Residential Over-the-Counter (OTC) Permit — Electrical / Mechanical / Plumbing / Building in Camp Verde, Arizona
For minor residential building, electrical, mechanical, or plumbing projects (e.g., electrical service upgrades, yard gas lines, water heater installations) in the Town of Camp Verde, issued on a fast-track, minimal-plan-review basis relative to standard building permits.
Verified 2026-07-06 · Source
When you need this permit
- Available for minor residential building, electrical, mechanical, or plumbing projects such as electrical service upgrades, yard gas lines, and hot water heater installations
- Governed by the 2023 NEC, 2024 IPC, 2024 IMC, and 2024 IFGC as adopted by the Town of Camp Verde (Ordinance 2026-A512, effective 02-26-2026)
- Combo permits (any combination of electrical/mechanical/plumbing/building OTC scopes) are available under a single application
- Apply via the GovWell One-Stop Permitting Portal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
Where applicable to the scope (electrical, plumbing, or mechanical rough-in) before covering
- 2
Final
Devices/fixtures installed and operational, verified per adopted code; up to 2 inspections included in the Combo OTC fee
See the full Camp Verde inspection guide — scheduling & re-inspection fees →
Tips
- Both the Town's general permits page ('Over the Counter - 0-3 business days') and the Building Division's detailed process flow chart ('Residential Over-the-Counter and Demo Applications 0-3 Business Days') agree on this timeframe — it is a doubly-confirmed, verified figure.
- A Combo OTC permit bundling multiple trades (e.g., a water heater replacement needing both plumbing and electrical) is more economical than separate single-trade OTC permits: $90 flat plus $30 per additional trade, versus $90 each.
- OTC permits carry a smaller non-refundable retention on cancellation ($25 or 25%, whichever is greater) compared to standard building permits ($50 or 25%).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Camp Verde
Look up this fee in a different city →
Now live
Build your Camp Verde project checklist
Describe your project once and get every permit, document, and fee it triggers in Camp Verde — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →