Skip to main content
PermitBase

Manufactured Home Installation Permit in Fruitland, Idaho

Required for installing/blocking and tying down a manufactured, mobile, or modular home in Fruitland. Tracked as its own permit category ('Manufactured Home') in the City's 2025 Annual Building Report, with 'Block & Tie Down' as the recorded type of work.

Verified 2026-07-07 · Source

When you need this permit

  • Applies to manufactured, mobile, and modular home installations, including block-and-tie-down work
  • Confirmed as a distinct permit tracking category separate from the general Building Permit in the City's own permit records

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Manufactured Home InstallationCity of Fruitland Fee Schedule, adopted September 8, 2025 (Resolution No. 2025-08); matches the exact fee charged on real Manufactured Home permits (e.g., MFH2025-00002 through MFH2025-00006) in the City's 2025 Annual Building Report
$150.00

Review timeline

Plan review
Not published — contact the department

How long did your Manufactured Home Installation Permit permit actually take in Fruitland?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verify block-and-tie-down installation meets manufacturer specifications and applicable code

See the full Fruitland inspection guide — scheduling & re-inspection fees →

Tips

  • The flat $150.00 fee applies regardless of the home's value — confirmed against real 2025 permit records showing valuations from $0.00 to over $74,000 all charged the same $150.00 fee.

Frequently asked questions

Fruitland requires a manufactured home installation permit for: Applies to manufactured, mobile, and modular home installations, including block-and-tie-down work; Confirmed as a distinct permit tracking category separate from the general Building Permit in the City's own permit records. If your project isn't listed, confirm with City of Fruitland Building Department at (208) 452-4946 before starting work.

The City of Fruitland charges a flat $150.00 Manufactured Home Installation fee for block-and-tie-down work, regardless of the home's value.

Fruitland does not publish a plan-review timeline for this permit. Contact City of Fruitland Building Department at (208) 452-4946 for current turnaround.

You'll need: Building Permit Application. See the required-documents checklist on this page for details on each.

Fruitland requires 1 inspection(s) for a manufactured home installation permit, in order: Final. Schedule each through City of Fruitland Building Department ((208) 452-4946).

Apply through City of Fruitland Building Department at 200 S. Whitley Drive, Fruitland, ID 83619. Phone: (208) 452-4946, email: bearles@fruitland.org. Office hours: Inspections requested by phone; calls received before 3:00 PM are scheduled for the next business day, calls after 3:00 PM scheduled for the second business day. Building Official: Danny Little (dlittle@fruitland.org); Building Inspector: Brandon Tarvin (btarvin@fruitland.org); Building Clerk: Beth Earles (bearles@fruitland.org).. Official information: https://www.fruitland.org/building.

Fruitland, Idaho has adopted: 2018 International Building Code (IBC); 2018 International Residential Code (IRC); 2018 International Energy Conservation Code (IECC); 2018 International Mechanical Code (IMC); 2012 International Fuel Gas Code (IFGC); 2015 International Fire Code (IFC); Current version of the Uniform Code for the Abatement of Dangerous Buildings; Current version of the Uniform Sign Code; Plumbing and electrical permits/inspections are administered directly by the State of Idaho, not the City of Fruitland. Local amendments apply — see the Fruitland overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Fruitland building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.