Inspection sequence, scheduling, and re-inspection fees for building permits in Florence, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
224 W 20th Street, P.O. Box 2670, Florence, AZ 85132
Phone
520-868-7575
Office hours
Monday - Thursday, 7:00 a.m. - 5:00 p.m.; closed Fridays (Town of Florence transitioned to a four-day workweek effective January 5, 2026). Inspection Line: 520-868-7601. Residential submittals go through the online Residential Permitting Portal (SmartGov, twn-florence-az.smartgovcommunity.com); commercial submittals are emailed to TOFPermits@FlorenceAZ.gov; in-person submittals accepted (no rolled plans; 1-sided 8.5x11 paper only). Building Official: Kevin Wall (520-868-7556, kevin.wall@florenceaz.gov). Permit Specialist: Susan Cisco (520-868-7665, susan.cisco@florenceaz.gov). Plans Examiner: Hillarey Luther (520-868-7540). Community Development Director: Albert 'AJ' Monroe (520-868-7542).

Inspection sequence

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts, 12-inch minimum sewer depth

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater pan (if required) and gas connections verified, no leaks

Applies to: Residential Addition / Remodel / Accessory Structure Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions/accessory structures with foundations

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Residential Building Permit (New Construction — SFR)

  1. 1

    Foundation/Footing

    Before concrete pour; termite pretreatment certification verified

  2. 2

    Framing

    Structural framing, connections, egress, per 2018 IRC and Town of Florence Design Criteria

  3. 3

    Final / Certificate of Occupancy

    All work complete per approved plans; Certificate of Occupancy issued ($75 fee)

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed and tested; 1,000A+ service equipment performance/high-potential tested per NEC Article 230.11 Town amendment

Applies to: EV Charger / Electric Vehicle Charging Station Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    EV charger equipment installed and tested; electrical bonding/grounding verified

Applies to: Fire Alarm System Permit

  1. 1

    Rough-In Inspection

    Wiring, conduit paths, and device placement verified before walls/ceilings are closed

  2. 2

    Final / Acceptance Test

    Device activation testing, offsite monitoring verification, and final sign-off

Applies to: Fire Sprinkler System Permit

  1. 1

    Rough Sprinkler Inspection

    Piping, riser installation, and hangers verified before concealment (new commercial/residential systems include 2 inspections in the permit fee)

  2. 2

    Final / Acceptance Test

    Hydrostatic and flow testing, fire department connection, and final sign-off

Applies to: Manufactured Home / Park Model Placement Permit

  1. 1

    Foundation/Tie-Down

    Verifies foundation and tie-down system compliance before final

  2. 2

    Final

    Utility connections and site compliance verified per Town zoning/setback rules

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified, cooling capacity meets the 80°F/3-ft standard

Applies to: Residential Solar Photovoltaic (PV) System Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified

Applies to: Swimming Pool / Spa Permit

  1. 1

    Pre-Gunite / Steel

    Verifies excavation, steel reinforcement, and plumbing before shotcrete/gunite for in-ground pools

  2. 2

    Final

    Pool barrier/fencing compliance, equipment, and electrical bonding verified

Florence building permits

Get alerts for Florence

We'll email you when Florence's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.