Inspection sequence, scheduling, and re-inspection fees for building permits in Fruitland, Idaho.

Verified 2026-07-07 · Source

How to schedule

Inspections are requested through the building department below.

Address
200 S. Whitley Drive, Fruitland, ID 83619
Phone
(208) 452-4946
Office hours
Inspections requested by phone; calls received before 3:00 PM are scheduled for the next business day, calls after 3:00 PM scheduled for the second business day. Building Official: Danny Little (dlittle@fruitland.org); Building Inspector: Brandon Tarvin (btarvin@fruitland.org); Building Clerk: Beth Earles (bearles@fruitland.org).

Inspection sequence

Applies to: Building Permit (New Construction, Additions, Remodels)

  1. 1

    Footing

    Before concrete pour

  2. 2

    Foundation/Stem Wall

    Foundation or stem wall inspection

  3. 3

    Under Floor

    Under-floor framing/systems inspection prior to floor cover

  4. 4

    Shear Wall

    Shear wall nailing/hardware inspection

  5. 5

    Framing

    Performed together with the mechanical rough-in inspection

  6. 6

    Air Seal

    Air sealing inspection prior to insulation

  7. 7

    Insulation

    Insulation inspection

  8. 8

    Final

    Performed together with the mechanical final inspection

Applies to: Mechanical Permit

  1. 1

    Pressure Test

    Gas line/system pressure test

  2. 2

    Rough-In/Piping

    Performed together with the framing inspection

  3. 3

    Final

    Performed together with the final building inspection

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    State Electrical Inspection

    Performed by DOPL, covering interconnection wiring, disconnects, and equipment grounding per the adopted NEC edition

  2. 2

    City Building Final

    Racking/mounting attachment and roof penetration sealing verified against approved City building permit plans

Re-inspection fees

Building Permit (New Construction, Additions, Remodels)Re-Inspection · City of Fruitland Fee Schedule effective September 8, 2025
$65.00

Fruitland building permits

Get alerts for Fruitland

We'll email you when Fruitland's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.