Certificate of Occupancy / Change of Occupancy Permit — Avondale, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://avondaleaz.b-cdn.net/app/uploads/2026/04/Certificate-of-Occupancy-Sign-Off-Sheet-4.1.26.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Certificate of Occupancy / Change of Occupancy Permit in Avondale, Arizona
Avondale's mechanism for both (a) the final Certificate of Occupancy (C of O) required before any new-construction or tenant-improvement space may be occupied, and (b) a genuine change of tenant, business, or use in an existing commercial building with no construction work proposed — what many Arizona jurisdictions and this corpus label a stand-alone 'change of use' permit. Avondale does not have a separately named 'Change of Use Permit'; instead, both scenarios are processed as Building Division permit applications under the City's amended 2024 IBC Section 111 / IRC R110 (Certificate of Occupancy) and 2024 IEBC Chapter 6 (classification of work for existing buildings, including change of occupancy), with a dedicated 'no-work' Certificate of Occupancy valuation category for the no-construction case.
Verified 2026-07-23 · Source
When you need this permit
- A building or tenant space shall not be occupied until a Certificate of Occupancy is issued by the Chief Building Official (CBO), per amended 2024 IBC Section 111 / IRC Section R110 and all applicable City codes, ordinances, and approved plans
- Issuance is at the sole discretion of the CBO; a Certificate of Occupancy indicates the building is safe, complete, and code-compliant but does not constitute final approval/acceptance of the work and does not create a vested right or guarantee against future code enforcement — the CBO may suspend or revoke it at any time, with or without notice, for noncompliance
- Required sign-offs before a Certificate of Occupancy will be issued: Planning, Engineering (on-site/off-site), and Fire & Medical (final for site and occupiable area, (623) 333-6020) approvals, followed last by Building Services Division's final inspection sign-off
- For a straight change of tenant, business, or use with no physical construction work proposed (a 'no-work' Certificate of Occupancy request), Avondale still requires a permit application; the permit valuation is calculated under the City's amended AMR (Alterations/Modifications/Remodels) formula — Project Square Footage x BVD Base Rate x Alteration Multiplier — using the Minor-alteration multiplier of 0.20 that the ordinance specifically extends to 'no-work' Certificate of Occupancy requests, per amended IBC/IRC Section 109.3.1
- That AMR valuation is then billed using the same Building Permit Fee Tiers A-H used for any other building permit, plus the standard 65% Building Plan Review Fee and $102.00 Application Processing Fee
- If the change of use/tenant involves reconfiguring space, adding or removing a door or window, or extending/adding building systems, the City may instead apply the Moderate (0.50) or Major (0.70) alteration multiplier rather than the Minor (0.20) 'no-work' rate, per the same Section 109.3.1 table
- Existing-building scope of work, including a change of occupancy classification, must be evaluated against 2024 IEBC Chapter 6 per the City's Commercial Submittal Checklist
- The standard Building Permit Application captures the change directly: a 'BUILDING USE/OCCUPANCY (COMMERCIAL)' field set requires stating both the EXISTING and NEW use/occupancy and the occupant load
- A Temporary Certificate of Occupancy (TCO) may be issued for substantially-but-not-fully-complete work, with escalating fees the longer it remains open before a final C of O issues
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Building / Final Combination
Verifies any permitted work (if applicable) against approved plans; SELECTXT code 630/640 per this record's other Building Division entries
- 2
Engineering Final (On-Site/Off-Site)
Engineering Division sign-off on the Certificate of Occupancy Sign-Off Sheet; approval provided is limited to C of O processing and does not release separate Engineering permit/subdivision-improvement obligations
- 3
Fire & Medical Final (Site and Occupiable Area)
Coordinated at (623) 333-6020 per the Certificate of Occupancy Sign-Off Sheet
See the full Avondale inspection guide — scheduling & re-inspection fees →
Tips
- Avondale has no free or purely administrative path to change a tenant/business/use in an existing commercial space — even a genuine 'no-work' change of use still requires a Building Division permit application, sign-offs from Planning/Engineering/Fire & Medical, the flat $158 Certificate of Occupancy fee, the $102 Application Processing Fee, and a valuation-based Building Permit Fee (using the Minor/0.20 AMR multiplier carved out specifically for no-work CO requests).
- Confirm with the Building Services Division whether a specific tenant/use change is genuinely 'no-work' (Minor, 0.20 multiplier) or actually involves space reconfiguration, door/window changes, or system extensions that would push it into the Moderate (0.50) or Major (0.70) AMR multiplier tiers — the City's own ordinance table places these on the same page and it is easy to under-scope a change-of-use application.
- Building Services Division signs off last on the Certificate of Occupancy Sign-Off Sheet, after Planning, Engineering, and Fire & Medical — budget for all three other sign-offs to be in hand before scheduling the final Building inspection; the City's own sign-off sheet recommends contacting Planning, Engineering, and Fire 3 weeks in advance of scheduling final inspections.
- A Certificate of Completion for Commercial Shell Buildings ($225) is a distinct, earlier-stage product that verifies a completed shell building is code-compliant but explicitly does not authorize occupancy or substitute for a Certificate of Occupancy — a tenant build-out inside an already-shelled building will still need its own separate Certificate of Occupancy.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Avondale
Certificate of Occupancy / Change of Occupancy Permit in other cities
Compare certificate of occupancy / change of occupancy permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Avondale project checklist
Describe your project once and get every permit, document, and fee it triggers in Avondale — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →