EV Charger / Electric Vehicle Charging Station Permit in Florence, Arizona

Florence has no dedicated EV charger permit — installation of an electric vehicle charging station (Level 1/2 EVSE) is electrical work and is processed under the same combined MPEW (Mechanical/Plumbing/Electrical/Walls-fences) and Inspection Permit Application used for the electrical-permit entry, billed at the Town's flat Utility Permit fee (Electrical category). No distinct EV-specific fee line was found in the Town's Fee Schedule. Re-chased 2026-07-20: directly downloaded and text-extracted the live Fee Schedule PDF, confirming the $75.00 residential / $300.00 commercial Utility Permit (Electrical) fee figures are still current.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical permit required for the EV charger circuit installation (new wiring, dedicated circuit, or panel/service work), same as any other electrical work
  • Applied for on the combined MPEW / Inspection Permit Application (Rev 9.11.25), selecting 'Electrical' as Permit Type
  • Governed by the National Electrical Code as adopted by the Town (see electrical-permit entry for edition-year notes)
  • Apply via the SmartGov Residential Permitting Portal or email TOFPermits@FlorenceAZ.gov for commercial
  • Arizona's statewide solar/PV statute (A.R.S. § 9-468) does not itself address EV charger permitting specifically, but Florence's general electrical permit fee-caps and process apply the same way to EV circuits as to any other electrical scope

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Utility Permit — Electrical (applies to EV charger circuit; no distinct EV line), ResidentialTown of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees — same flat fee documented on the electrical-permit entry Re-confirmed live 2026-07-20 via direct PDF text extraction.
$75.00
Utility Permit — Electrical (applies to EV charger circuit; no distinct EV line), CommercialTown of Florence Fee Schedule (Rev. 01/15/2025), Section 2, Utility Permit Fees Re-confirmed live 2026-07-20 via direct PDF text extraction.
$300.00

Review timeline

Plan reviewFlorence’s published plan-review target
0–25 business days

How long did your EV Charger / Electric Vehicle Charging Station Permit permit actually take in Florence?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    EV charger equipment installed and tested; electrical bonding/grounding verified

See the full Florence inspection guide — scheduling & re-inspection fees →

Tips

  • There is no separate 'EV charger permit' in Florence — apply for the standard Electrical Permit (Utility Permit category) using the combined MPEW application.
  • A simple utility clearance/EV circuit is processed over the counter with no formal review when complete; work requiring fuller plan review falls under the Town's 'Residential' review category (10-day Administrative Review plus 20 business days for 1st/2nd review), matching the electrical-permit entry's timeline.

Frequently asked questions

Florence requires an ev charger / electric vehicle charging station permit for: Electrical permit required for the EV charger circuit installation (new wiring, dedicated circuit, or panel/service work), same as any other electrical work; Applied for on the combined MPEW / Inspection Permit Application (Rev 9.11.25), selecting 'Electrical' as Permit Type; Governed by the National Electrical Code as adopted by the Town (see electrical-permit entry for edition-year notes); Apply via the SmartGov Residential Permitting Portal or email TOFPermits@FlorenceAZ.gov for commercial; Arizona's statewide solar/PV statute (A.R.S. § 9-468) does not itself address EV charger permitting specifically, but Florence's general electrical permit fee-caps and process apply the same way to EV circuits as to any other electrical scope. If your project isn't listed, confirm with Town of Florence Community Development Department — Building Safety Division at 520-868-7575 before starting work.

In Florence, the published Utility Permit — Electrical (applies to EV charger circuit; no distinct EV line), Residential is: $75.00. Additional published fees: Utility Permit — Electrical (applies to EV charger circuit; no distinct EV line), Commercial — $300.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Florence's published plan-review target for an ev charger / electric vehicle charging station permit is 0–25 business days.

You'll need: MPEW / Inspection Permit Application; Site Plan; Owner Authorization Form / Owner Builder Affidavit. See the required-documents checklist on this page for details on each.

Florence requires 2 inspection(s) for an ev charger / electric vehicle charging station permit, in order: Rough-In, Final. Schedule each through Town of Florence Community Development Department — Building Safety Division (520-868-7575).

Apply through Town of Florence Community Development Department — Building Safety Division at 224 W 20th Street, P.O. Box 2670, Florence, AZ 85132. Phone: 520-868-7575, email: TOFPermits@FlorenceAZ.gov. Office hours: Monday - Thursday, 7:00 a.m. - 5:00 p.m.; closed Fridays (Town of Florence transitioned to a four-day workweek effective January 5, 2026). Inspection Line: 520-868-7601. Residential submittals go through the online Residential Permitting Portal (SmartGov, twn-florence-az.smartgovcommunity.com); commercial submittals are emailed to TOFPermits@FlorenceAZ.gov; in-person submittals accepted (no rolled plans; 1-sided 8.5x11 paper only). Building Official: Kevin Wall (520-868-7556, kevin.wall@florenceaz.gov). Permit Specialist: Susan Cisco (520-868-7665, susan.cisco@florenceaz.gov). Plans Examiner: Hillarey Luther (520-868-7540). Community Development Director: Albert 'AJ' Monroe (520-868-7542).. Official information: https://www.florenceaz.gov/community-development/.

Florence, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The Town of Florence Town Council adopted its own Technical Codes by reference (Town of Florence Code of Ordinances § 150.300, Exhibit A) and independently administers permitting through its Community Development Department / Building Safety Division; it does not defer to Pinal County for permitting within town limits. Source: Town of Florence Code of Ordinances, Technical Codes, Exhibit A (Adopted Building Codes Amendments PDF).; 2018 International Building Code (IBC), including Appendices B, C, and I, adopted by reference (§ 150.300(A)(1)), with Town of Florence amendments. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A), effective per Town Council adoption (document created/effective 2022, current as of this review — no 2024 IBC/ICC-cycle adoption found in effect as of 2026-07-06).; 2018 International Residential Code (IRC), including Appendices G, H, and P (with Appendices E, H, J, P, and Q separately confirmed adopted at § R102.5 amendment), adopted by reference (§ 150.300(A)(2)), with Town of Florence amendments including amended Climatic and Geographic Design Criteria and a mandatory-cooling requirement. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).; 2018 International Mechanical Code (IMC), adopted by reference (§ 150.300(A)(3)), with Town of Florence amendments (guards exception and mandatory cooling-system amendment for 1- and 2-family dwellings). Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).; International Plumbing Code adopted by reference (§ 150.300(A)(4)); the Town's own codified adoption list states '2018 Edition' at the top-level adoption clause, but the itemized amendment section of the same official document (item 10) separately lists a '2012 Edition' with two specific section amendments (§ 410.3 Substitution; § 903.1 Roof extension) — this is an inconsistency within the Town's own published Exhibit A document, reproduced here verbatim rather than resolved by assumption. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A), §150.300(A)(4) and item 10.; 2018 International Fuel Gas Code (IFGC), adopted by reference (§ 150.300(A)(5)), with Town of Florence amendments (LPG appliance location restriction, minimum burial depth, test-pressure measurement procedure). Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).; 2018 International Energy Conservation Code (IECC), adopted by reference (§ 150.300(A)(6)); the Town amended the code by deleting the entire Residential Section and Chapter 11 Energy Efficiency of the 2018 IRC. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).; 2018 International Existing Building Code (IEBC), adopted by reference (§ 150.300(A)(7)) in its entirety without revision. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).; 2018 International Swimming Pool and Spa Code, adopted by reference (§ 150.300(A)(8)) in its entirety without revision. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).; 2018 International Fire Code (IFC), including Appendices B, C, D, E, F, G, and I, adopted by reference (§ 150.300(A)(9)) as the Town's uniform fire code, with extensive Town of Florence amendments (definitions, fire apparatus access roads, fire flow/water supply, alarm/suppression system requirements, open burning). Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).; International Property Maintenance Code, 2018 Edition, adopted by reference (§ 150.300(A)(10)) in its entirety without revision. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).; National Electrical Code (NEC) — the Town's top-level codified adoption clause (§ 150.300(A)(11)) states '2017 Edition,' but the itemized amendment section of the same official document (item 17) separately states 'National Electrical Code, 2018 Edition' when adding a new performance-testing subsection (Article 230.11) for 1,000-amp-or-larger service equipment. This is an inconsistency within the Town's own published document, reproduced here verbatim rather than resolved by assumption; both editions are cited directly from the Town's Adopted Building Codes Amendments (Exhibit A) as published.; ICC A117.1 Accessible and Usable Buildings and Facilities Code, 2010 Edition Standards, adopted by reference (§ 150.300(A)(12)) in its entirety without revision. Source: Town of Florence Adopted Building Codes Amendments (Exhibit A).; Manufactured homes and park models are regulated directly by the State of Arizona (Office of Manufactured Housing, A.R.S. § 41-4001 et seq.) for construction/installation standards; the Town issues a separate Manufactured Home Set permit ($450, per the most current Office of Manufactured Housing Intergovernmental Agreement) and a Park Model Placement permit ($450) for on-site placement. Source: Town of Florence Fee Schedule (Rev. 01/15/2025), Section 2.. Local amendments apply — see the Florence overview page for the full list.

No. An EV charger circuit is billed and processed as a standard Electrical Utility Permit ($75 residential / $300 commercial), using the same combined MPEW application as any other electrical work — there is no separate EV-specific permit or fee.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.