Commercial Sign Permit in Florence, Arizona

Required for permanent commercial/business signage in Florence (wall, monument, projecting, suspended, and awning/canopy signs), applied for on the Town's Building Permit Application ('Sign' checkbox under the COMMERCIAL permit-type section). Signs proposed within the Florence Townsite Historic District carry an additional Historic District Advisory Commission (HDAC) Certificate of Appropriateness / Design Review requirement on top of the standard building permit, governed by Chapter 6 (Design Guidelines for Signs) of the Town's Historic Preservation Design Guidelines.

Verified 2026-07-23 · Source

When you need this permit

  • Building permit required for permanent signs (set on their own foundation, sunk into the ground, or permanently fastened to/painted on a structure, canopy, or awning); temporary signs do not require a building permit but must still comply with Town Code
  • Applied for on the Building Permit Application (Rev 9.11.25) with 'Sign' checked under the COMMERCIAL permit-type section
  • Sign permits are grouped under 'Commercial New Construction / Tenant Improvement' on the Town's Submittal Review Timelines chart, explicitly alongside plumbing, electrical, mechanical, fire sprinkler, fire alarm, and hood system work
  • Signs within the Florence Townsite Historic District additionally require HDAC review: the Historic Preservation Design Guidelines explicitly list 'Construction or placement of signage in the Florence Townsite Historic District' as requiring a Design Review / Certificate of Appropriateness (COA), which is often a preliminary requirement to obtaining the building permit
  • Minor Work COAs (signage that does not alter the property's appearance/character in a way conflicting with the Guidelines) can be approved administratively by Town Planning Staff, sometimes within days; Major Work (new construction, extensive alteration) requires a full HDAC hearing (held monthly)
  • Historic District sign design standards (Chapter 6): roof signs and freestanding pole signs are prohibited except for Town-erected historic markers; base sign size should not exceed 1 sq ft per lineal foot of street frontage; small LED signs (4 sq ft or less) are allowed only behind windows; neon is limited similarly unless historically documented as larger; all signs must still separately comply with the Florence Town Code's Sign Regulations
  • A Comprehensive Sign Plan (Administrative, $500) is available for multi-tenant/multi-sign commercial developments as an alternative to permitting each sign individually

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Commercial Sign — Building Permit FeeTown of Florence Fee Schedule (Rev. 01/15/2025), Section 2; no separately itemized flat sign-permit fee line was found in the Fee Schedule — signs are billed via the standard Commercial Building Permit Fee/Table 1-A valuation chart like other Commercial Building Permit Application scopes. This gap is noted honestly rather than an amount being invented.
Based on Valuation (Table 1-A) plus 65% plan review fee — see Residential Building Permit fee table for the full valuation chart
Comprehensive Sign Plan: AdministrativeTown of Florence Fee Schedule (Rev. 01/15/2025), Section 5, Use Permits and Signs (verified by direct visual read of the fee schedule PDF page — pdftotext -layout scrambled this table's columns)
$500.00
Historic District Design Review: AdministrativeTown of Florence Fee Schedule (Rev. 01/15/2025), Section 5, Design Review — applies if HDAC/staff Design Review is triggered for signage in the Historic District (Minor Work track)
$350.00
Historic District Design Review: Planning & Zoning (HDAC hearing)Town of Florence Fee Schedule (Rev. 01/15/2025), Section 5, Design Review — applies for Major Work signage projects requiring a full HDAC hearing
$500.00

Review timeline

Plan reviewFlorence’s published plan-review target
20–35 business days

How long did your Commercial Sign Permit permit actually take in Florence?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final Sign Inspection

    Verifies sign installation matches approved plans, structural anchoring/foundation, and electrical connections for illuminated signs

See the full Florence inspection guide — scheduling & re-inspection fees →

Tips

  • Signs are grouped with plumbing/electrical/mechanical/fire sprinkler/fire alarm/hood systems under 'Commercial New Construction / Tenant Improvement' on the Town's Submittal Review Timelines chart: 10-business-day Administrative Review plus 20 business days for 1st/2nd review (15 for subsequent) — the same 20-35 day realistic range used elsewhere in this file for that review track.
  • If your sign is within the Florence Townsite Historic District, start the HDAC Certificate of Appropriateness process first — it is described as 'often a preliminary requirement' to the building permit itself, and Major Work signage needs a monthly HDAC hearing rather than same-week staff sign-off.
  • No dedicated flat 'sign permit' fee line exists in the Town's Fee Schedule; budget for the standard BOV Commercial Building Permit Fee plus the 65% plan review fee, and add the Comprehensive Sign Plan or Historic District Design Review fee if applicable.
  • Roof-mounted and freestanding pole signs are barred outright in the Historic District (except Town historic markers) — confirm sign type against Chapter 6 of the Historic Preservation Design Guidelines before designing a sign for a downtown storefront.

Frequently asked questions

Florence requires a commercial sign permit for: Building permit required for permanent signs (set on their own foundation, sunk into the ground, or permanently fastened to/painted on a structure, canopy, or awning); temporary signs do not require a building permit but must still comply with Town Code; Applied for on the Building Permit Application (Rev 9.11.25) with 'Sign' checked under the COMMERCIAL permit-type section; Sign permits are grouped under 'Commercial New Construction / Tenant Improvement' on the Town's Submittal Review Timelines chart, explicitly alongside plumbing, electrical, mechanical, fire sprinkler, fire alarm, and hood system work; Signs within the Florence Townsite Historic District additionally require HDAC review: the Historic Preservation Design Guidelines explicitly list 'Construction or placement of signage in the Florence Townsite Historic District' as requiring a Design Review / Certificate of Appropriateness (COA), which is often a preliminary requirement to obtaining the building permit; Minor Work COAs (signage that does not alter the property's appearance/character in a way conflicting with the Guidelines) can be approved administratively by Town Planning Staff, sometimes within days; Major Work (new construction, extensive alteration) requires a full HDAC hearing (held monthly); Historic District sign design standards (Chapter 6): roof signs and freestanding pole signs are prohibited except for Town-erected historic markers; base sign size should not exceed 1 sq ft per lineal foot of street frontage; small LED signs (4 sq ft or less) are allowed only behind windows; neon is limited similarly unless historically documented as larger; all signs must still separately comply with the Florence Town Code's Sign Regulations; A Comprehensive Sign Plan (Administrative, $500) is available for multi-tenant/multi-sign commercial developments as an alternative to permitting each sign individually. If your project isn't listed, confirm with Town of Florence Community Development Department — Building Safety Division at 520-868-7575 before starting work.

In Florence, the published Commercial Sign — Building Permit Fee is: Based on Valuation (Table 1-A) plus 65% plan review fee — see Residential Building Permit fee table for the full valuation chart. Additional published fees: Comprehensive Sign Plan: Administrative — $500.00; Historic District Design Review: Administrative — $350.00; Historic District Design Review: Planning & Zoning (HDAC hearing) — $500.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Florence's published plan-review target for a commercial sign permit is 20–35 business days.

You'll need: Building Permit Application; Sign Plans / Construction Drawings; Owner Authorization Form / Owner Builder Affidavit. Depending on your project, Florence may also ask for: Historic District Design Review Application / Certificate of Appropriateness. See the required-documents checklist on this page for details on each.

Florence requires 1 inspection(s) for a commercial sign permit, in order: Final Sign Inspection. Schedule each through Town of Florence Community Development Department — Building Safety Division (520-868-7575).

Apply through Town of Florence Community Development Department — Building Safety Division at 224 W 20th Street, P.O. Box 2670, Florence, AZ 85132. Phone: 520-868-7575, email: TOFPermits@FlorenceAZ.gov. Office hours: Monday - Thursday, 7:00 a.m. - 5:00 p.m.; closed Fridays (Town of Florence transitioned to a four-day workweek effective January 5, 2026). Inspection Line: 520-868-7601. Residential submittals go through the online Residential Permitting Portal (SmartGov, twn-florence-az.smartgovcommunity.com); commercial submittals are emailed to TOFPermits@FlorenceAZ.gov; in-person submittals accepted (no rolled plans; 1-sided 8.5x11 paper only). Building Official: Kevin Wall (520-868-7556, kevin.wall@florenceaz.gov). Permit Specialist: Susan Cisco (520-868-7665, susan.cisco@florenceaz.gov). Plans Examiner: Hillarey Luther (520-868-7540). Community Development Director: Albert 'AJ' Monroe (520-868-7542).. Official information: https://www.florenceaz.gov/community-development/.

Yes for any permanent sign (wall, monument, projecting, suspended, or awning/canopy) — apply on the Building Permit Application with 'Sign' checked under Commercial. Temporary signs don't need a building permit but must still follow Town Code.

Yes. The Florence Townsite Historic District requires a Certificate of Appropriateness/Design Review from the Historic District Advisory Commission for any sign construction or placement, on top of the standard building permit. Minor Work signage can often be approved administratively by Town Staff within days; Major Work needs a monthly HDAC hearing.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.