondale's published fee schedule and review-timeline documents do not carve out a separate same-day/expedited track for miscellaneous electrical permits the way some neighboring cities do.

Frequently asked questions

Avondale requires an electrical permit for: Electrical permit required for panel work, service entrance changes, wiring, and other hard-wired electrical work not covered by the code's minor-repair exemptions; Governed by the 2023 NEC as adopted by the City of Avondale, including a temporary (through 9/1/2026) exception to GFCI protection for listed HVAC equipment under Section 210.8(F); Exempt work includes: listed cord-and-plug temporary decorative lighting, reinstallation of attachment plug receptacles, replacement of branch-circuit overcurrent devices of the required capacity in the same location, low-voltage (<25V, <50W) wiring, and minor repairs/lamp replacement; Apply via the Avondale Citizen Portal (Accela Citizen Access), Application Type 'Residential' or 'Commercial', Purpose of Work 'Electric'. If your project isn't listed, confirm with City of Avondale Development Services Department — Building Services Division at 623-333-4000 before starting work.

$112.00 flat, per the City of Avondale FY2026 Rates and Fees Schedule (Mechanical/Plumbing/Electrical category), plus the $102.00 Application Processing Fee.

Avondale's published plan-review target for an electrical permit is 16–24 business days.

You'll need: Building/Electrical Permit Application. Depending on your project, Avondale may also ask for: Load Calculations / Panel Schedule / One-Line Diagram. See the required-documents checklist on this page for details on each.

Avondale requires 2 inspection(s) for an electrical permit, in order: Rough Electric, Final Electrical & Clearance to Connect. Schedule each through City of Avondale Development Services Department — Building Services Division (623-333-4000).

Apply through City of Avondale Development Services Department — Building Services Division at 11465 W. Civic Center Drive, Avondale, AZ 85323. Phone: 623-333-4000, email: buildingservices@avondaleaz.gov. Office hours: 7:00 AM – 6:00 PM (Building Services Division, per the City's Building Services Division page); City Hall / Development Services counter hours are Monday–Thursday 7:00 AM – 6:00 PM per the City's Contact Us footer (City Hall operates a compressed 4-day, 10-hour workweek). Applications are submitted electronically via the Avondale Citizen Portal (Accela Citizen Access). Building Official: Benjamin Carr (bcarr@avondaleaz.gov), per the 2025 Arizona Building Officials (AZBO) Directory.. Official information: https://avondaleaz.gov/government/departments/development-services/building-division/.

Avondale, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Avondale independently adopts and administers its own construction codes through its Development Services Department / Building Services Division; it does not defer permitting to Maricopa County. Source: City of Avondale Building Services Division page (avondaleaz.gov/government/departments/development-services/building-division/).; 2024 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Avondale amendments. Effective January 1, 2026 (per the City's 'Current Adopted Building Codes (effective January 1, 2026)' list). Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document ('Building-Code-Adoption-Final.pdf').; 2024 International Residential Code (IRC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document.; 2024 International Existing Building Code (IEBC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with City of Avondale amendments (note: electrical code cycle is one edition behind the 2024 ICC set), effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document (Avondale Amendments to the 2023 National Electrical Code).; 2024 International Mechanical Code (IMC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2024 International Plumbing Code (IPC), adopted by reference with City of Avondale amendments, effective January 1, 2026, including a burial-depth amendment to G2415.12/IFGC 404.12 and added stub-out/push-to-connect-valve provisions (P2605.1.1, P2605.1.2). Source: City of Avondale Building Code Adoption ordinance document.; 2024 International Fuel Gas Code (IFGC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2024 International Energy Conservation Code (IECC), adopted by reference with City of Avondale amendments, effective January 1, 2026 (Manual J design criteria: elevation 1,101 ft, latitude 34°, outdoor summer design dry-bulb 108°F, outdoor winter design dry-bulb 33°F). Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document.; 2024 International Property Maintenance Code (IPMC), adopted by reference, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2024 International Swimming Pool and Spa Code (ISPSC), adopted by reference with City of Avondale amendments (including an amended barrier-height provision requiring a minimum 60-inch/5-foot barrier height, up from the model code's 48 inches), effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document (Avondale Amendments to the 2024 ISPSC, Section 305.2.1); City of Avondale Swimming Pool Requirements handout (rev. 10.26.2023).; All work must be performed by a contractor licensed with the Arizona Registrar of Contractors (ROC), unless the property owner qualifies as an owner-builder under A.R.S. § 32-1121 (Building Permit Application, Standard Conditions and Applicant Certification, rev. 05.06.2026). Source: City of Avondale Building Permit Application.. Local amendments apply — see the Avondale overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.