When you need this permit
- Installation, replacement, or repair of any hard-wired electrical system
- Panel upgrades and service entrance changes
- New circuits or rewiring
- Electric vehicle charger (EV receptacle) installation
- Generator electrical connections
- Nevada State Contractor's license required for contractor work
- Note: For new construction, electrical is included in the Table A building permit fee — standalone Table C fees apply to alterations/replacements
Required documents
- Req
Building / Electrical Permit Application
Available via DSC Online portal or in person at 240 S Water St
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Service regardless of amperage (including first meter socket) | $190 | Henderson DSC Fee Schedule Table C — Building MPE Items, effective 10/01/2025 |
| Each individual meter socket / sub-panel / distribution board | $175 | Table C |
| Each appliance (no limit to HP, KW, or KVA rating) | $155 | Table C — applies to HVAC appliances, water heaters, dryers, ranges, etc. |
| Each general lighting outlet, receptacle outlet, or switch (multi-outlet assembly per 5 ft or portion) | $152 | Table C |
| EV receptacle (not part of a PV system) | $223 | Table B — Miscellaneous Building Items; EV receptacle fee |
| Each temporary power pole or service | $206 | Table C |
| Signal, alarm, television outlet, control panel, antenna, or telephone switchboard (over 50 volts) | $178 | Table C |
| Underwater light (each) | $190 | Table C |
| Other electrical inspections (per hour) | $286 | Table C |
| Stand-alone electrical plan check (hourly) | $429 | Table C |
Review timeline
~1–10 business days
Typical estimate — confirm current times with the Henderson building department
Inspection process
- 1
Rough-In Electrical
Conduit, wiring, and box placement before walls closed
- 2
Final
All devices installed, panel labeled, GFCI/AFCI protection verified, service energized
Tips
- Henderson uses 2023 NEC with Southern Nevada amendments — effective January 2, 2026.
- For new construction, MPE is included in the Table A permit. Only standalone trade work uses Table C unit fees.
- EV receptacles not associated with a PV system are permitted under Table B at $223 each.
- All permit applications through DSC Online; office open Mon–Thu only.
Frequently asked questions
- How much does a panel upgrade cost to permit in Henderson?
- A service entrance/panel upgrade is $190 per the Henderson DSC Fee Schedule Table C (effective 10/01/2025). Additional meter sockets or sub-panels are $175 each.
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
- City of Henderson Building and Fire Safety Department — Development Services Center — official building department
- Henderson DSC Fee Schedule — Table C: Building MPE Items, effective 10/01/2025
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Henderson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Henderson
Related guides
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.