Skip to main content
PermitBase

Sign Permit (Commercial / Business Signage) in Benson, Arizona

Required to erect, re-erect, construct, alter, relocate, or maintain most commercial/business signs in the City of Benson, per the City's Zoning Regulations, Section Fifteen (Sign Regulations), originally adopted by Ordinance 330 (12/18/1989) and subsequently amended (most recently by Ordinance 449, 8/19/2002); the currently posted Zoning Regulations document (fetched directly from bensonaz.gov) carries a cover-page revision date of 01/13/2025 but a filename indicating a further update via Ordinance 647 (6/8/2026). Signage has its own dedicated inspection category (Signage: Setbacks, Electrical if applicable, Final) on the City's Required Inspections List.

Verified 2026-07-23 · Source

When you need this permit

  • A building permit from the Building Inspector is required to erect, re-erect, construct, repair, alter, relocate, or maintain any sign as defined in Zoning Regulations Section Fifteen, except for sign types specifically exempted
  • Exempt from a building permit: nameplate signs, home occupation signs, real estate/political/contractor/developer signs, non-illuminated wall signs not exceeding 50 square feet, repairs or repainting not exceeding $200.00 in value, and window signs
  • Application for a sign building permit must be accompanied by, at minimum, a site plan, construction plans, and written consent of the landowner
  • Permitted sign type, size, and height vary by zoning district (Residential, B-1 Neighborhood Business, B-2 General Business, Industrial, Rural Transitional) per Zoning Regulations Section Fifteen; e.g., B-1 districts authorize 50 sq ft of signage per building frontage (up to 75 sq ft aggregate based on frontage), B-2 districts authorize 75 sq ft (up to 150-200 sq ft aggregate depending on location), and Industrial districts authorize 100 sq ft (up to 300 sq ft aggregate)
  • Signs are additionally constructed/maintained per the Uniform Sign Code, Uniform Building Code, and National Electric Code as referenced in Section Fifteen; current structural/electrical work in the City is otherwise governed by the 2024 IBC/IRC and 2023 NEC as adopted by Ordinance 645 (2015 editions for applications filed before May 13, 2026) — no separate re-adoption of Section Fifteen's sign-specific code references was found alongside Ordinance 645
  • The Building Official may revoke a sign permit found to be in violation of its terms, and may approve a one-time extension (up to one year) of a sign's required removal date upon application and proof of need
  • A sign advertising a business no longer conducted, or products no longer sold, at that location must be removed by the owner/agent within 10 days of the business terminating; the City may remove it 30 days after written notice to the property owner, billing removal costs to the owner
  • For businesses fronting an Arizona Department of Transportation (ADOT) right-of-way (e.g., along I-10), a State of Arizona sign permit does not eliminate the need for a separate City of Benson sign permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Non-Illuminated Wall Sign, or Non-Illuminated Wood Ground Sign (≤ 20 ft height)Zoning Regulations, Section Fifteen ('Sign Permit Fees'); this flat-fee provision was adopted in 1989-2002 and no superseding fee resolution specific to signs was found — treated as still in force absent contrary evidence
$15.00 flat building permit fee
All Other Signs (not covered by the $15 flat fee above)IMPORTANT CORPUS-WIDE FLAG: two different versions of this general valuation-based fee table were found during this research. (1) The City Code Chapter 16 compilation already cited throughout this file ('Website Posting updated 4-2023.pdf', Resolution 16-2011) uses a coarser formula (e.g., $83.00 at $2,000 valuation). (2) The 'Building Permit Fee Schedule' PDF currently linked from the live bensonaz.gov Building Department page (fetched and visually verified 2026-07-23) uses a more granular per-$100/$1,000 table with materially different low-end values (e.g., $99.00 at $2,000 valuation, not $83.00), though it converges to the same plan-review ratio (65%) and per-$1,000 marginal rates ($6.70/$5.70/$4.40) at higher valuations. No dated resolution number appears on the newer live schedule. This entry cites the general schedule by reference only (consistent with how electrical/plumbing/mechanical/roofing/solar/demolition permits are documented elsewhere in this file) — the controlling session should reconcile which schedule is authoritative across ALL trade-permit entries in this file, not just this one.
Billed as a standard building permit under the general valuation-based Building Permit Fee schedule, per Zoning Regulations Section Fifteen ('the building permit fee shall be as established in the Uniform Building Code')
Plan Review Fee (signs billed under the general valuation schedule only; not applicable to the $15 flat-fee sign types)City Code of the City of Benson, Chapter 16, Building Division; confirmed as the same ratio on the live Building Permit Fee Schedule PDF
65 percent of the calculated permit fee

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit (Commercial / Business Signage) permit actually take in Benson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Setbacks

    Verifies sign placement complies with the approved site plan and zoning-district location requirements

  2. 2

    Electrical (if applicable)

    For illuminated signs with electrical connections

  3. 3

    Final

    Completed sign verified against approved permit (size, height, placement, illumination)

See the full Benson inspection guide — scheduling & re-inspection fees →

Tips

  • Common, smaller sign types (non-illuminated wall signs and non-illuminated wood ground signs ≤ 20 ft) carry a flat $15.00 building permit fee under Zoning Regulations Section Fifteen — most other signs are billed under the general valuation-based Building Permit Fee schedule instead.
  • Many common sign types are exempt from a permit entirely: nameplate signs, home occupation signs, real estate/political/contractor/developer signs, non-illuminated wall signs ≤ 50 sq ft, minor repairs/repainting (≤$200), and window signs.
  • Allowable signage area is set per zoning district and scales with building/property street frontage — confirm your district's allowance (Residential, B-1, B-2, Industrial, or Rural Transitional) before designing a sign.
  • A State of Arizona (ADOT) outdoor-advertising permit does not substitute for the required City of Benson sign permit for properties fronting a State right-of-way.

Frequently asked questions

In most cases yes. The City's Zoning Regulations (Section Fifteen) require a building permit from the Building Inspector to erect, alter, relocate, or maintain a sign, with specific exemptions (nameplate, home occupation, real estate/political/contractor/developer signs, small non-illuminated wall signs, minor repairs, and window signs).

Non-illuminated wall signs and non-illuminated wood ground signs (20 ft or less) carry a flat $15.00 fee. All other signs are billed under the City's general valuation-based Building Permit Fee schedule (City Code Chapter 16), with plan review at 65 percent of the calculated permit fee.

Benson does not publish a plan-review timeline for this permit. Contact City of Benson Building Department (Community Development) at 520-720-6328 for current turnaround.

You'll need: Online Building Permit Application (iWorQ Citizen Portal); Site Plan, Construction Plans, and Written Landowner Consent; A.R.S. Title 32 Form. See the required-documents checklist on this page for details on each.

Benson requires 3 inspection(s) for a sign permit (commercial / business signage), in order: Setbacks, Electrical (if applicable), Final. Schedule each through City of Benson Building Department (Community Development) (520-720-6328).

Apply through City of Benson Building Department (Community Development) at 120 W. 6th Street, Benson, AZ 85602 (City Hall / general administration: 101 E. 6th Street, Benson, AZ 85602). Phone: 520-720-6328, email: permits@bensonaz.gov. Office hours: City Hall general office hours: Monday, Tuesday, Thursday, Friday 8:00 AM - 5:00 PM MST; Wednesday 1:00 PM - 5:00 PM MST (Source: City of Benson Contact Us page). Building permit applications are submitted online via the City's iWorQ citizen portal (bensonbuilding.portal.iworq.net); all plan documents, calculations, drawings, and spec sheets must be uploaded in PDF format (image files such as JPEG/TIFF/GIF are not accepted). Plan reviews are performed on a first-come, first-served basis; emergency repairs such as utility or structural failures may take precedence. To request an inspection, email permits@bensonaz.gov at least 24 hours in advance with name, contact number, requested date, permit number, project address, and inspection type.. Official information: https://web.archive.org/web/20251124160757/https://www.bensonaz.gov/departments/building_department/index.php.

Benson, Arizona has adopted: Arizona has no statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (Arizona Revised Statutes Title 9). The City of Benson independently adopts and administers its own construction codes through its Building Department. Source: Ordinance 645 (City of Benson, adopted April 13, 2026), whereas clause citing A.R.S. Title 9.; 2024 International Building Code (IBC), as amended by Exhibit A to Resolution 11-2026, adopted by reference in Benson City Code Chapter 7, Section 7-1-2 ('Building Codes Adopted'). Per Ordinance 645, all new permit applications received after May 13, 2026 (30 days after the April 13, 2026 adoption date) must comply with this code; plans already in review or approved before that date may remain on the previously adopted 2015 IBC cycle. Source: Ordinance 645, City of Benson (passed and adopted April 13, 2026).; 2024 International Residential Code (IRC), as amended by Exhibit B to Resolution 11-2026, adopted by reference in Benson City Code Chapter 7, effective for new applications received on/after May 13, 2026. Source: Ordinance 645, City of Benson.; 2024 International Mechanical Code (IMC), as amended by Exhibit D to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Plumbing Code (IPC), as amended by Exhibit E to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Fuel Gas Code (IFGC), as amended by Exhibit F to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Existing Building Code (IEBC), as amended by Exhibit G to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Swimming Pool and Spa Code (ISPSC), as amended by Exhibit H to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2024 International Fire Code (IFC), as amended by Exhibit I to Resolution 11-2026, adopted by reference as the City's uniform fire code. Source: Ordinance 645, City of Benson.; 2024 International Property Maintenance Code (IPMC), as amended by Exhibit J to Resolution 11-2026, adopted by reference. Source: Ordinance 645, City of Benson.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by reference as amended by Exhibit C to Resolution 11-2026 (one edition behind the 2024 ICC set, consistent with the standard NFPA/ICC release-cycle offset). Source: Ordinance 645, City of Benson.; Immediately prior to Ordinance 645 (i.e., for plans submitted and approved before May 13, 2026), the City had adopted the 2015 editions of the International Building, Residential, Mechanical, Plumbing, Fuel Gas, Existing Building, Swimming Pool and Spa, and Property Maintenance Codes, plus the 2015 International Fire Code and 2014 NFPA 70 National Electrical Code, per the former Benson City Code Chapter 7, Section 7-1-1 (Resolution 36-2017). Source: City of Benson Building Department page (Wayback Machine capture, November 24, 2025) and City Code of the City of Benson, Arizona (posting updated April 2023).; Manufactured homes, mobile homes, and factory-built buildings: the City of Benson has an Inspection Services Agreement with the Arizona Department of Housing (ADOH), effective May 3, 2021 for a five-year term, under which the City (as ADOH's local enforcement agency) monitors and enforces ADOH's installation standards (A.R.S. § 41-4004(A)(4); A.A.C. R4-34-102, R4-34-204, R4-34-606, R4-34-801) for manufactured home, mobile home, and factory-built building installations within city limits, including setback and tie-down inspections. Source: Resolution 11-2021 and attached Inspection Services Agreement Between Arizona Department of Housing and City of Benson.; ICC A117.1-2017 Standard and Commentary (Accessible and Usable Buildings and Facilities) is referenced by the City as its accessibility standard, in addition to the federal ADA framework. Source: City of Benson Building Department page.. Local amendments apply — see the Benson overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Benson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.