Residential Over-the-Counter (OTC) Permit — Electrical / Mechanical / Plumbing / Building in Camp Verde, Arizona

For minor residential building, electrical, mechanical, or plumbing projects (e.g., electrical service upgrades, yard gas lines, water heater installations) in the Town of Camp Verde, issued on a fast-track, minimal-plan-review basis relative to standard building permits.

Verified 2026-07-06 · Source

When you need this permit

  • Available for minor residential building, electrical, mechanical, or plumbing projects such as electrical service upgrades, yard gas lines, and hot water heater installations
  • Governed by the 2023 NEC, 2024 IPC, 2024 IMC, and 2024 IFGC as adopted by the Town of Camp Verde (Ordinance 2026-A512, effective 02-26-2026)
  • Combo permits (any combination of electrical/mechanical/plumbing/building OTC scopes) are available under a single application
  • Apply via the GovWell One-Stop Permitting Portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

OTC ElectricalTown of Camp Verde FY26 Fee Schedule, Community Development section, Residential Over the Counter Permits
$90.00
OTC MechanicalTown of Camp Verde FY26 Fee Schedule, Community Development section
$90.00
OTC PlumbingTown of Camp Verde FY26 Fee Schedule, Community Development section
$90.00
OTC BuildingTown of Camp Verde FY26 Fee Schedule, Community Development section
$90.00
OTC Combo (any combination of the above)Town of Camp Verde FY26 Fee Schedule, Community Development section
$90.00 flat fee plus $30.00 for each added OTC permit (includes 2 inspections)

Review timeline

Plan reviewCamp Verde’s published plan-review target
0–3 business days

How long did your Residential Over-the-Counter (OTC) Permit — Electrical / Mechanical / Plumbing / Building permit actually take in Camp Verde?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Where applicable to the scope (electrical, plumbing, or mechanical rough-in) before covering

  2. 2

    Final

    Devices/fixtures installed and operational, verified per adopted code; up to 2 inspections included in the Combo OTC fee

See the full Camp Verde inspection guide — scheduling & re-inspection fees →

Tips

  • Both the Town's general permits page ('Over the Counter - 0-3 business days') and the Building Division's detailed process flow chart ('Residential Over-the-Counter and Demo Applications 0-3 Business Days') agree on this timeframe — it is a doubly-confirmed, verified figure.
  • A Combo OTC permit bundling multiple trades (e.g., a water heater replacement needing both plumbing and electrical) is more economical than separate single-trade OTC permits: $90 flat plus $30 per additional trade, versus $90 each.
  • OTC permits carry a smaller non-refundable retention on cancellation ($25 or 25%, whichever is greater) compared to standard building permits ($50 or 25%).

Frequently asked questions

Camp Verde requires a residential over-the-counter (otc) permit — electrical / mechanical / plumbing / building for: Available for minor residential building, electrical, mechanical, or plumbing projects such as electrical service upgrades, yard gas lines, and hot water heater installations; Governed by the 2023 NEC, 2024 IPC, 2024 IMC, and 2024 IFGC as adopted by the Town of Camp Verde (Ordinance 2026-A512, effective 02-26-2026); Combo permits (any combination of electrical/mechanical/plumbing/building OTC scopes) are available under a single application; Apply via the GovWell One-Stop Permitting Portal. If your project isn't listed, confirm with Town of Camp Verde Community Development Department — Development Services (Building Division) at 928-554-0050 before starting work.

In Camp Verde, the published OTC Electrical is: $90.00. Additional published fees: OTC Mechanical — $90.00; OTC Plumbing — $90.00; OTC Building — $90.00; OTC Combo (any combination of the above) — $90.00 flat fee plus $30.00 for each added OTC permit (includes 2 inspections). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Camp Verde's published plan-review target for a residential over-the-counter (otc) permit — electrical / mechanical / plumbing / building is 0–3 business days.

You'll need: Over-the-Counter Permit Application; Manufacturer Specifications / Cut Sheets. See the required-documents checklist on this page for details on each.

Camp Verde requires 2 inspection(s) for a residential over-the-counter (otc) permit — electrical / mechanical / plumbing / building, in order: Rough-In, Final. Schedule each through Town of Camp Verde Community Development Department — Development Services (Building Division) (928-554-0050).

Apply through Town of Camp Verde Community Development Department — Development Services (Building Division) at 473 S. Main Street, Suite 108, Camp Verde, AZ 86322. Phone: 928-554-0050, email: BuildingPermitGroup@campverde.az.gov. Office hours: Monday - Thursday, 7:00 a.m. - 5:00 p.m. (closed Fridays). Applications, plans, and checklists are submitted through the GovWell online One-Stop Permitting Portal (app.govwelltech.com/camp-verde); Chief Building Official is Roxanne Jasman (928-554-0061); Building Inspectors are Josh Presmyk and Jon Rivero (928-554-0050 / 928-554-0065).. Official information: https://www.campverde.az.gov/departments/community_development/permits.php.

Camp Verde, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Camp Verde's Community Development Department (Development Services) independently adopts and administers its own construction codes; it does not defer permitting to Yavapai County. Source: Town of Camp Verde Development Permits page (campverde.az.gov/departments/community_development/permits.php).; 2024 International Building Code (IBC), with Appendices C, I, J, K, and P, adopted by reference by the Town of Camp Verde via Ordinance 2026-A512, effective February 26, 2026, with Town amendments. This ordinance superseded the prior 2018-edition ICC code set adopted under Ordinance 2019-A440 (01-23-2019). Source: Town of Camp Verde Ordinance 2026-A512 (Scrivenor's Error corrected version).; 2024 International Residential Code (IRC) for One- and Two-Family Dwellings, with Appendices BB, BD, BF, BJ, BM, BN, CA, and CB, adopted by reference (Ordinance 2026-A512, effective 02-26-2026), with Town amendments including reduced wind-speed design criteria and a new tiny-house appendix. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).; 2018 International Energy Conservation Code (IECC) — NOTE: the Town explicitly declined to advance to the 2024 IECC edition in the 2026 code update; Chief Building Official Roxanne Jasman stated 'the studies don't show that the cost of construction and different design aspects outweigh the benefits,' and no neighboring jurisdiction had adopted the 2024 IECC at the time of the Town's decision. Source: JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026); Town of Camp Verde Ordinance 2026-A512.; 2024 International Existing Building Code (IEBC), adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Fire Code (IFC), with Appendices B through O, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) as the Town's uniform fire code. Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Fuel Gas Code (IFGC), with Appendix A, B, Category 1 Appliances and Appliances Listed for Use with Type B Vents, and Appendix C, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Mechanical Code (IMC), with Appendix A, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference (Ordinance 2026-A512, effective 02-26-2026); electrical code cycle is one edition behind the 2024 ICC set, consistent with typical Arizona NEC adoption lag. A whole-house surge protector requirement was newly added for the 2024-cycle NEC adoption. Source: Town of Camp Verde Ordinance 2026-A512; JournalAZ, 'Camp Verde Town Council talks building codes' (Feb. 18, 2026).; 2024 International Plumbing Code (IPC), with Appendix C and E, adopted by reference (Ordinance 2026-A512, effective 02-26-2026). Source: Town of Camp Verde Ordinance 2026-A512.; 2024 International Swimming Pool and Spa Code, adopted by reference (Ordinance 2026-A512, effective 02-26-2026) — a newly-adopted standalone code not present in the Town's prior (2018-cycle) code set. Source: Town of Camp Verde Ordinance 2026-A512.; Manufactured homes, mobile homes, and factory-built buildings: the Town of Camp Verde has an Intergovernmental Agreement (IGA) with the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (OMH) to enforce installation standards for manufactured and factory-built buildings within the Town, pursuant to Arizona Administrative Code (A.A.C.) §R4-34-501 and §R4-34-801; OMH-established fees for manufactured home/factory-built set permits are adopted by the Town through this IGA. Source: Town of Camp Verde FY26 Fee Schedule, Community Development section (Mobile/Manufactured Housing Permits, effective 7/1/25).. Local amendments apply — see the Camp Verde overview page for the full list.

0-3 business days, per both the Town of Camp Verde Development Permits page and the Community Development Department's published Building Division process flow chart. This applies to minor residential electrical, mechanical, plumbing, and building scopes such as water heater replacement, yard gas lines, and electrical service upgrades.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camp Verde building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.