Manufactured/Mobile Home and Factory-Built Building Installation Permit — Winslow, Arizona · Requirements sheet
Verified 2026-07-13 · Source: https://www.winslowaz.gov/page/community-development
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Manufactured/Mobile Home and Factory-Built Building Installation Permit in Winslow, Arizona
Required for installation of manufactured/mobile homes and factory-built buildings (residential, commercial, and classroom) in the City of Winslow, with dedicated flat/per-linear-foot fees published in the City's fee schedule (Ordinance No. 637, Schedule 3, Section 3-7).
Verified 2026-07-13 · Source
When you need this permit
- Permit required for placement/installation of mobile homes, manufactured homes, and factory-built buildings within Winslow city limits
- Governed by Winslow Municipal Code Title 15, Chapter 15.28 (Manufactured Homes and Recreational Vehicles), in addition to the applicable adopted construction codes
- A 6-month permit extension is available for an additional fee
- Rehabilitation of an existing mobile home carries an income-tiered fee based on Area Median Income (AMI) status
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Set-up/Foundation
Verifies foundation and tie-down/anchoring prior to occupancy
- 2
Utility Connections
Electrical, plumbing, and gas connections
- 3
Final
Completed installation verified; up to 3 inspections included in the base fee for most categories
See the full Winslow inspection guide — scheduling & re-inspection fees →
Tips
- Mobile/Manufactured Home and Factory Built Building (Residential) permits each include 3 inspections in the base $650 fee — additional/re-inspections beyond that are billed at $175 each.
- Rehabilitation of an existing mobile home has an income-based sliding fee ($49 vs. $306) tied to Area Median Income status, a distinctive feature not seen in Winslow's other permit fee lines.
- A 6-month extension is available for $100 if the work needs more time beyond the initial permit period.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Winslow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Winslow
Manufactured/Mobile Home and Factory-Built Building Installation Permit in other cities
Look up this fee in a different city →
Now live
Build your Winslow project checklist
Describe your project once and get every permit, document, and fee it triggers in Winslow — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →