Commercial Building Permit in Avondale, Arizona
Required for new commercial construction, and for existing commercial/tenant-improvement work reviewed under 2024 IEBC Chapter 6, in the City of Avondale. The City's Commercial Submittal Checklist (rev. 01.14.2026) explicitly lists 'Project Scope of Work (For Existing Work Use 2024 IEBC Chapter 6)' as a General submittal item and the City's SELECTXT inspection code list includes a dedicated 'Tenant Improvement Final Fire' inspection (code 988) within the same Commercial (BLDCOM) inspection category — Avondale does not appear to run a separate tenant-improvement permit type; TI work is processed through this same commercial building permit process. Reviewed against the 2024 IBC and City of Avondale amendments (effective January 1, 2026). Applications are submitted electronically via the Avondale Citizen Portal (Accela Citizen Access).
Verified 2026-07-29 · Source
When you need this permit
- Building permit required for new commercial (and multi-family, MFR) construction, and for existing-building/tenant-improvement work reviewed under 2024 IEBC Chapter 6, within Avondale city limits
- Plans must comply with the 2024 IBC and City of Avondale amendments (effective January 1, 2026)
- All commercial construction documents shall be prepared and sealed by a registered design professional when required by the adopted building codes or Arizona law, as determined by the Building Official (2024 IBC Section 107), per the Commercial Submittal Checklist
- Complete electronic submittal required per the Commercial Submittal Checklist (rev. 01.14.2026), covering General, Architectural, Structural, Electrical, Mechanical, Plumbing, and Additional Documents categories
- IECC compliance path must be identified (2024 IECC C401.2.1), with exterior/interior lighting and building thermal envelope energy compliance reports
- Special inspections must be identified where required, with a Special Inspection Certificate submitted
- Submittal via the Avondale Citizen Portal (Accela Citizen Access)
- All work must be performed by an Arizona ROC-licensed contractor Contractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation (Layout/Setbacks, Footing/Ufer, Stem, Pre-Slab, Post-Tension Slab)
SELECTXT Commercial (BLDCOM) codes 100-125; required before concrete pour
- 2
Underground/Soils (Under-Slab Plumbing/Electrical, UG Building Sewer/Water/Electric/Gas Service)
SELECTXT Commercial (BLDCOM) codes 140-180
- 3
Rough (Shear Wall, Roof Truss/Nail, Mechanical, Plumbing, Electric, Service Entrance Section, Distribution Panels, Framing)
SELECTXT Commercial (BLDCOM) codes 200-245, before walls are closed
- 4
Masonry Walls / Wall Cover (Window/Door Flashing, Water-Resistant Barrier, Fire Rated/Drywall Nail, Lath Nail, Tilt Panels)
SELECTXT Commercial (BLDCOM) codes 270-350
- 5
Above Grid Ceiling (AGC Framing, Plumbing, Electric, Mechanical, Fire Dampers, Labeling, Roof Drain, HVAC Pre-Wrap, Grease Duct Test, Type I Hood Performance Test)
SELECTXT Commercial (BLDCOM) codes 400-450 — unique to the commercial inspection category (not present in the residential BLDRES list); applies to above-ceiling MEP work and, for food-service tenants, kitchen exhaust/grease duct systems
- 6
Building Department Final Inspection Verifications (Special Inspection Review, Backflow, Final Mechanical/Plumbing/Electrical/Insulation/Building/Accessibility, Final Combination)
SELECTXT Commercial (BLDCOM) codes 600-660
- 7
Other Department Inspections (Fire Site/Final, Planning Site/Final) and Certificates (Certificate of Completion for Shell, Temporary Certificate of Occupancy, Certificate of Occupancy)
SELECTXT Commercial (BLDCOM) codes 800-890, required before Certificate of Occupancy issuance
See the full Avondale inspection guide — scheduling & re-inspection fees →
Tips
- The Commercial Submittal Checklist (rev. 01.14.2026) is used for both new commercial construction and existing-building/tenant-improvement work (via 2024 IEBC Chapter 6 scope-of-work designation) — Avondale does not publish a separate tenant-improvement permit application or fee table, so budget and schedule TI work against this same commercial building permit process.
- Per the City of Avondale Development Services Review Timelines (A.R.S. § 9-835 compliance document, revised 10/31/2024, effective 06/10/2024), all Building Division applications — the document does not split out a commercial-specific figure — get 16 business days for 1st review and 8 business days for each subsequent review; the City's business week is Monday–Thursday.
- The Commercial (BLDCOM) SELECTXT inspection list includes an 'Above Grid Ceiling' category (framing, plumbing, electric, mechanical, fire dampers, roof drain, HVAC pre-wrap, grease duct test, Type I hood performance test) and inspections not found in the residential list (Service Entrance Section, Distribution Panels, Tilt Panels, Storage Racking, Final Accessibility) — confirm which apply to your specific commercial scope with the Building Services Division.
- The FY2026 Rates and Fees Schedule (effective 9/1/2025) is the current, sole fee authority; a new rates-and-fees resolution was noticed for a City Council vote on July 13, 2026, so fee amounts should be reconfirmed if querying after that date.
- Inspections are scheduled via SELECTXT (text (833) 324-1348 with SCHEDULE/CANCEL/RESCHEDULE/RESULTS) or the Selectron Building Inspection website; next-business-day inspections must be requested by 4:00 p.m. Inspections run Monday–Thursday 7:00 a.m.–4:00 p.m., closed Fridays and City holidays.
- Permits become invalid if work is not commenced within 180 days of issuance, or if more than 180 days pass between approved inspections.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Avondale.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Avondale
Commercial Building Permit in other cities
Compare commercial building permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Avondale project checklist
Describe your project once and get every permit, document, and fee it triggers in Avondale — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →