Residential Building Permit (New Single-Family / Duplex / Multi-Family Construction) — Benson, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://web.archive.org/web/20251124160757/https://www.bensonaz.gov/departments/building_department/index.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit (New Single-Family / Duplex / Multi-Family Construction) in Benson, Arizona
Required for new single-family, duplex, and multi-family residential construction in the City of Benson. Reviewed against the 2024 IRC and 2024 IBC as adopted by Ordinance 645 (effective for applications received on/after May 13, 2026; earlier submittals remain on the 2015 IRC/IBC cycle). Applications are submitted through the City's online iWorQ Building/Demolition Permit Application portal.
Verified 2026-07-06 · Source
When you need this permit
- Building permit required for new single-family, duplex, and multi-family dwelling construction within Benson city limits
- Plans must comply with the 2024 IRC (or 2015 IRC for applications filed before May 13, 2026) as adopted and amended by the City of Benson via Ordinance 645 / Resolution 11-2026
- One detached site plan (separate from the construction plan set) at 1"=20' scale (8.5x14 or 11x17 paper), showing lot dimensions, Tax Parcel ID, setbacks, street/driveway details, structure square footages, easements, and utility routing
- Two complete sets of construction plans (11x17 at 1/8" scale computer-drawn, or 18x24 at 1/4" scale) plus a soils report at time of submittal; engineered design required for structural components retaining 4+ feet of earth; post-tension slabs (or equal) required due to unstable soil conditions City-wide
- Signed A.R.S. Title 32 form required as part of the online application submittal
- Hydrant system must be operational and subdivision roads paved (ingress/egress) before permit issuance; ADEQ Certificate of Completion required for water/sewer (model homes may receive Public Works sign-off without it if not yet connected)
- HOA review verification required prior to submittal if the project is within an HOA-governed area
- Permit valid 180 days from issue date; expires if no inspection progress for 6 consecutive months; one no-charge 6-month extension available within the initial 12-month period if significant progress (generally past framing) has been made
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Setbacks
Verifies structure location against approved site plan; performed at sub-floor plumbing or footing inspection stage
- 2
Underground Utilities
Prior to backfill/compaction and prior to placement of concrete
- 3
Foundation (Footing/Rebar pre-pour, Interior Footings, Pre-slab pre-pour, Soil Compaction, Stem)
Multiple sub-inspections before concrete pour; minimum 95% soil compaction required for building pad
- 4
Framing
Includes floor deck, rough frame, and lateral bracing/shear wall inspections
- 5
Lath
After vapor barrier, foam, and wire installed
- 6
Gas / Electrical (if applicable)
Rough gas piping and electrical inspections where applicable
- 7
Intermediates / Insulation / Sheetrock
Nailing inspection prior to taping or texture; gas test inspection may occur at this stage or later
- 8
Final
All phases of construction complete, just prior to occupancy
See the full Benson inspection guide — scheduling & re-inspection fees →
Tips
- The City's Required Inspections List distinguishes Single Family Residence, Duplex, and Multi-Family inspection sequences separately, though all follow the same general setbacks-to-final progression with trade-specific rough-ins and a final.
- Plan reviews are performed on a first-come, first-served basis; emergency repairs (utility or structural failures) may take precedence, per the City of Benson Building Department page.
- As of July 2026, the City of Benson does not appear to publish a permit-specific plan review turnaround time (e.g., a stated number of business days) for residential building permits on its public website, fee schedule PDF, or code-adoption ordinance. The City states only that review is 'first come, first served.' There is no verifiable published numeric timeline; call the Building Department at 520-720-6328 for a current estimate.
- Projects that impact Arizona Department of Transportation (ADOT) state routes require proof of access from ADOT before permit issuance, and an ADEQ-stamped Certificate of Completion is required for water/sewer connections.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Benson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Benson
Residential Building Permit (New Single-Family / Duplex / Multi-Family Construction) in other cities
Look up this fee in a different city →
Now live
Build your Benson project checklist
Describe your project once and get every permit, document, and fee it triggers in Benson — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →