Change of Occupancy / Certificate of Occupancy Permit in Henderson, Nevada
Covers a change of occupancy classification for an existing building or tenant space where no building modifications are required or completed, plus issuance of a Temporary Certificate of Occupancy and its extension. Henderson prices these as a distinct 'Occupancy Certificates' line item on DSC Fee Schedule Table B — Miscellaneous Building Items. Where the new occupancy DOES require construction or system modifications, the project is instead processed (and fee'd) under the commercial-tenant-improvement-permit entry in this dataset, whose inspections list already includes a 'Final / Certificate of Occupancy' step for that scenario. Henderson's Fire Prevention fee schedule (Table E) separately lists a lower-dollar 'Fire Prevention Contributions' figure for the same three occupancy-certificate items; it is not publicly documented whether that fire-side figure is included within the Table B total shown here or billed as an additional line, so treat the Table B figures below as the confirmed baseline and verify the full total with DSC before budgeting.
Verified 2026-07-22 · Source
When you need this permit
- Applies when no building modifications are required or completed to support the new use/occupancy classification — this is the Table B 'no building modifications' rate
- If modifications are required to support the new occupancy, the project is processed under the commercial-tenant-improvement-permit (Table A rates) instead of this standalone product
- A Temporary Certificate of Occupancy may be issued ahead of final Certificate of Occupancy, with a separate extension fee if more time is needed
- Apply via DSC Online or in person at 240 S Water St
- Fire Safety Engineering sign-off is part of occupancy certificate issuance — Table E lists a parallel 'Fire Prevention Contributions' fee for the same three items, indicating fire review is a required component of the process even when no fire-system construction is involved
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final / Change-of-Occupancy Inspection
Verifies life-safety systems (egress, fire separation, occupant load posting, extinguishers) are adequate for the new occupancy classification without requiring building modification
See the full Henderson inspection guide — scheduling & re-inspection fees →
Tips
- Henderson's Table B 'Occupancy Certificates' fees apply only when no building modifications are needed; if any construction is required to support the new use, the project is processed and fee'd as a Commercial Tenant Improvement Permit instead (see the commercial-tenant-improvement-permit entry in this dataset).
- Table E (the fire fee schedule) separately lists a lower 'Fire Prevention Contributions' figure for the same three occupancy-certificate items ($359 / $202 / $379) — whether that is a component already folded into the Table B totals above or an additional charge is not published; confirm the all-in total with DSC (702-267-3650) before budgeting.
- Use the DSC Fee Estimator or call Building Plan Check (702-267-3650, bldgplancheck@cityofhenderson.com) for a project-specific quote, since no independently confirmed review timeline exists for this permit type.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-22.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Henderson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Henderson
Change of Occupancy / Certificate of Occupancy Permit in other cities
Compare change of occupancy / certificate of occupancy permit fees across Nevada →
Look up this fee in a different city →
Now live
Build your Henderson project checklist
Describe your project once and get every permit, document, and fee it triggers in Henderson — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →