Change of Occupancy Permit — Florence, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://www.florenceaz.gov/wp-content/uploads/documents/Community%20Development/Applications/PermitApplication/Packet%20-%20Building%20Permit%20Application%20Rev%209.11.25.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Occupancy Permit in Florence, Arizona
Florence's real local equivalent of a 'change of use' permit: the Town's Building Permit Application lists 'Change of Occupancy' as its own distinct checkbox — separate from 'Certificate of Occupancy' — under BOTH the RESIDENTIAL and COMMERCIAL permit-type sections, with dedicated Existing Use / New Use fields on the application itself. It is not a standalone application form; it is a scope selected on the same Building Permit Application used for new construction, additions, and remodels.
Verified 2026-07-23 · Source
When you need this permit
- Building permit required when a building or tenant space's use/occupancy classification changes (e.g., retail to restaurant, office to assembly), applied for by checking 'Change of Occupancy' on the Building Permit Application (Rev 9.11.25) — available under both the RESIDENTIAL and COMMERCIAL sections of the form
- Application requires stating both the Existing Use and the New Use, plus whether the space has fire sprinklers, in the COMMERCIAL fields section
- Reviewed against the 2018 IBC/IEBC (International Existing Building Code, adopted in its entirety without Town revision) and applicable Town of Florence amendments for the new occupancy classification
- A new Certificate of Occupancy ($75) is issued once the change-of-occupancy review and any required inspections are complete
- Distinct from a Tenant Improvement permit (physical build-out work) — a Change of Occupancy can be required even without physical construction, whenever the classified use of the space changes
- Historic Preservation Design Guidelines separately flag 'Proposed occupancy or use of any commercial or industrial building or site that has been vacant for six (6) months or more' as requiring Historic District Design Review if the property is within the Florence Townsite Historic District
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final / Change of Occupancy Inspection
Verifies the space meets code requirements (egress, fire/life-safety, accessibility) for the new occupancy classification before a new Certificate of Occupancy is issued
See the full Florence inspection guide — scheduling & re-inspection fees →
Tips
- 'Change of Occupancy' is not a separate application — it's a checkbox on the same Building Permit Application used for new construction/remodels, available under both Residential and Commercial, with dedicated Existing Use/New Use fields.
- No dedicated flat fee line was found for Change of Occupancy specifically — expect the standard BOV Building Permit Fee (Table 1-A) plus the $75 Certificate of Occupancy fee upon completion, the same pattern used for other Building Permit Application scopes without their own itemized fee line in this file (e.g., re-roofing).
- If the space has been vacant 6+ months and sits within the Florence Townsite Historic District, the Historic Preservation Design Guidelines require Historic District Design Review for the new occupancy/use in addition to the standard building permit — budget the Design Review timeline (monthly HDAC hearings for Major Work) into your schedule.
- Because Change of Occupancy uses the same Building Permit Application as Tenant Improvement, it falls under the same 'Commercial New Construction / Tenant Improvement' (commercial) or 'Residential' review track on the Submittal Review Timelines chart: 20 business days for 1st/2nd review, 15 for subsequent, plus the 10-business-day Administrative Review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Florence
Change of Occupancy Permit in other cities
Compare change of occupancy permit fees across Arizona →
Look up this fee in a different city →