Florence building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Florence, Arizona.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 224 W 20th Street, P.O. Box 2670, Florence, AZ 85132
- Phone
- 520-868-7575
- Office hours
- Monday - Thursday, 7:00 a.m. - 5:00 p.m.; closed Fridays (Town of Florence transitioned to a four-day workweek effective January 5, 2026). Inspection Line: 520-868-7601. Residential submittals go through the online Residential Permitting Portal (SmartGov, twn-florence-az.smartgovcommunity.com); commercial submittals are emailed to TOFPermits@FlorenceAZ.gov; in-person submittals accepted (no rolled plans; 1-sided 8.5x11 paper only). Building Official: Kevin Wall (520-868-7556, kevin.wall@florenceaz.gov). Permit Specialist: Susan Cisco (520-868-7665, susan.cisco@florenceaz.gov). Plans Examiner: Hillarey Luther (520-868-7540). Community Development Director: Albert 'AJ' Monroe (520-868-7542).
- Website
- Official site
Inspection sequence
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, cleanouts, 12-inch minimum sewer depth
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, water heater pan (if required) and gas connections verified, no leaks
Applies to: Residential Addition / Remodel / Accessory Structure Permit
- 1
Foundation/Footing
Required before concrete pour for additions/accessory structures with foundations
- 2
Framing
Structural connections to existing structure
- 3
Final
Completed work verified against approved plans
Applies to: Residential Building Permit (New Construction — SFR)
- 1
Foundation/Footing
Before concrete pour; termite pretreatment certification verified
- 2
Framing
Structural framing, connections, egress, per 2018 IRC and Town of Florence Design Criteria
- 3
Final / Certificate of Occupancy
All work complete per approved plans; Certificate of Occupancy issued ($75 fee)
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final
Devices installed and tested; 1,000A+ service equipment performance/high-potential tested per NEC Article 230.11 Town amendment
Applies to: EV Charger / Electric Vehicle Charging Station Permit
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final
EV charger equipment installed and tested; electrical bonding/grounding verified
Applies to: Fire Alarm System Permit
- 1
Rough-In Inspection
Wiring, conduit paths, and device placement verified before walls/ceilings are closed
- 2
Final / Acceptance Test
Device activation testing, offsite monitoring verification, and final sign-off
Applies to: Fire Sprinkler System Permit
- 1
Rough Sprinkler Inspection
Piping, riser installation, and hangers verified before concealment (new commercial/residential systems include 2 inspections in the permit fee)
- 2
Final / Acceptance Test
Hydrostatic and flow testing, fire department connection, and final sign-off
Applies to: Manufactured Home / Park Model Placement Permit
- 1
Foundation/Tie-Down
Verifies foundation and tie-down system compliance before final
- 2
Final
Utility connections and site compliance verified per Town zoning/setback rules
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances and combustion air verified, cooling capacity meets the 80°F/3-ft standard
Applies to: Residential Solar Photovoltaic (PV) System Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final
Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified
Applies to: Swimming Pool / Spa Permit
- 1
Pre-Gunite / Steel
Verifies excavation, steel reinforcement, and plumbing before shotcrete/gunite for in-ground pools
- 2
Final
Pool barrier/fencing compliance, equipment, and electrical bonding verified
Final inspection only: Change of Occupancy Permit, Commercial Sign Permit, Demolition Permit, Re-Roofing Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Florence building permits
Get alerts for Florence
We'll email you when Florence's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.