Skip to main content
PermitBase

Plumbing Permit in Avondale, Arizona

Required for plumbing installation, alteration, or repair work in Avondale, governed by the 2024 International Plumbing Code (IPC) as adopted and amended by the City of Avondale, including a stricter gas-piping minimum burial depth and added push-to-connect-valve restrictions.

Verified 2026-07-06 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping not covered by the code's minor-repair exemptions
  • Governed by the 2024 IPC as adopted by the City of Avondale
  • Gas piping minimum burial depth: 12 inches for metal piping, 18 inches for plastic piping (Avondale-amended G2415.12/IFGC 404.12)
  • Push-to-connect plastic valves are prohibited for use as shutoff, stub-out, or fixture supply valves (P2605.1.2, Added); non-metallic water distribution piping penetrating a wall/floor must use a rigid metal stub-out (P2605.1.1, Added)
  • Apply via the Avondale Citizen Portal (Accela Citizen Access), Application Type 'Residential' or 'Commercial', Purpose of Work 'Plumbing'

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing PermitCity of Avondale FY2026 Rates and Fees Schedule, Mechanical/Plumbing/Electrical (MPE), Resolution 1045-0725, effective 9/1/2025
$96.00
Application Processing FeeCity of Avondale FY2026 Rates and Fees Schedule, Building Division Fees, Resolution 1045-0725
$102.00

Review timeline

Plan reviewAvondale’s published plan-review target
16–24 business days

How long did your Plumbing Permit permit actually take in Avondale?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Under-Slab Plumbing / UG Building Sewer / UG Water Service

    SELECTXT codes 150, 165, 170; before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough Plumbing

    SELECTXT code 215; after pipes installed, before walls closed

  3. 3

    Final Plumbing

    SELECTXT code 615; fixtures connected, no leaks

See the full Avondale inspection guide — scheduling & re-inspection fees →

Tips

  • The flat $96.00 Plumbing Permit fee is the standard published fee category on Avondale's FY2026 Rates and Fees Schedule; larger-scope plumbing work tied to new construction is captured within the overall Building Permit valuation tiers.
  • Avondale's gas-piping burial-depth amendment (12in metal / 18in plastic) is identical to the amendment used by several other Maricopa County cities, but is independently adopted by Avondale's own ordinance.
  • Review timeline is the City's general Building Division timeline: 16 business days for 1st review, 8 for subsequent reviews, per the A.R.S. § 9-835 Development Services Review Timelines document.

Frequently asked questions

Avondale requires a plumbing permit for: Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping not covered by the code's minor-repair exemptions; Governed by the 2024 IPC as adopted by the City of Avondale; Gas piping minimum burial depth: 12 inches for metal piping, 18 inches for plastic piping (Avondale-amended G2415.12/IFGC 404.12); Push-to-connect plastic valves are prohibited for use as shutoff, stub-out, or fixture supply valves (P2605.1.2, Added); non-metallic water distribution piping penetrating a wall/floor must use a rigid metal stub-out (P2605.1.1, Added); Apply via the Avondale Citizen Portal (Accela Citizen Access), Application Type 'Residential' or 'Commercial', Purpose of Work 'Plumbing'. If your project isn't listed, confirm with City of Avondale Development Services Department — Building Services Division at 623-333-4000 before starting work.

$96.00 flat, per the City of Avondale FY2026 Rates and Fees Schedule (Mechanical/Plumbing/Electrical category), plus the $102.00 Application Processing Fee.

Avondale's published plan-review target for a plumbing permit is 16–24 business days.

You'll need: Building/Plumbing Permit Application; Fixture calculations, isometric (waste/vent, water, gas), water supply system plan. See the required-documents checklist on this page for details on each.

Avondale requires 3 inspection(s) for a plumbing permit, in order: Under-Slab Plumbing / UG Building Sewer / UG Water Service, Rough Plumbing, Final Plumbing. Schedule each through City of Avondale Development Services Department — Building Services Division (623-333-4000).

Apply through City of Avondale Development Services Department — Building Services Division at 11465 W. Civic Center Drive, Avondale, AZ 85323. Phone: 623-333-4000, email: buildingservices@avondaleaz.gov. Office hours: 7:00 AM – 6:00 PM (Building Services Division, per the City's Building Services Division page); City Hall / Development Services counter hours are Monday–Thursday 7:00 AM – 6:00 PM per the City's Contact Us footer (City Hall operates a compressed 4-day, 10-hour workweek). Applications are submitted electronically via the Avondale Citizen Portal (Accela Citizen Access). Building Official: Benjamin Carr (bcarr@avondaleaz.gov), per the 2025 Arizona Building Officials (AZBO) Directory.. Official information: https://avondaleaz.gov/government/departments/development-services/building-division/.

Avondale, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Avondale independently adopts and administers its own construction codes through its Development Services Department / Building Services Division; it does not defer permitting to Maricopa County. Source: City of Avondale Building Services Division page (avondaleaz.gov/government/departments/development-services/building-division/).; 2024 International Building Code (IBC), as published by the International Code Council, adopted by reference with City of Avondale amendments. Effective January 1, 2026 (per the City's 'Current Adopted Building Codes (effective January 1, 2026)' list). Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document ('Building-Code-Adoption-Final.pdf').; 2024 International Residential Code (IRC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document.; 2024 International Existing Building Code (IEBC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with City of Avondale amendments (note: electrical code cycle is one edition behind the 2024 ICC set), effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document (Avondale Amendments to the 2023 National Electrical Code).; 2024 International Mechanical Code (IMC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2024 International Plumbing Code (IPC), adopted by reference with City of Avondale amendments, effective January 1, 2026, including a burial-depth amendment to G2415.12/IFGC 404.12 and added stub-out/push-to-connect-valve provisions (P2605.1.1, P2605.1.2). Source: City of Avondale Building Code Adoption ordinance document.; 2024 International Fuel Gas Code (IFGC), adopted by reference with City of Avondale amendments, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2024 International Energy Conservation Code (IECC), adopted by reference with City of Avondale amendments, effective January 1, 2026 (Manual J design criteria: elevation 1,101 ft, latitude 34°, outdoor summer design dry-bulb 108°F, outdoor winter design dry-bulb 33°F). Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document.; 2024 International Property Maintenance Code (IPMC), adopted by reference, effective January 1, 2026. Source: City of Avondale Building Services Division page.; 2024 International Swimming Pool and Spa Code (ISPSC), adopted by reference with City of Avondale amendments (including an amended barrier-height provision requiring a minimum 60-inch/5-foot barrier height, up from the model code's 48 inches), effective January 1, 2026. Source: City of Avondale Building Services Division page; City of Avondale Building Code Adoption ordinance document (Avondale Amendments to the 2024 ISPSC, Section 305.2.1); City of Avondale Swimming Pool Requirements handout (rev. 10.26.2023).; All work must be performed by a contractor licensed with the Arizona Registrar of Contractors (ROC), unless the property owner qualifies as an owner-builder under A.R.S. § 32-1121 (Building Permit Application, Standard Conditions and Applicant Certification, rev. 05.06.2026). Source: City of Avondale Building Permit Application.. Local amendments apply — see the Avondale overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.