Manufactured Home / Park Model Placement Permit — Florence, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.florenceaz.gov/wp-content/uploads/documents/Community%20Development/Applications/PermitApplication/Packet%20-%20Manufactured%20Home%20Permit%20Application%20Rev%209.11.25.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Manufactured Home / Park Model Placement Permit in Florence, Arizona
Required for placement (set) of a manufactured home or park model on a lot in Florence, using the Town's dedicated Manufactured Home Permit Application. Construction/installation standards for the unit itself are regulated by the State of Arizona Office of Manufactured Housing; the Town's permit covers on-site placement, foundation/tie-down, and site compliance.
Verified 2026-07-06 · Source
When you need this permit
- Manufactured Home Permit Application (Rev 9.11.25) required for placement of a manufactured home
- Manufactured home construction/installation standards are set by the State of Arizona Office of Manufactured Housing (A.R.S. § 41-4001 et seq.); the Town's permit fee follows the most current Office of Manufactured Housing Intergovernmental Agreement
- Park Model Placement is a distinct permit category from a full Manufactured Home Set
- Legal non-conforming RV parks with privately owned lots (existing at code adoption) have specific reduced fire-separation-distance allowances for replacement/new Park Model dwelling units per IRC § R302.1 exceptions
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Tie-Down
Verifies foundation and tie-down system compliance before final
- 2
Final
Utility connections and site compliance verified per Town zoning/setback rules
See the full Florence inspection guide — scheduling & re-inspection fees →
Tips
- Manufactured homes are grouped under the 'Residential' category on the Town's Submittal Review Timelines chart, alongside accessory buildings, plumbing, electrical, mechanical, park models, pools, remodel, solar, and gas — 10-day Administrative Review plus 20 business days for 1st/2nd review, 15 for subsequent.
- The State of Arizona Office of Manufactured Housing governs the unit's own construction/installation standards; the Town's fee explicitly follows 'the most current Office of Manufactured Housing Intergovernmental Agreement,' meaning the $450 figure is tied to a state-level agreement that should be reconfirmed if it has been updated since this fee schedule revision.
- Park Model Placement in a legal non-conforming RV park with privately owned lots can retain reduced fire-separation distances under the Town's IRC § R302.1 amendment (exceptions 6-9).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Florence
Manufactured Home / Park Model Placement Permit in other cities
Compare manufactured home / park model placement permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Florence project checklist
Describe your project once and get every permit, document, and fee it triggers in Florence — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →