Plumbing Permit — Avondale, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://avondaleaz.b-cdn.net/app/uploads/2026/04/FY2026-Rates-and-Fee-Schedule-090125.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Avondale, Arizona
Required for plumbing installation, alteration, or repair work in Avondale, governed by the 2024 International Plumbing Code (IPC) as adopted and amended by the City of Avondale, including a stricter gas-piping minimum burial depth and added push-to-connect-valve restrictions.
Verified 2026-07-06 · Source
When you need this permit
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping not covered by the code's minor-repair exemptions
- Governed by the 2024 IPC as adopted by the City of Avondale
- Gas piping minimum burial depth: 12 inches for metal piping, 18 inches for plastic piping (Avondale-amended G2415.12/IFGC 404.12)
- Push-to-connect plastic valves are prohibited for use as shutoff, stub-out, or fixture supply valves (P2605.1.2, Added); non-metallic water distribution piping penetrating a wall/floor must use a rigid metal stub-out (P2605.1.1, Added)
- Apply via the Avondale Citizen Portal (Accela Citizen Access), Application Type 'Residential' or 'Commercial', Purpose of Work 'Plumbing'
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Under-Slab Plumbing / UG Building Sewer / UG Water Service
SELECTXT codes 150, 165, 170; before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough Plumbing
SELECTXT code 215; after pipes installed, before walls closed
- 3
Final Plumbing
SELECTXT code 615; fixtures connected, no leaks
See the full Avondale inspection guide — scheduling & re-inspection fees →
Tips
- The flat $96.00 Plumbing Permit fee is the standard published fee category on Avondale's FY2026 Rates and Fees Schedule; larger-scope plumbing work tied to new construction is captured within the overall Building Permit valuation tiers.
- Avondale's gas-piping burial-depth amendment (12in metal / 18in plastic) is identical to the amendment used by several other Maricopa County cities, but is independently adopted by Avondale's own ordinance.
- Review timeline is the City's general Building Division timeline: 16 business days for 1st review, 8 for subsequent reviews, per the A.R.S. § 9-835 Development Services Review Timelines document.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Avondale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Avondale
Plumbing Permit in other cities
Compare plumbing permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Avondale project checklist
Describe your project once and get every permit, document, and fee it triggers in Avondale — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →