Plumbing Permit — Florence, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.florenceaz.gov/wp-content/uploads/documents/Community%20Development/Applications/PermitApplication/Packet%20-%20Mechanical,%20Plumbing,%20Electrical%20Application%20Rev%209.11.25.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Plumbing Permit in Florence, Arizona
Required for plumbing installation, alteration, or repair work in Florence, using the Town's combined MPEW Permit Application. The Town's own published code-adoption document shows an internal inconsistency on IPC edition (see codesAdopted note): the top-level adoption clause states 2018 IPC while the itemized amendment section separately references a 2012-edition section numbering for two specific amendments.
Verified 2026-07-06 · Source
When you need this permit
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and some gas piping
- Applied for on the combined MPEW / Inspection Permit Application (Rev 9.11.25), selecting 'Plumbing' as Permit Type
- Water heater pan required in attic/furred-space installations where leakage could cause damage (galvanized steel, min. 0.0236 in / No. 24 gage, or listed equivalent per CSA LC3) — Town amendment to § P2801.5
- Sewer depth minimum 12 inches — Town amendment to § P2603.5.1
- Some gas lines are processed as Right-of-Way Non-Utility miscellaneous items (over-the-counter, no formal review) per the Town's review timeline chart
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, cleanouts, 12-inch minimum sewer depth
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, water heater pan (if required) and gas connections verified, no leaks
See the full Florence inspection guide — scheduling & re-inspection fees →
Tips
- Some gas lines are on the Town's Right-of-Way Non-Utility miscellaneous list — over-the-counter with no formal review when a complete submittal is emailed (10/5-day review applies to emailed submittals per the timeline chart's note).
- Plumbing work requiring plan review is grouped under 'Residential' on the Town's Submittal Review Timelines chart: 10-day Administrative Review plus 20 business days for 1st/2nd review, 15 for subsequent.
- Storage-tank water heaters installed in an attic or furred space require a galvanized steel drain pan per the Town's amended § P2801.5, unless another listed pan meeting CSA LC3 is used.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Florence building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Florence
Plumbing Permit in other cities
Compare plumbing permit fees across Arizona →
Look up this fee in a different city →